Procurement Summary
Country : USA
Summary : Coordination, Management and Supervision Services for Construction of Infrastructure Works under the Water Distribution Project
Deadline : 26 Feb 2019
Other Information
Notice Type : Tender
TOT Ref.No.: 30317613
Document Ref. No. : SOLTA-C-19-002
Competition : ICB
Financier : North American Development Bank (NADB)
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Purchaser : NORTH AMERICAN DEVELOPMENT BANK
203 South St. Mary's, Suite 300
San Antonio, Texas 78205
Tel: (210) 231-8000.
USA
Email :mconstandse@nadb.org / infor@nadb.org
URL :http://www.nadb.org/
Tender Details
Tenders are invited for Coordination, Management and Supervision Services for Construction of Infrastructure Works under the Water Distribution Project in Jose Silva Sanchez, Municipality of Soto la Marina, Tamaulipas.
The water utility, Comisión Municipal de Agua Potable y Alcantarillado del Municipio de Soto la Marina, (COMAPA) in Soto la Marina, Tamaulipas, is planning to carry out construction work related to a Drinking Water Project for Jose Silva Sanchez in the Municipality of Soto la Marina, which will be partially financed by a grant from the North American Development Bank (NADB).
COMAPA intends to execute the following infrastructure works:
1. Equipment for the well, with a volumetric flow rate of 1.6 lps or 25.4 gpm, consisting of:
a. Power line and transformer to supply energy to well;
b. Electromechanical equipment;
c. Chlorination unit;
d. Perimeter fence; and
e. Rehabilitation of control room;
2. Construction of an elevated water storage tank, 10 meters above ground, with the capacity to hold 25 cubic meters of water;
3. Installation of 3, 052 meters of water transmission line from the well to the elevated tank using 2-inch PVC pipe; and
4. Installation of 1, 651 meters of water distribution lines using 2-inch PVC pipes.
NADB intends to contract a qualified consulting firm to provide Coordination, Management and Supervision Services for Construction of Infrastructure Works under the Water Distribution Project in Jose Silva Sanchez, Municipality of Soto la Marina, Tamaulipas. The services will consist of verifying that construction work is carried out in accordance with the designs, specifications and established standards, as well as monitoring project performance and the proper use of funds provided by NADB. These services are expected to begin in first quarter of 2019 and take approximately 7 months to complete.
The consultant will be selected and contracted in accordance with NADB Procurement Policies and Procedures, as NADB will be the Executing Agency.
Consulting firms that have experience in similar works and are interested in participating in the selection process should send an expression of interest by e-mail to Marielena Constandse at mconstandse@nadb.org no later than February 7, 2019.
The requirements and general bid information are indicated below:
Bid No.: SOLTA-C-19-002
Job Description: Coordination, Management and Supervision Services for Construction of Infrastructure Works under the Water Distribution Project in Jose Silva Sanchez, Municipality of Soto la Marina, Tamaulipas.
Questions of a technical or contractual nature must be submitted by e-mail to mconstandse@nadb.org no later than February 7, 2019. Telephone inquiries will not be accepted. NADB will respond to all questions on February 12, 2019.
The bid documents will be published only in Spanish and can be found at the following link: https://cocef.box.com/s/9abduama9u3lbvnxr253eg18zbmd2f7n.
Proposals must be delivered to an electronic repository no later than 5:00 PM (Ciudad Juárez, Chihuahua, Mexico/El Paso, Texas US time) on February 26, 2019. NADB will provide instructions for submitting proposals only to firms that confirm their participation by e-mail to the Contract Officer at mconstandse@nadb.org on or before February 7, 2019. Proposals sent via e-mail will not be accepted.
Documents
Tender Notice