Design & Construction of Virgin Coconut Oil Tender - 64752711

Tender notice from South Korea, published on 26 Mar 2022.

Executive Summary

The GLOBAL GREEN GROWTH INSTITUTE has issued a Tender notice for the procurement of a Design & Construction of Virgin Coconut Oil Processing Facility in the South Korea. This Tender notice was published on 26 Mar 2022 and is scheduled to close on 07 Apr 2022, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 64752711, while the tender notice number is and Register on the platform.

Key facts

Summary
Design & Construction of Virgin Coconut Oil Processing Facility
TOT Ref. No.
64752711
Document Ref. No.
Country
South Korea
Notice type
Tender
Competition
ICB
Publication date
26 Mar 2022
Bid deadline
07 Apr 2022
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
Public
Financier
Other Funding Agencies

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Request for proposals are invited for Design & Construction of Virgin Coconut Oil Processing Facility (San Teodoro) And Calamansi Processing Facility (Oriental Mindoro) PHILIPPINES
The Scope of Work and Activities Include;
Design Stage - Activities & Outputs;

1. Site Inspection; Topographic Survey; Geotechnical/Geological Investigation; Foundation Analysis and Environment Impact Assessment Studies

2. Conception and Preparation of Preliminary Architectural and Engineering Plan Based on the Msmes Reference Drawings (Refer to Annex 1); Fda Guidelines on Premises (Refer to Annex 2); Fda Guidelines on Machinery (Refer to Annex 3); Doh Good Manufacturing Practices (Refer to Annex and Additional Information on Machines (Refer to Annex 6)

3. Presentation of Draft Design to the Pbsp Technical Team/Gggi within 30 Working Days after Contract Signing. The Detailed Design should have the following Components; (Architectural Drawings; Structural Drawings; Plumbing Drawings; Electrical Drawings; Mechanical Drawings and Design Drawings) at the Bare Minimum.

4. Revision of Initial Draft Incorporating Comments from the Pbsp Technical Team/Gggi

5. Preparation of Detailed Unit Price Analysis and Bills of Quantities

6. Preparation of S-Curve/Construction Schedule/Proposed Gannt Chart

7. Presentation of the Final Design to Pbsp Technical Team/Gggi. Final Output of the Plans shall be Signed and Sealed by Licensed Engineers for each Particular Component. Reproduction of Plans Other than for Permits and Licensing Purposes.

8. Submission of the Final Design to Obo for Review and Approval.

9. Securing the Building Permit from Obo

10. Assist Gggi/Beneficiary to Secure the Occupancy Permit from Obo

Adherence to Design Codes and Standards;

The Contractor shall Coordinate and Report to the Office of the Building Official (Obo) for Uniformity and Cohesiveness in the Preparation of Related Documents, Consistent with the Latest Edition of National Building Code of the Philippines and its Implementing Rules and Regulations

All Reports and Other Related Documents Prepared by the Contractor shall be in a Format Agreed and Accepted by the Obo.
Required Outputs from Design Stage;

The Expected Deliverables from the Contractor Include;

A) Site Inspection Report

B) Geo-Technical Investigation Report

C) Topographic Survey Report

D) Environment and Social Impact Assessment Report

E) Approved “for Construction” Drawings

F) Approved Technical Specifications

G) Detailed Engineering Plans

H) Design Report

I) “as Built” Plans

J) Building Permit

K) Occupancy Permit
Construction Stage - Activities & Outputs

Construction Activities;

The Contractor is Expected to Undertake the following Activities/Works, (Refer to Annex 5 for Details);

1. Site Development

2. Concrete Framing

3. Floor Slab/Masonry and Roofing

4. Plastering, Carpentry and Fabrication Works

5. Painting Works, Installation of Windows, Doors and All Fixtures

6. Commissioning, Closure and Handing Over

Documents

Tender Notice
Login to view

South Korea Public Procurement Intelligence

Frequently asked questions

The bid deadline for Design & Construction of Virgin Coconut Oil Processing Facility was 07 Apr 2022. Bidding is closed.

This tender has been issued by GLOBAL GREEN GROWTH INSTITUTE in South Korea.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is financed by Other Funding Agencies.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 64752711. The purchaser document reference is not provided in the notice.

Browse other tenders from South Korea or search by relevant keywords and CPV classification.