Contract notice: Works for complete or part Tender - 41683895
Tender notice from Hungary, published on 19 Mar 2020.
Executive Summary
The NFP NEMZETI FEJLESZTÉSI PROGRAMIRODA NONPROFIT KORLÁTOLT FELELŐSSÉGŰ TÁRSASÁG has issued a Tender notice for the procurement of a Contract notice: Works for complete or part construction and civil engineering work in the Hungary. This Tender notice was published on 19 Mar 2020 and is scheduled to close on 04 May 2020, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 41683895, while the tender notice number is 131481-2020 and Register on the platform.
Key facts
Summary
Contract notice: Works for complete or part construction and civil engineering work
Object of the contract Works for complete or part construction and civil engineering work Description: Contract notice: Works for complete or part construction and civil engineering work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45200000, 45200000, 45232100, 45232150, 45232151, 45232430, 45233223, 45233228, 45262220, 71320000, 71322000, 45200000, 45232100, 45232150, 45232151, 45232430, 45233223, 45233228, 45262220, 71320000, 71322000 CPV Description: Works for complete or part construction and civil engineering work. Ancillary works for water pipelines. Works related to water-distribution pipelines. Water-main refurbishment construction work. Water-treatment work. Carriageway resurfacing works. Surface coating construction work. Water-well drilling. Engineering design services. Engineering design services for the construction of civil engineering works. EKDU1_Aba Design and construction Reference Number: EKR000258522020 Under contract number KEHOP-2.1.3-15-2016-00033 Number "Eight water quality improvement program Koezep-Dunantul 1." Cellar, Tamas, Kistormas, Installers and KEHOP-2.1.2-15-2016-00001 Identification Number "Aba Large-scale IVV Quality Improvement Project" Design and Construction of AbaFulfillment of its tasks under the terms of FIDIC Sarga Koenyv Main Site: Cellar, Tamas, Kistormas, Koelesd, Aba (XII. 19.) defines the tasks of the AK: The main indicative quantities of the construction are as follows: and ammonium decontaminant)equipment installation, new water treatment epuelet and related installation (well; yard pool; iron sludge installation; yard drainage network; service). 4, 5), replacement of the butterfly pump. No. 4 you want to apply raw water pipes to the waterworks, and this is also the case with No. 4. Tamas: Within the development framework, install a complete 2700 m3 / d (135 m3 / h), complex water treatment (iron, manganese and ammonium decontamination) installation and associated installations (water treatment epuelet, decanter) swimming pool, clean water storage, wells, courtyard network). The replacement of existing wells with a pump pump is planned (8 wells), two wells with borehole refurbishment and 1 new wells need to be replaced. with 7 035 fm NA100 pipe diameter larger (NA150, NA200, NA300) epithelial epithelium (DN = NA), and 55 202 mm mains purification. Koelesd The planned solution is to connect the two existing water supply systems (Koelesd-Kistormas and Koelesd-Borjad telepresesres) which are currently in operation and will be supplied to consumers from a newly constructed water plant in K-lesd by a new water plant of 5 047 fm. The complex has a water capacity of 14 m3 / hthe installation of the equipment (iron, manganese and ammonium decontamination), the new water treatment plant and the construction of the associated installations (water storage pool; decanter pool; courtyard network;) will be completed. as well as the wash basin of the grid with a length of 23 443 fm.to replace the worst-case or inadequate diameter pipe sections with new D110 KPE backbone lines. new water treatment plant and related facilities (sewage sludge installation; yard drainage; service) are implementedwater supply plant development on betap site In the frame of the project, there will be a series of keruel 3 pump pumps and replacement of the water pump in the four existing wells. 2009th (IX. 15.) Government Decree. The winner in timeThe Contractor bears full responsibility for the correctness of the documents and plans made on his site and for compliance with the applicable standards, regulations and other requirements. planned epithelial and mernoek settlementfor the second edition of the Revised Hungarian Edition, September 2011). (VII.11.) Of the Government of the Republic of Hungary - Coatings of specialists with MV-E and VZ-TER privileges. AT encloses a statement stating that, at the date of the contract test, the contractor will have a period of 266/2013 during the period of performance of the contract. (VII.11.) Authorized specialist (s) with MV-E and VZ-TER authority according to Government Decree. Details: KD. In principle, you cannot have AT, AV, or ALK IG hosted by as opposed to Kbt. Article 62 (1) to (2) excludes any of the grounds for exclusion. Section 74 para. (1) letter b) excludes from the procedure an AT, AV or ALK IG hosting organization thatfrom the Kbt. The exclusions provided for in Article 62 (1) - (2) shall be applied in the course of the procedure. .) and the Kbt. Article 65 (7) ALK IG organization / person (represented by the AT) at the time of submission of the aj the single European Co-Procurement Document generated by the ECRmentions (EEKD) must be proven in advance that they are not subject to the exclusion criteria. Preliminary justifications for the EEKD are in Section 4, 6-7 BC. - base should be repainted Kbt. According to - 67 (4), an AT with respect to an AV which does not include an alphabet in the alphabet shall be provided with an arrow stating that the author does not fully accept the Kb. There are six grounds for exclusion under - 62 (1) and (2)alya al rain AV (Form generated by ECR, in case of koezoes suggestion, kueloen statement by koezoes expert members). AK a Kbt. 69 (4) to (6), the jar is broken. On the basis of - 69 (4) - (6), the host called upon to certify, in accordance with -- 8, 10, 12-16 of the Cr. draws attention to the provisions of - 1 (7) of the Cr. AT fin the case of a Cegbirosag variation registration procedure, the variation registration filing filed with the cegbirosag and the certification of its validity by the cegbirosag, and attaches a solemn declaration to this form (also in case of non-negligence) when entering the aj in the aj, refer to EEKD IV. resz alpha dot nexteltesevel must verify in advance that it complies with the Kbt. Article 65 is based on the introduction of the following by the Ko coevs: - 69 (4) para. according to keruel line. The Kbt. -- 65 (1) (c) and 322/2015. (X.30.) K.r. According to - 8 (1) of the AK Regulations, according to the object of design service related to the construction of the Epites, the competent professional chamber of the countryor, in the case of economic operators not established in Hungary, the registered office of the country of establishment or the license, legal certificate or organizational, chambers` membership of the country of establishment. SZ.2. The Kbt. -- 65 (1) (c) and 322/2015. (X.30.) K.r. Pursuant to - 21 (1) AK is the rule for the construction industryIn the case of economic operators carrying out construction activities, the provisions of the Etv. or in the case of economic operators not established in Hungary, with the registration in the country of establishment or with the authorization, legal title or organization of the country of establishment The public domain is controlled by AK if Kbt. In the cases referred to in Article 69 (11), the free inspection of the relevant data and breeds shall not be substantiated by simple extraction of the extract, the certificate drawn up by the body managing the register or the document certifying the breed in the register.i. Continued on: III.1.2 BC Rev. 1 (1) BC on the basis of the offer, the bidder must prove in advance that he / she complies with the Kbt. 65 of the Basic Law to suitably qualified persons as defined below. Pursuant to Article 2 (5) of the Criminal Code, the ex-ante certification of aptitude testimonials accepts a simple statement by the single European coezer(ie, the IV alpha point is a different case). -- 69 (4) to (7) On the basis of the submission of certificates of aptitude test, the economic operator called upon to prove that he or she complies with the aptitude test is as follows: P.1. The Kbt. Article 65 (1) para. a) es -19 (1) of the Cr. (c) and Article 19 (5). basically attach the present fthe last 3 business days before the sale, which are closed at the merchant `s turn, supplies (water supply and design work and / or water supply construction work) are invoiced and invoiced. when you started your activity, if you order this datathey are underwritten. If the Contractor does not have the business data for the business year prior to the commencement of the present assignment, which is 3 days prior to the commencement of the contract, the net commencement of the commencement of the activity shall comply with the minimum attendance required. (3) and (7) Certification of aptitude is in accordance with Kbt. Paragraphs (11) to (11a) of Article 69 also apply. K This procedure is described in Section 53 (6) Kbt. basis.Kbt.135. (12), AK draws AT`s attention to the fact that it has submitted a support (support; contract modification, declaration of diversion) for support. AK informs AT that it iso not accepting the request or accepting it to a lesser extent than the claimant, or if relevant to the Togolese Contract (TSZ) mod or val. Bey. does not accept acceptance as a dog story to which AK may refer in its contract test (Section 131 (9) Kbt) or its performance. es a Ptk.6: 116. - (1) based on the procedure even thenit would be ineffective to disclose it if you authored it. penzuegyi TSZ not keruel megkoetes or TSZ mod. not keruel alairas or valt. Bey. not keruel for acceptance.I`m presenting the author. the power of his exuberant conditions lay hidden. Attachment (AT), organization certifying aptitude (alk) attested by: Offer to alairok alairasi cimpeldanyat, or - 9 (1)erinti alairasminuttu, a case in Kelfoeldi, a document equivalent to this (if this document is not known in the given country, it is included in a full-fledged private v. vegyved / co-registrar / deed of a chamber attorney), for the subroutine of your bid (i.e.authorized and authorized submissions). in this case, the Applicant will accept any attachment to a document which is suitable for proof of authority (eg personal identification) 3. The offer should include: - Kbt66 (6) (a) and b) (also with negative content) - Kbt66 (6)k. arrow, - Kbt. According . 4th Ert. and the upper limit of points awarded according to the criteria: 0.00-10.00 points; 0.00 points worst, 10.00 points best. Methods: 1 st. Aspect: Reverse Ar in accordance with KH 26.11.2019 ("Utm."), 1.mA1.aa. .Straight line 1ab (Res. AD.I.koetet) (most favorable 36 months, most unfavorable 0 months). Attachment 2 of the drawings is appropriate for the second aspect of the proposal. 5. III.1.2) P.1. and III.1.3) Conditions as set out in M.1 to M.2. mods certified reviewers tougher listing terms tougher 6. Your insurance offer is 10 000 000 HUF. Choice of ATaccording to AK 10032000-00332945-00000024 can be fulfilled with the required pencil nail. with a deposit on a payment account, with a penzuegyi instezmeny or insurer with a guarantee or collateral security, or with an insurance policy. with a bailiff`s deposit guarantee. Confirmation: Your bank charge will be charged in the event of a cash transferIn the event of performance of any guarantee, bail guarantee, bailiff`s or insurer`s statement of guarantee, or in the event of performance of an insurance contract, you shall expressly note the following: A statement thatkoezvetlenuel serves as the basis for any certification testimonial (either a warranty statement or warranty statement), comply with the requirements of a fully-fledged private record of civil litigation as stated in the Civil Code! Based on - 35 (8), it is not possible to organize a farm codet (project partnership) 8. AK applies -75 (2) (e) of the Civil Code. Continued: AF VI.4.3) Internet address (URL): http://www.nfp.hu
The bid deadline for Contract notice: Works for complete or part construction and civil engineering work was 04 May 2020. Bidding is closed.
This tender has been issued by NFP NEMZETI FEJLESZTÉSI PROGRAMIRODA NONPROFIT KORLÁTOLT FELELŐSSÉGŰ TÁRSASÁG in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45200000 - Works for complete or part construction and civil engineering work, 45232100 - Ancillary works for water pipelines, 45232150 - Works related to water-distribution pipelines, 45232151 - Water-main refurbishment construction work, 45232430 - Water-treatment work, 45233223 - Carriageway resurfacing works, 45233228 - Surface coating construction work, 45262220 - Water-well drilling, 71320000 - Engineering design services, 71322000 - Engineering design services for the construction of civil engineering works.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 41683895. The purchaser document reference is 131481-2020.