Design and Construction of Provincial Agricultural Tender - 60821461

Tender notice from South Korea, published on 07 Dec 2021.

Executive Summary

The GLOBAL GREEN GROWTH INSTITUTE has issued a Tender notice for the procurement of a Design and Construction of Provincial Agricultural Center in the South Korea. This Tender notice was published on 07 Dec 2021 and is scheduled to close on 27 Dec 2021, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 60821461, while the tender notice number is 100005709 and Register on the platform.

Key facts

Summary
Design and Construction of Provincial Agricultural Center
TOT Ref. No.
60821461
Document Ref. No.
100005709
Country
South Korea
Notice type
Tender
Competition
ICB
Publication date
07 Dec 2021
Bid deadline
27 Dec 2021
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Arab Bank for Economic Development in Africa (BADEA)

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Request for proposals are invited for Design and Construction of Provincial Agricultural Center in Brgy. Merit, Victoria, Oriental Mindoro, Philippines.
GGGI for its project in Philippines is requesting for proposals from eligible firms/entities for following scope of work :

Introduction

The Provincial Agricultural Center (PAC), to be built in Brgy. Merit, Victoria, Oriental Mindoro (with funding provided by the Korea International Cooperation Agency), aims to improve the competitiveness and foster the development of agri-MSMEs in the province by providing: (i) incubation services, (ii) tolling services and facility rentals, and (iii) aggregation services, among others.

A defining feature of the PAC - other than supporting the agricultural sector - are its green components, which include:

1. Installation of a solar power system as a source of renewable energy

2. Designation of a Materials Recovery Facility (MRF) for proper solid waste management

3. Installation of a wastewater treatment system

4. Typhoon-resilient and earthquake-proof building design.
Design Activities

The detailed engineering study and design shall include but will not be limited to the following activities/works;

1. Site inspection; topographic survey; geotechnical/geological investigation; foundation analysis and Environment Impact Assessment Studies

2. Conception and preparation of preliminary architectural and engineering plan based on PAC Reference Drawings (Refer to Annex 1); FDA Guidelines on Premises (Refer to Annex 2); FDA Guidelines on Machinery (Refer to Annex 3); DOH Good Manufacturing Practices (Refer to Annex and Additional information on machines (Refer to Annex 6)

3. Presentation of draft design to the PBSP Technical team/GGGI within 45 working days after contract signing. The detailed design should have the following components; (Architectural Drawings; Structural Drawings; Plumbing Drawings; Electrical Drawings; Mechanical Drawings and Design Drawings) at the bare minimum.

4. Revision of initial draft incorporating comments from the PBSP Technical team/GGGI

5. Preparation of detailed unit price analysis and Bills of Quantities

6. Preparation of S-curve/construction schedule/proposed Gannt chart

7. Presentation of the final design to PBSP Technical team/GGGI. Final output of the Plans shall be Signed and Sealed by licensed engineers for each particular component. Reproduction of plans other than for permits and licensing purposes, the Contractor shall submit the following to GGGI:

- Master Copy Reproducible drawings in pdf format (A1 size or 59.4cm x 84.1cm) saved in USB/Electronic format.

- 5-set Blueprints in A1 size hardcopy documents

- Bar Chart

- Manpower & Equipment Schedule

- PERT/CPM

- S-Curve

- Construction Methodology

- Health & Safety Program

8. Submission of the final design to OBO for review and approval.

9. Securing the building permit from OBO

10. Assist GGGI to secure the occupancy permit from OBO.
Required Outputs from Design Stage
The expected deliverables from the contractor include;

1. Site inspection report

2. Geo-technical investigation report

3. Topographic survey report

4. Environment and Social Impact Assessment Report

5. Approved “For Construction” Drawings

6. Approved Technical Specifications

7. Detailed Engineering Plans

8. Design Report

9. “As Built” Plans

10. Building permit

11. Occupancy permit.

Documents

Tender Notice
Login to view

South Korea Public Procurement Intelligence

Frequently asked questions

The bid deadline for Design and Construction of Provincial Agricultural Center was 27 Dec 2021. Bidding is closed.

This tender has been issued by GLOBAL GREEN GROWTH INSTITUTE in South Korea.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is financed by Arab Bank for Economic Development in Africa (BADEA).

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 60821461. The purchaser document reference is 100005709.