Desulphurisation plant construction work Tender in Slovakia - 2181605
Tender notice from Slovakia, published on 16 Dec 2014.
Exeutive Summary
The Slovenske elektrarne, a.s., Bratislava has issued a Tender notice for the procurement of a Desulphurisation plant construction work in the Slovakia. This Tender notice was published on 16 Dec 2014 and is scheduled to close on 16 Dec 2015, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 2181605, while the tender notice number is 426934-2014 and Register on the platform.
Object of the contract Description of material skupiny.Sú?asná material group includes apparatus for removing sulfur dioxide from flue gas produced in thermal power plants using coal combustion and / or fuel oil, based on the process of wet limestone and gypsum in open absorber with shower tower with a capacity of one million Nm³ / h of in-situ oxidation of the sulfite / bisulfite to the calcium sulfate( gypsum ).Zariadenia desulfurization of flue gas to be supplied complete with all mechanical and electrical automation equipment, scope of work shall include engineering, manufacturing, testing and surveillance of workshops and on-site realizácie.?innosti related to the construction and commissioning may and may not be included in the scope of work; not included, the Contractor shall providere member all information and instructions necessary for the third party in order to carry out these activities and to monitor and supervise their own staff that these activities are carried out in compliance with defined predpismi.Hlavné technical charakteristiky.Každý of flue gas desulfurization systems must include the following : - absorber, the shower tower technology based on the process of wet limestone - gypsum, with in- situoxidation of sulfite to sulfate and absorbent recirculating liquid prepared from limestone- gypsum slurry ( requires the completion of oxidation of sulfite / bisulfite to sulfates also the absorption liquid ). The efficiency of removal of sulfur and maximum allowable concentrations of other impurities in the waste gas purification ( especially particulate ) Enel will be defined in the documentation for the biddingprocedure for each specific project. In general, the requirements will hold the line for best performance that can be achieved by the process - auxiliary equipment absorber : flue gas pipes and valves, piping and valves, blowers oxidizing air, mixers, pumps, nozzles, dehumidifiers, at?.Hlavné recirculation pumps absorber and gypsum dewatering systems ( cyclones and vacuum beltfilters) may or may not be included in the scope, depending on the requirements of a particular project; if not included, requires the supplier development related detailed engineering, which will be made ??available in the tender documentation ENEL ( Technical Specifications orders ) and provide comprehensive technical training assistance Enel during the stage of ordering, construction and commissioning prevádzky - retaining structures, - electrical and automation systémy.Vo are generally excluded from the scope of work supply fan / flue gas exhaust from / to the absorber system wet limestone crushers, waste water management, building ( but functional design has to be provided ) and.Funk?né manufacturing characteristics of the material : - flue gas must be designed with a lifetime of 25 years, for the operation of 8000 hours a year and a large number of cold starts in roku.Prevádzka flue gas desulphurisation equipment to be automated as far as possible from the power plant control room and require a minimum of interference operátorov.V event of failure of individual active components, the device must be capable of flue gas desulfurization correct operation in accordance with guaranteed performance. Therefore they must be all active components, balling in normal operation, represented záložne.V far as possible, be recognized failure of components and deploy automated system backup component to be automatizované.Vo generally must be achieved and guaranteed performance to one that closed recirculating pump absorber and without chemical additives, other than limestone. Depending on the projectit may be desired to add a basic organic acids, increase efficiency of SO2 removal and / or reduce power energie.Má be possible to change the operating number of main recirculation pumps and associated spray planes are capable of handling different concentrations entering the absorbent suspension SO2.pH be controlled by spraying lime to absorbera with a value of less than 5.6; namely limestone injection to be driven to the absorber, in addition to the mode based on feedback on the principle of the pH, the manner Napredni regulation, given the flow rate of gas and the concentration of SO2 and its changes during transient conditions in order to reduce the pH fluctuations in the absorber and thus the passage SO2 output from absorbéra.Koncentrácia chloride is to be controlled outletwater is directed into the economy wastewater at the maximum rate, which, depending on the particular project can be up to 50, 000 to 60, 000 ppm.Konštruk?né absorber materials and components in contact with the process fluid to be fully resistant to corrosion / erosion and shall be selected by the Contractor in accordance with the guidelines given in the technical specification Enel. The main materials used are : metal alloyscorrosion resistant high in Cr-Mo, polypropylene, rubber, lines of vinyl ester resin, GRP, carbide kremíka.Absorbér.Usmer?ovacie sheet and / or the bar code at the entry to the absorber and / or rings to the sides of the absorber must be installed as in order to ensure uniform distribution of the gas flow in the contact zone liquid / gas and prevented the phenomenon by- pass / slipping gaseous spamorpholine within absorbéra.Nádrž be designed to minimize deposition of solids within the absorber : The shape of the absorber, the location of the sticks, etc. must be designed to prevent the formation of dead oblastí.Z above two purposes shall be made optimization of the fluid dynamics of stage engineering models using a fluid dynamiky.V far as possible, be youBraná speed of a combustion gas within the absorber to minimize the amount of moisture passing through the downstream separator kvapiek.Absorbér be dimensioned with a outlet for removing a full flow of air blowers, when the shutters are closed in the combustion gas supply line. The outlet must be automatically opened whenever the flaps closed and the resulting high pressure. Air blowers himsia be discontinued at any time give high pressure. Moreover, the absorber must be protected against over pressurisation other appropriate zariadení.Núdzový Cold system.System to ensure injection of water into the end absorber, to ensure that sufficient reduction of the gas temperature, provided the temperature of gas inlet passage and the problems with the main circulation load. Water should be stored in an increase ofásobníku at atmospheric pressure or in a pressurized container under vzduchom.Množstvo water to be stored and the sprayed must be provided assuming conventional full nominal gas flow throughout the duration of the temperature priechodu.Oxidácia and dúchadlá.Hlava blower must be designed with an appropriate margin ( of about 2 m H20 ), taking into account the maximum level of the slurry and hustotu.MnoZSTV air required for the oxidation of sulphite must be determined assuming a maximum concentration of SO2 and minimum levels of O2 spalinách.?as hours elapsed without using the blower may not exceed 15 sekúnd.Systém distribution oxidizing air for the whole circulating suspension requires complete oxidation of sulfite to sulfáty.Pred distribution in the suspension should be cooled after the air oxidationpower saturation by spraying a good quality industrial water. Must be monitored effluent stream temperature of the shower vody.Vzduch be injected into the slurry through oxidation pipe or other system that ensures perfect distribution of air suspension ( eg. A broad open the oven before mixers), which creates a dispersion of air bubbles in suspenzii.Každá branch manifold mustbe equipped with continuous measurement of air flow and alarm in case of detection of low hodnôt.Nástrekové pipes shall be fitted with shut-off valves and connect to the compressed air / pressurized water in case of different rinsing pipe as there is a blockage ( is acceptable manual system ).Môže be proposed alternative oxidation system configuration, provided that such alternative solutionsare well verified with reference record long running time and the grid oxidizing air located in the liquid zone of the interface liquid / solid phase, which occurs as a result of settling solid látky.Miešadlá.Absorbéry, reservoirs and sinks that comprise suspension more than 1 % solids, will be equipped with a mechanical stirrer, driven motoricky.Pre absorbEr and slurry reservoir without reserve, the number and position of the stirrers defined such that if either mixers, others provide a minimum intensity of mixing which is essential for continued operation of the plant. Repair of worn -speed ( motor and seal ) must be possible during operation of the absorber / zásobníka.Miešadlá for pit latrines will be different without reserve and emergency mie, pulling will be provided by vzduchu.Lopatky stirrers to be stored in the liquid zone above the boundary liquid / solid phase, which occurs as a result of settling solids in the case of shutdown of the agitator. In any case, the proposal stirrer consider the maximum torque at start-up to established fixed blades covered látkou.Odlu?ova?e kvapiek.Každý absorber must have a moisture eliminatorthose composed of two or three degrees ( subject to a maximum balance of fluid required a specific project ).Profil dehumidifiers must ensure minimize settling solids and allow full penetration of water from the spray nozzles used for ?istenie.Musí be under security options uniform gas velocity throughout the section dehumidifiers for each stupni.Odlu?ova? kvapimpairment must be designed with an appropriate margin between the average " face velocity " at maximum load gas and " portable speed " (speed above which there is a transmission of particles separated moisture eliminator ).Roviny with shower nozzles and main circulation ?erpadlá.Sprchové nozzles must be arranged for planes, each at different heights. May be accepted alternativethe two planes of the same amount, provided that it can be achieved guaranteed performance at MCR with any pump and / or any bench outside prevádzky.Vzdialenos? between each level should allow access of maintenance personnel. The arrangement of spray nozzles at all levels must ensure the mutual overlap of spray nozzles and complete coverage of Section absorbéra.Systém spray -resfor recirculating pump system must be designed to provide a constant flow to the nozzles under all operating conditions ( ie, failure of any pump operating at part load with a reduced number of pumps, a lower concentration of SO2 in the feed than was projected value MPR all pumps in operation ) the viewpoint must be designed to ensure the correctfor operation under conditions where at least 3 % of spray nozzles at random layout on different planes, not working properly ( completely clogged nozzles or completely broken ).Dodávate? can optimize each pump head. In this case, all pumps must be of the same type and will vary only kolesom.Ve?kos? vane pumps must be defined by the Contractor in accordance with the maximum value inled ENEL tender dokumentoch.Na suction side of the main absorber recirculation pumps must be installed filtre.Dávkovací system limestone suspenzieMusia be given two back lines ( only one is in operation, shutdown circuit must be left empty ).For each absorber must be installed two backup dosing Systems limestone slurry, each connected to both thecircles. Each station shall consist of a control valve and shut-off valves. They must also be provided back- flow merania.Vápencová suspension should be dosed automatically, taking into account the density and the amount of calculation required under the gas flow inlet and outlet concentration of SO2. If the pH of the slurry within the absorber deviate from the fixed range, ovLadan addition of limestone slurry is appropriately korigované.Extrak?ný system suspenzie.Sadrová gypsum slurry must be extracted with dedicated pumps ( 1 operating + 1, for each absorber ) and supplied to the gypsum dewatering station piping loop circuit ( one for each absorber ), maintaining the extraction pumps constantly running and Deviating gypsum slurry to channelthe station or back to the absorber for recycling, to control the density of the suspension within the absorbéra.Prietokové value in a loop circuit and the diameters must be so selected that the ratio of the maximum / minimum speed at each point of suspension loop was not great than 2/1 in all operating conditions ( including full recirculation gypsum slurry into ABS ).In the case of off- extraction system must byl all tubing loop automatically rinsed vodou.Odvodnenie sadry.Systém be organized in a hydrocyclone system ( primary and secondary ) for increasing the concentration of the solid phase and separating the fine particles of the solid phase from the vacuum belt filter filtrov.Pre crawler shall be provided for the vacuum pump, accompanied by the necessary accessories. Vacuum pumps should be of the closed-circuitkvapaliny.Pásové filters have to work with variable speed to control the thickness of the filter cake at the waist measurement of the instrumentation. The belt must move the tensioning drum and drum propulsion, control electric motor controlled by an electronic frequency converter to achieve different speeds. Must be given a monitoring system for fully automatic controlbelt speed, as a function of concentration through plaster and running time of the filter cyklu.Vákuum must operate in the entire width of the belt through the drainage system made ??up of grooves and holes. Requires a system with an effective vacuum tightness and low trením.Na input filter must be installed hopper, which ensures a homogeneous distribution of gypsum slurry based system to track hydrocyclone filter.Sadrový Cake, which is formed on the filter belt, two steps must be scrubbed industrial water to reduce the maximum soluble impurities in sadre.Po unloading cake must be scrubbed industrial filter cloth with water on all sides by the spray of water washing of the upright type, slide the whole length of the rubber pásu.Kódy and štandardy.Referen?né codes and standards for zarANAGEMENT subject to the scope of work are listed as follows : - Materials : EN, UNI, A8ME - Pressure Equipment : I8PE8L PED - Electrical equipment : IEE EEI, NEMA, - inspection and testing : A8ME ( PTE 40) IEe - fire : UNI, NFPA. Description: Desulphurisation plant construction work Authority Type: Utilities Contact Nature: Works Procedure: Not applicable Document: Qualification system without call for competition Regulation: European Union, with participation by GPA countries Award criteria: Lowest price CPV code: 45253200 CPV Description: Desulphurisation plant construction work.   Internet address (URL): www.seas.sk Directive: Classical Directive (2004/17/EC)
The bid deadline for Desulphurisation plant construction work was 16 Dec 2015. Bidding is closed.
This tender has been issued by Slovenske elektrarne, a.s., Bratislava in Slovakia.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45253200 - Desulphurisation plant construction work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 2181605. The purchaser document reference is 426934-2014.
This tender falls under Construction and Real Estate in Slovakia. Suppliers in these sectors can track similar Slovakia tenders using CPV-based alerts.