Contract notice: Works for complete or part Tender - 15700897
Tender notice from Bulgaria, published on 16 Aug 2017.
Executive Summary
The ОБЩИНА САМОКОВ has issued a Tender notice for the procurement of a Contract notice: Works for complete or part construction and civil engineering work in the Bulgaria. This Tender notice was published on 16 Aug 2017 and is scheduled to close on 18 Sep 2017, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 15700897, while the tender notice number is 321308-2017 and Register on the platform.
Key facts
Summary
Contract notice: Works for complete or part construction and civil engineering work
Object of the contract Works for complete or part construction and civil engineering work Description: Contract notice: Works for complete or part construction and civil engineering work Authority Type: Regional or local authority Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45200000, 45200000, 71000000, 45200000, 71000000 CPV Description: Works for complete or part construction and civil engineering work. Architectural, construction, engineering and inspection services. Избор на изпълнител на инженеринг във връзка с изпълнението на проект „Подобряване на енергийната ефективност на адм. сгради на Общинска администрация, РПУ и ОУ „Авксентий Велешки", гр. Самоков". „Избор на изпълнител на инженеринг във връзка с изпълнението на проект-"Improving the Energy Efficiency of the Administrative Buildings of the Municipal Administration of Samokov, the Samokov Regional Police Station and the building of the" Avksentiy Veleshki "Primary School, Samokov, in connection with the implementation of Project BG16RFOP001-2.001-0099-С01 for Grant Under the Operational Program "Regions for Growth" 2014-2020, Priority Axis 2 "Support for Energy Efficiency in Support Centers"Some of the activities may be carried out in the office and / or other place of the Contractor and / or third parties, if this is appropriate or required by the specifics Of the type of activity in question. The sites in which the activities will be carried out and the envisaged basic package of measures to improve energy efficiency areAs follows: 1. Administrative building Samokov Municipality - consisting of (1) Building of the municipal administration, (2) Ritual hall and (3) Hot connection with a built-up area of 6 164.30 m and an underground garage with an area of 2 151.40 m / по Технически паспорт. Of the outer walls, - thermal insulation of the above-ground walls of the basement and the floor of a heated space bordering on outside air, - thermal insulation ofCurve - replacement of window frames and reduction of infiltration - increase in efficiency of the lighting installation - increase of the efficiency of the building heating system 2. (1) Building of the Metropolitan University "Avtogenti Veleshki" with a total built-up area of 3 139 m and (2) A gymnasium with a total built-up area of 454 m / under the Technical passport. - thermal insulation- thermal insulation of the basement walls of the basement and the floor of a heated space adjacent to the outside air - thermo-insulation of the roof - reduction of infiltration of the joinery by replacement of external window sills adjustment of automation Heating systems, thermal recovery and heat circulation systems, etc .; Increasing CPC efficiency• Increasing the efficiency of the lighting installation • Increasing the efficiency of the building heating system • The gym: • Thermal isolation of the external walls • Roof thermal insulation • Increasing the efficiency of the lighting installation • Enhancing the efficiency of the lighting installation Building heating system. Regional Police Station, Samokov - with total built-up area 2 919 m / Technique- thermal insulation of the external walls - thermal insulation of the basement walls of the basement and the floor of a heated space adjacent to the outside air - thermal insulation of the roof - partial replacement of the old joinery of the building including Entrance doors - increasing the efficiency of the lighting installation - increasing the efficiency of the building heating system ParticipantMust be registered in the Central Professional Register of the builder for the execution of first group constructions, III (third) category according to the Regulations for the procedure for entry and maintenance of the Central Professional Register of the builder and if he is a foreign natural or legal person, the same Be entitled (under its national law and under the conditions of mutual recognition) to execute preProof: When submitting the tender, the participant declares compliance with the requirement, stating in Part IV, Section A, paragraph 1) of the EEDOP group and the category of construction sites for which it is registered in the Central Professional Register of Constructors, As well as the number of the Certificate of Incorporation and the date of validity Under the terms of Art. 67, para. 5 of the PPA, the contracting authority may require-Documents proving the information declared in EEDOP - a copy of a valid entry certificate in the Central Professional Register of the builder or an equivalent document for foreign participants certifying the right of the person concerned (according to its national legislation) to fulfill the subject of the order. Pursuant to Art. 67, para. 6 of the PPA before the conclusion of the contractAnd a public procurement contract, the contracting authority requires the contractor to provide up-to-date documents proving the information declared in EEDOP regarding compliance with the selection criteria set for the exercise of the professional activity referred to above (if they were not Submitted under the terms of Article 67 (5) of the Public Procurement Act). Documents are presentedAnd subcontractors and third parties, if any. Upon submission of the tender, the participant declares compliance with the required requirement under item 1, by filling part IV, section B, item 2a) of the EEDOP. Under the terms of Art. 67, para. 5 of the PPA the contracting authority may require documents proving the information declared in EEDOP: Report on the turnover of construction and assembly works related to the introductionImplementation / implementation of energy efficiency measures in existing buildings for the last 3 (three) completed financial years, depending on the date when the participant is established or started its activity. When submitting the tender, the participant declares compliance with the requirement under item 2, by filling in Part IV, Section B, item 5) of EEDOP, indicating the insurance sum of the concludedIn accordance with Article 67, paragraph 5 of the PPA, the contracting authority may require documents proving the information declared in EEDOP - a copy of documents evidencing the existence of a professional "Insurance" insurance, as well as number and validity of the same. Responsibility. "Note: If, for a valid reason, a participant is unable to provide the requestedIt may prove its economic and financial standing by any other document that the Assignor deems appropriate. Note: On the grounds of Art. 67, para. 6 of the Public Procurement Act, prior to the award of a public procurement contract, the contracting authority requires the contractor to provide up-to-date documents proving the information declared in EEDOP regarding compliance with-The selection criteria set for the financial and economic status quoted above (if they have not been submitted under the terms of Article 67 (5) of the Public Procurement Act). Documents are also submitted to subcontractors and third parties, if any. Requirements for participants: 1. The assignor removes from participation in the procedure for which a participant is present or has arisen before or during the procedureArticle 21. 54, para. 1, items 1-7 and Art. 55, para. 1, item 1 and item 5 of the Public Procurement Act. The conditions under Art. 107 of the Public Procurement Act, as well as the circumstances under Art. 3, item 8 of ZIFODRUPPDPS 2. The grounds under Art. 54, para. 1, items 1, 2 and 7 refer to the persons representing the participant, the members of the management and supervisory bodies and others. Persons who have the power to exercise control over the decision-making by these bodies. IN-If the participant is a grouping of natural and / or legal persons the grounds for removal under Art. 54, para. 1, items 1-7 and Art. 55, para. 1, item 1 and item 5 of the Public Procurement Act shall apply to each member of the grouping. Where the participant provides for the participation of subcontractors or will use the resources of third parties, the grounds shall also apply to them. When submitting a bid, the participant declares the absence of an ax. For oAnd the like. Is with the selection criteria, by presenting the EEDOP. The relevant information requested by the Contracting Authority shall be provided in EEDOP and the national databases containing the declared circumstances or the competent authorities which, under the legislation of the State in which the participant is established, shall be required to provide information. . When the participant has indicated thatWill use subcontractors or the capacity of third parties to demonstrate compliance with the selection criteria, a separate EEDOP will be presented for each of these persons. In the event that the participant is a non-legal entity, EEDOP shall be submitted for each natural person and / or legal entity included in the consortium. Proceeds from section III.1.3) List and short description of the criteriaOdbor: Note: On the grounds of Art. 67, para. 6 of the Public Procurement Act, prior to the award of a public procurement contract, the contracting authority requires the contractor to provide up-to-date documents proving the information stated in EEDOP regarding the compliance with the selection criteria set out in the technical and professional capacity quoted above Were presented in accordance with Art. 67, para. 5 of the Public Procurement Act). The documents are also presented to subcontractors and third parties, if any. Proceeds from section III.1.3) Technical and professional capacity, Minimum level (s) of standards required: 4. The participant has to prove that he has the following technical equipment for implementation of the following: - Vehicle (minimum 1 pc) - Welding apparatus (minimum 2 pcs.) - Facade tubular scaffold (minimum-2 000 m) - Drilling technique (minimum 5 pieces) - Trucks (minimum 4 pieces) 5. The participant shall have the following systems in place: - a quality management system according to the standard BDS EN ISO 9001: 2015 or equivalent to a scope including construction works - an environmental management system according to the standard BDS EN ISO 14001: 2015 or equivalent with A scope including a builderBut installation work Internet address (URL): http://samokov.bg/ Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Works for complete or part construction and civil engineering work was 18 Sep 2017. Bidding is closed.
This tender has been issued by ОБЩИНА САМОКОВ in Bulgaria.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45200000 - Works for complete or part construction and civil engineering work, 71000000 - Architectural, construction, engineering and inspection services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 15700897. The purchaser document reference is 321308-2017.
This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.