Executive Summary
The PUBLIC COMPANY “AUTOPUTEVI REPUBLIKE SRPSKE” LIMITED has issued a Tender notice for the procurement of a Design and Construction of Doboj Bypass: Section Bridge Rudanka (including the Bridge)-Tunnel in the Bosnia and Herzegovina. This Tender notice was published on 18 Feb 2020 and is scheduled to close on 04 May 2020, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 40683042, while the tender notice number is 9579-IFT-50603 and Register on the platform.
Key facts
Summary
Design and Construction of Doboj Bypass: Section Bridge Rudanka (including the Bridge)-Tunnel
Tenders are invited for Design and Construction of Doboj Bypass: Section Bridge Rudanka (including the Bridge)-Tunnel Putnikovo Brdo 2. INVITATION FOR TENDERS Bosnia and Herzegovina / Republic of Srpska Corridor Vc through Republic of Srpska: Doboj Bypass INVITATION FOR FIRST STAGE PROPOSALS Design and Construction of Doboj Bypass: section Bridge Rudanka (including the Bridge)-tunnel Putnikovo Brdo 2 This Invitation for Tenders follows the General Procurement Notice for this project which was published on the EBRD website, Procurement Notices (http://www.ebrd.com/pages/workingwithus/procurement/project.shtm ) on July 30th, 2019. Procurement will be carried out in accordance with the EBRD “Procurement Policies and Rules” (PPR), which are published on the Bank-s website. Public Company “Republic of Srpska Motorways” ltd, hereinafter referred to as “the Employer”, intends using part of the proceeds of a loan from the European Bank for Reconstruction and Development (the Bank) towards the cost of preparation of Detailed Design (based on the existing Main Design) and Construction of motorway on Corridor Vc through Republic of Srpska - Doboj Bypass, section Bridge Rudanka (including the Bridge) - tunnel Putnikovo Brdo 2. The Employer now invites sealed tenders from Contractors for the Design and Construction of the following Works to be funded from part of the proceeds of the loan: Main Works: Construction of 5, 6 km of new Motorway including all related local roads and following major structures: Dual tube tunnel “Putnikovo Brdo 1” in total length of 1, 6 km
Dual tube tunnel “Putnikovo Brdo 2” in total length of 700m (This section includes the last 150 metres of the tunnel that are located within the FBH)
Bridge “Rudanka” over river Bosna
Viaduct “Putnikovo Brdo” General description Design and Construction of 2+2 lane motorway (with central median and emergency lanes) which may include some or all of the following: Earthworks / Embankments
Road Pavements
Bridgeworks
Piling works
Tunnelling works
Interchanges and link roads
Steel / Concrete vehicle Safety Barriers
Local Road works : under/overpasses
Local road re-alignments, diversions, closures
Drainage, culverts and river protection Works
Provision of Motorway communications, emergency telephones
Lighting
Fencing
Lining, signing, variable message signs
Electrical Works
Environmental Works
Meteorological stations
Toll Stations and associated pavements, buildings, highway links
Motorway Compounds and associated pavements, buildings, highway links
Weigh-in-motion sites Expected duration of the Contract is 1095 days (three years) plus Defect Notification Period of 730 days (two years) Tender Documents Tender documents may be obtained from the office at the address below upon payment of a non-refundable fee of Euro 750 or equivalent in a convertible currency. The potential Tenderers shall bear the cost of additional commissions, taxes or any other expenses created by the Banks as a result of payment of non-refundable fee. Non refundable fee should be paid with reference to the Invitation to Tenders No. RS/EBRD-2019/W. Instruction for payment in local currency [KM]: Account Nr. 5620998073966893 with NLB Razvojna banka AD Banja Luka, or Instruction for payment in foreign currency [Euro]: Bank: NLB Razvojna banka AD Banja Luka Adress: 4 Milan Tepića St, 78 000 Banja Luka BIC RAZBBA22X IBAN: BA39 5620 9980 8433 4641 Korisnik: JP “Autoputevi RS“ d.o.o. Banja Luka Adresa: Vase Pelagića 10, 78 000 Banja Luka Upon receipt of appropriate evidence of payment of the non-refundable fee in the amount of EUR 750, the documents will promptly be dispatched by courier; however, no liability can be accepted for their loss or late delivery. If requested, the documents can be dispatched electronically after presentation by the prospective Tenderer of an appropriate evidence of payment of the non-refundable fee. In the event of discrepancy between electronic and hard copies of the documents, the hard copy shall prevail. Tender A two stage Tendering Procedure will be adopted for the procurement of the above-named Contract and will proceed as follows: the First Stage tender will consist of a technical proposal only, without any reference to prices, and a list of any deviations to the technical and commercial conditions set forth in the tender documents or any alternative technical solutions a tenderer wishes to offer, and a justification therefor, provided always that such deviations or alternative solutions do not change the basic objectives of the project. Following evaluation by the Employer of the First Stage tenders, the Employer will invite each tenderer who meets the qualification criteria and who has submitted a technically responsive tender to a clarification meeting. The proposals of all such tenderers will be reviewed at the meeting and all required amendments, additions, deletions and other adjustments will be noted and recorded in a Memorandum. Only qualified tenderers submitting a technically responsive and acceptable First Stage tender will be invited to submit a Second Stage tender.
The Second Stage Tender will consist of an updated Proposal incorporating all additions and modifications as may be agreed between the Employer and Tenderer and recorded in the Memorandum to the clarification meeting; and the commercial Tender as well as the Tender Security. Qualification To qualified for the award of the Contract, the applicant must demonstrate to the Client that it substantially satisfies the requirements regarding experience, personnel, equipment, financial position and litigation history, specified below: General Experience: The Tenderer shall have an average annual turnover as prime contractor over the last 5 (five) years (2014, 2015, 2016, 2017, 2018) of not less than EURO 80 million equivalent. The turnover value in other currencies than the defined currency should be recalculated into that currency based on the exchange rate as of the 1st of July of each year reported, as set by Central Bank of Bosnia and Herzegovina.
However, as a part of the required average annual turnover, the applicant shall have an average annual turnover in road construction works of at least Euro 50 million. To demonstrate the revenue in the road construction, the applicant has to submit the list of referenced projects containing the description of works, value and implementation period. This list, where available, should be accompanied by completion certificates/reference letters issued and signed by the contracting authorities and mentioning the above data. If a completion certificate or reference letter is not obtained from the contracting authority, the applicant shall submit a sworn statement that the certificate or letter was properly requested. Specific Experience: The Tenderer shall demonstrate that it has successful experience as prime contractor, lead partner, partner in JVCA or subcontractor in the execution of at least 2 (two) Design and Construction projects with a minimum value of EUR 90 million of a nature and complexity comparable to the proposed contract within the last 5 (five) years. For assessment purposes the referred projects shall include following:
a. Construction of at least one full motorway bridge, preferably constructed by incremental launching method, min 400 m length, within the last 5 (five) years; b. Construction of at least one full motorway viaduct, min 300 m length, within the last 5 (five) years; and, c. Construction of at least one tunnel, min 1500 m length within the last 10 (ten) years, d. Construction of retaining wall in total length of 1000 m and average height of 5, 0 m e. 400.000 m3 of earthworks executed in one calendar year within the last 5 (five) years; f. 50.000 tons of asphalt placed in one calendar year within the last 5 (five) years; g. 80.000 m3 of structural concrete produced and placed in one calendar year within the last 5 (five) years; h. 600 m of Tunnel excavation works in one calendar year within last 5 (five) years Personnel Capabilities: The Tenderer shall provide suitably qualified personnel to fill the following positions. For each position the Tenderer will supply information on a first choice candidate and an alternate, each of whom should meet the experience requirements specified below: PERSONNEL FOR WORKS Position Total work experience (years) In similar works (years) Project Manager 20 10 Site Manager 20 10 Tunnel Construction Manager 15 10 Tunnel Equipment Manager 15 10 Quality Assurance manager 15 8 Bridges Manager 15 10 Earthworks Manager 15 8 Pavement Works Manager 15 10 Occupational Health and Safety Manager 10 8 Electrical Manager (Light current) 10 8 Electrical Manager (Heavy current) 10 8 PERSONNEL FOR DESIGN Highway Design Engineer 15 10 Bridge/Viaduct Design Engineer 15 10 Tunnel Design Engineer 15 10 Geotechnical/Geomechanical Design Engineer 15 10 Environmental Design Engineer 10 5 Equipment Availability: The tenderer shall own, or have assured access to (through hire, lease, purchase agreement, availability of manufacturing equipment, or other means), the following key items of equipment in full working order, and must demonstrate that, based on known commitments, they will be available for use in the proposed contract. The Tenderer may also list alternative equipment which he would propose to use for the contract, together with an explanation of the proposal. No. Equipment Type and Characteristics Minimum Number required 1. Hot asphalt mixing plant
The bid deadline for Design and Construction of Doboj Bypass: Section Bridge Rudanka (including the Bridge)-Tunnel was 04 May 2020. Bidding is closed.
This tender has been issued by PUBLIC COMPANY “AUTOPUTEVI REPUBLIKE SRPSKE” LIMITED in Bosnia and Herzegovina.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is financed by European Bank for Reconstruction and Development (EBRD).
The tender is classified under the following CPV code(s): 45221110 - Bridge construction work, 71322300 - Bridge-design services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 40683042. The purchaser document reference is 9579-IFT-50603.
See the Similar Tenders section on this page or browse other tenders from Bosnia and Herzegovina.
This tender falls under Construction and Real Estate in Bosnia and Herzegovina. Suppliers in these sectors can track similar Bosnia and Herzegovina tenders using CPV-based alerts.