Expired Tender Kyrgyzstan ICB TOT Ref. 89979186

Design of Monitoring; Reporting; and Verification Tender - 89979186

Tender notice from Kyrgyzstan, published on 05 Oct 2023.

Executive Summary

The INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT has issued a Tender notice for the procurement of a Design of Monitoring; Reporting; and Verification System for Land Use; Land Use Change and Forestry in the Kyrgyzstan. This Tender notice was published on 05 Oct 2023 and is scheduled to close on 30 Oct 2023, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 89979186, while the tender notice number is 0002003886 and Register on the platform.

Key facts

Summary
Design of Monitoring; Reporting; and Verification System for Land Use; Land Use Change and Forestry
TOT Ref. No.
89979186
Document Ref. No.
0002003886
Country
Kyrgyzstan
Notice type
Tender
Competition
ICB
Publication date
05 Oct 2023
Bid deadline
30 Oct 2023
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
Public
Financier
International Bank for Reconstruction and Development (IBRD)

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Expression of Interest are invited for Design of Monitoring; Reporting; and Verification System for Land Use; Land Use Change and Forestry.
Assist Central Asian countries in designing a Central Asian MRV system for tracking LULUCF and subsequent carbon emissions. The impact of mitigation and adaptation actions and international; regional; and domestic climate finance flows relating to LULUCF. The overall focus of the assignment will be to provide technical guidance on the design of the MRV System for LULUCF in Central Asia countries. For the objectives stated above; the following steps were expected: i. Review the [latest draft of the] national MRV roadmap developed as part of the national ambition to develop the national MRV system. ii. The consulting firm; the World Bank team; a region organization; and country focal points will elaborate on the workflow; methodological approach; and expected outputs of the MRV system; including the frequency outputs that need to be produced. iii. Based on the outcome of (ii) above; define the roles of the different entities involved in the MRV system and develop Standard Operating Procedures (SOPs) and other documentation for each entity to perform their role in the MRV (based on the methodological approach used for the MRV system and refined under (1) above) iv. Based on the steps above:* Data and Parameters to be Monitored;* Source of data or measurement methods and procedures to be applied. Where relevant; identify opportunities where the system can start with a simple and less sophisticated approach that could evolve as capacity is built within the Program's implementing institutions;* Frequency of monitoring/recording;* If calculations or estimations are required: calculation method;* Organizational structure; responsibilities; and competencies;* Methods for generating; recording; storing; aggregating; collating; and reporting data on monitored parameters.* Support the entities involved to document the process and create estimates of emissions; sequestrations; and any other intermediate products (such as maps) as expected under the MRV. Central Asian countries will then decide whether to use these outputs in the technical annexe to the BUR or other reporting. v. Based on discussions with relevant stakeholders; identify the entity(ies) best placed to implement the proposed monitoring system. Asses their capacity on the ground and identify capacity gaps. Propose an approach to address these gaps or; where necessary; alternative arrangements. vi. Prepare a thorough work plan for the implementation of the proposed monitoring and reporting system. The work plan should include:* Actions and activities: Identification of the steps and activities; including capacity building activities that need to be undertaken to implement the monitoring and reporting system* Implementation arrangements. The most adequate institutional arrangements for the implementation of the monitoring and reporting system; taking into account capacity on the ground; potential partners to the Program; activities to be implemented; etc.;* Timeline. A realistic timeline for the deployment of the monitoring and reporting system.* Costs. Identify the estimated costs for implementing the monitoring and reporting system.vii. Provide recommendations on the policy; legal; and institutional frameworks necessary for developing and implementing the MRV system for LULUCF in Central Asia countries.
Issue Date and Time: Oct 03, 2023 05:45

Closing Date and Time: Oct 30, 2023 23:59.

Documents

Tender Notice
Login to view

Kyrgyzstan Public Procurement Intelligence

Frequently asked questions

The bid deadline for Design of Monitoring; Reporting; and Verification System for Land Use; Land Use Change and Forestry was 30 Oct 2023. Bidding is closed.

This tender has been issued by INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT in Kyrgyzstan.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is financed by International Bank for Reconstruction and Development (IBRD).

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 89979186. The purchaser document reference is 0002003886.

Browse other tenders from Kyrgyzstan or search by relevant keywords and CPV classification.