ITEM-00001 3 | 3 G STATION BPST DRAIN PIPELINE
REPLACEMENT WORK INCLUDING MATERIAL G
STATION BPST DRAIN PIPELINE NEED TO REPLACE
WITH THE FOL
LOWING SPECIFICATION AND JOB SCOPE: SCOPE
OF WORK: 1.#MOBILIZING AND DEMOBILIZING OF
WORK FORCE, EQUIPMENT, TOOLS,
CONSUMABLES ETC.
2.#MEASUREMENT TO BE TAKEN PRIOR TO THE
WORK. 3.#TOOLS AND EQUIPMENT: NECESSARY
HAND TOOLS AND TESTING MATERIAL ETC
4.#MATERIAL: ALL
MATERIAL REQUIRED TO COMPLETE THE WORK
SUCH AS PIPES, ELBOW, SOCKET, UNION, FLANGE
ETC. PIPE -CS SCHEDULE-80, 2 INCH OR AS PER
SITE
CONDITION. 5.#CUTTING THE EXISTING PIPELINE
AND INSTALL NEW PIPES ONE BY ONE WITH
EXISTING/NEW VALVE 6.#REMOVAL OF INSULATION
NECES
SARY FOR THE WORK AND PUT BACK WITH NEW
MATERIAL ( CLADDING MATERIAL AND INSULATION
WILL BE PROVIDED BY DEWA) 7.#ANTIRUST HIGH
2 G01 TEMPE
RATURE PAINTING (MATERIAL BY VENDOR)
8.#SPECIFICATION OF MATERIAL USED FOR THE
WORK SHALL BE SUBMITTED TO DEWA FOR PRIOR
APPROVAL. 9
.#CONTRACTOR SHOULD PROTECT THE PLANT
AND SURROUNDING AREA. 10.#COMPLETE SCRAP
GENERATED DURING THE WORK AND REMOVED
PIPES AND FITTI
NGS SHALL BE REMOVED AND DISPOSED TO
CONTRACTOR YARD (NOT IN DEWA PREMISES)
11.#SUPPORTS AND CLAMPS NEED TO
REFURBISH/REPLACE 1.#SUP
PORTS & CLAMPS BE CLEANED MECHANICALLY
(HYDRO JET/BLASTING/GRINDING) AND PAINTING
AS SITE CONDITION 2.#SUBMISSION OF COMPLETE
METHOD
STATEMENTS WITH THE OFFER. 3.#SUBMISSION
OF RISK ASSESSMENTS BEFORE STARTING THE
JOBS AT SITE; 4.#WORK WILL BE CARRIED OUT ON
SITE
AT JEBEL ALI POWER STATION G STATION
5.#WORK WILL BE CARRIED OUT AS PER DEWA SCHEDULE, TIME WILL/MAY BE DIFFERENT FOR
EACH UNIT OF W
ORK 6.#ONE UNIT OF MEASUREMENT WILL BE
CONSIDERED AS ONE BPST ALL LINES COMPLETE
IN ALL RESPECT VENDOR#S GENERAL
RESPONSIBILITY AND
LIABILITIES: 1.#CONTRACTOR SHALL PROVIDE
SUPERVISORY, SKILLED, SEMI-SKILLED,
UNSKILLED WORK FORCE, 2.#ONE SUPERVISOR
SHOULD BE AT S
ITE DURING THE WORK. 3.#ALL REQUIRED
WELDING MACHINE, ELECTRODES, TOOLS,
EQUIPMENT, CONSUMABLES ETC. REQUIRED TO
COMPLETE THE JOB 4.
#CONTRACTOR SHALL PROVIDE ALL PERSONAL
PROTECTIVE EQUIPMENT, FIRST AID KIT
AVAILABLE, COVID-19 PRECAUTIONARY KIT AT SITE
DURING THE
COURSE OF WORKS. 5.#CONTRACTOR HAS TO
COMPLETE THE WORK WITHIN THE SCHEDULE
PROVIDED BY DEWA EITHER BY INCREASING HIS
WORK FORCE OR
BY ROUND THE CLOCK WORK. 6.#IF ANY EXISTING PIPES, EQUIPMENT, INSTRUMENT OR ANY
ESTABLISHMENT DAMAGE DURING THE WORK AT
SITE WILL BE
REPAIRED/REPLACED BY THE VENDOR WITHOUT
ANY EXTRA COST. 7.#CONTRACTOR SHALL
FOLLOW THE DEWA SAFETY POLICY 8.#DAILY
PROGRESS/REVIEW
MEETING ALONG WITH DEWA 9.#CONTRACTOR
SHALL COMPLETE ALL ACTIVITIES WITHIN THE
MUTUALLY AGREED SCHEDULE 10.#UPON
COMPLETION OF ALL
WORKS, A FORMAL WORK COMPLETION REPORT
SHALL BE SUBMITTED. MANDATORY FOR BIDDING:
1.#VISIT SITE BEFORE SUBMITTING OFFER. SCOPE
OF
DEWA: 1.#FORKLIFT AND CRANE FOR ONSITE
LOADING AND UNLOADING 2.#ENTRY PERMIT FOR
THE WORK TEAM 3.#WORK PERMIT
4.#SCAFFOLDING WORK 5.
#INSULATION MATERIAL AND CLADDING
SHEET-NOT CONSUMABLE. 6.#WATER &
ELECTRICITY FROM ONE SOURCE AS PER SITE
AVAILABILITY LINE ITEM S: 1. CV-1 DRAIN LINE; L=20 M 2. CV-2 DRAIN LINE;
L=22 M 3. OVERLOAD LINE DRAIN LINE; L=20 M 4.
STRAINER -1 DRAIN LINE; L=22 M 5. S
TRAINER-2 DRAIN LINE; L=28 M 6. HP DEMISTER-1
DRAIN ALL; 30 M 7. HP DEMISTER-2 DRAIN LINE;
L=37 M CONTACT: FOR TECHNICAL CLARIFICAT
ION, PLEASE CONTACT
EZAZ-0503493353/0555090835,
[email protected];MR. A RAZZAK-0555567949,
MR. NAJEEB-0502838591
STANDARD TERMS & CONDITIONS
1) Prices should be `DDP` delivery duty paid at DEWA stores.
2) Quotation to be submitted only in local currency U.A.E Dirhams
3) DEWA Standard payment terms is `30 days credit` from the date of acceptance of material
4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest.