Procurement Summary
Country: Hungary
Summary: Debr.-Ny.Eghyáza Railway Board, Telecommunications, Etcs
Deadline: 21 Jul 2026
Posting Date: 06 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 144633597
Document Ref. No.: 461356-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: HUF 60552850253.00
CPV Classification
45234100 - Railway construction works
45232200 - Ancillary works for electricity power lines
45231600 - Construction work for communication lines
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Debr.-Ny.eghyáza railway board, telecommunications, ETCS Construction of insurance equipment, telecommunications and ETCS2 (Unified European Train Control System) of the Debrecen (kiz) - Nyíregyháza (kiz) railway line section within the framework of an enterprise contract. Debrecen (ex) - Design and construction of safety equipment, telecommunications and ETCS2 (Unified European Train Control System) of the Nyíregyháza (kiz) railway line section within the framework of a business contract, according to the main quantitative characteristics below. 100 no. railway line approx. 47 km long, continuous Debrecen (ext.) - Nyíregyháza (ext.) double-track (94 vkm), electrified line section. The task of the Winning Bidder is to design and build the insurance equipment, telecommunications and ETCS2. The line section has new reversing tracks, a total of 65 switches control, electronic station safety devices controlling 75 Hz scheduled station and line signal transmission must be designed and implemented (constructed) by the winning Bidder at 5 stations. The reversing track passenger at the Császárszállás roundabout functions do not need to be implemented. On the line section approx. A continuous ETCS2 train control must be built in a length of 47 line kilometers in accordance with the application manual for the ETCS2 trackside system and the current specifications, the ETCS together with the RBC equipment required for a train control system. ETCS2 train control and in addition approx. On a 94 km track length, a scheduled 75Hz signal must be installed and connected to the safety equipment. The ETC...
Document Type: Contract Notice Reference Number: EKR000771582025 Contract Type: works Estimated Value: 60552850253.00 - HUF Authority Type: cga Doc Title: Debr.-Ny.egyháza railway board, telecommunications, ETCS Dispatch Date: 2026-07-03 Publish Date: 2026-07-06 Submission Date: 2026-07-21
Documents
Tender Notice