NEPAL ELECTRICITY AUTHORITY(A Government of NepalUndertaking)PROJECT DEVELOPMENT DEPARTMENT, ENGINEERING SERVICESUpper Arun Hydroelectric Project and IkhuwaKhola Hydropower ProjectREQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES? FIRMS SELECTION) First Publication Date : January 23, 2015
Country: NepalName of Project: Upper Arun Hydroelectric Project and Ikhuwa Khola HydropowerProjectAssignment
Title: Detail Engineering Design And Construction SupervisionReference No.:PSRSHD/NEA/S/QCBS-1 1. The Nepal Electricity Authority (NEA) has applied for financing from theWorld Bank toward the cost of the Upper Arun Hydroelectric Project (UAHEP) u0026 the Ikhuwa Khola Hydropower Project (IKHPP), andintends to apply part of the proceeds for consulting services. 2. UAHEP is located at Sankhuwasabha District in Eastern DevelopmentRegion (EDR) of Nepal about 700 km East of Kathmandu.
The projectis a peaking Run-of River type HEP with the installed capacity of 335 MW and gross annualoutput of 2, 050GWh. Its Feasibility Study was completed in the year 1991. NEA intendsto develop IKHPP with the installedcapacity of 30 MW, which is expected to produce about 191 GWh of energy annually, as anintegral component of theUAHEP. As per the feasibility study being conducted by Department of Energy Development (DOED), IKHPP is arun-of-river type (RoR) project located in vicinity of UAHEP area. 3. The consulting services ("theServices") forthe Detailed Engineering Design, Preparation of TenderDocumentsand Construction Supervision of the Projects include review of feasibility study, optimization of the installed capacity followed by the complete detailed engineering design and the preparation of tender documents in Phase I and construction supervision in Phase II of both projects (UAHEP and IKHPP)by the same Consulting Firm. In particular, the principal activities will include, but not limited tothe following: Phase I? Review of the feasibility study;? Preparation of detailed engineering design ofthe project;? Preparation of tender drawings anddocuments; InterfacePhaseA. To assist Nepal Electricity Authority (NEA) for the evaluation ofthe technical and financial proposals for the selection of the contractor, contract negotiation and agreement with the contractors.This includes Tender call, Detailed Tender evaluation, pre bid meetings, finalreport, agreement and commencement of worketc. Phase II? Construction supervision with quality assurance including defectliability period;? Contract administration;? Other works as defined byFIDICcontracts. It is expected thatthe consulting services for UAHEP will last about One hundred two (102) months in total: Phase I? Twenty four (24) months andPhase II- Sixty Six (66) months (this includes 12months defects liability period) with interface of Twelve (12) monthsin betweenthe two phases. Similarly consulting services for IKHPP will last about Seventy two (72) months in total: Phase I? Twelve (12)months and Phase II- Forty Eight (48) months (this includes 12 months defects liability period) with interface of Twelve (12)months in between the two phases. Entire Phase-I and Phase-II for both UAHEP and IKHPP projects will be dealt by single consultingfirm.
The contract for each phase will be made separately. It is expected that the contract for the Phase II of bothprojects (UAHEP and IKHPP) will be madeafter one year from completion of Phase I. 4. The NEA now invites eligible consulting firms ("Consultants") to indicatetheir interest in providing the Services. Interested Consultants should provide information demonstrating that they have therequired qualifications and relevant experience to perform the Services. All the Consulting firms including JV firms must have been legally registered for at least ten (10) years from the last date of submission of EOI. Following documents shall be submitted along with the EOI application by all the Consulting firms includingJV firms. A. Notarized orcertified copies of Certificates of incorporation or Registration of the consulting firm.A. Audited Financial Statements of the preceding fiveconsecutive fiscal years but not earlier than the year 2007. Minimum average annual turnoverof best three yearsover the last five years shall be US$ 5 Million.A. Company Profile. Theconsulting firms must provide information on jobs undertaken in the lastthirty (30) years giving a brief description of each job undertaken, the funding source(s), amount of contract and informationon the employer. Consulting firms'''' work experiences shall be evidenced bycertified copies of client''''s references withcontact and email addresses on the letterhead of the client''''s organization and shallbe written in English. If the references are in other languages, it shall be accompanied by an accurate translation into theEnglish languageduly authenticated by notary agencies or the nationally/ internationally recognized translating body/ agency. Any work experiences without client''''s/employer''''sreference shall not be considered.Evaluation will be based on the hydropower projects which are constructed andcommissioned. Planned and under construction projects will not be considered for evaluation. 5. Short listing of the Consultants will be carried out according to the World Bank''''s Guidelines: Selection and Employment ofConsultants under IBRD Loans and IDA Credits u0026 Grants by World Bank Borrowers - January 2011, Revised July 2014 ("ConsultantGuidelines").
The attention of interested Consultants is drawn to paragraph 1.9 of the Consultant Guidelines setting forth theWorld Bank''''s policy on conflict of interest. 6. Consultantsmay associate with other firmsin the form of a joint venture or a sub-consultancy to enhance their qualifications. Experience and Qualification of other firms, whether parent orsubsidiary firm, will not be considered for evaluation. Likewise, qualification and experience of the consulting firm associated asa sub-consultancy will not be considered for evaluation for shortlisting. 7. All submittals from the consulting firms shall be in Englishlanguage. 8. A Consultant will be selected in accordance with the QCBS method set outin the Consultant Guidelines. A brief description ofUAHEP and IKHPP and criteria for short-listing of consulting firmsincluding this request for EoI can be either downloaded from the NEA''''swebsite: www.nea.org.np or collected from the address mentionedbelow. 9. Further information can be obtained at the address below during office hours. 10. Expressions of Interest must be delivered in two printed copies to the addressmentioned below on or before 13:00 hrs local time on February 21, 2015. If the last date of submission happens to be a public holiday, thesubmission shall be made on the next working day.
The submission shall be made in closed envelope and the title shall be "Expression of Interest (EOI) for Consulting Services: Upper Arun Hydroelectric Project andIkhuwa Khola Hydropower Project". Electronic submission is not acceptable. 11. NEA reserves the right to accept or reject any or all applications, or to cancel the entireproceedings without givingany reasons whatsoever. Director Project Development Department Tel.: +977-1- 4153039Engineering Services
Fax: +977-1- 4153040Nepal ElectricityAuthority E - mail :
[email protected] Marg, Kathmandu, Nepal