Expired Tender Poland ICB TOT Ref. 40354478

Contract notice: Works for complete or part Tender - 40354478

Tender notice from Poland, published on 06 Feb 2020.

Exeutive Summary

The PAŃSTWOWE GOSPODARSTWO LEŚNE LASY PAŃSTWOWE REPREZENTUJĄCE SKARB PAŃSTWA NADLEŚNICTWO ZDROJE has issued a Tender notice for the procurement of a Contract notice: Works for complete or part construction and civil engineering work in the Poland. This Tender notice was published on 06 Feb 2020 and is scheduled to close on 16 Mar 2020, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 40354478, while the tender notice number is 058273-2020 and Register on the platform.

Key facts

Summary
Contract notice: Works for complete or part construction and civil engineering work
TOT Ref. No.
40354478
Document Ref. No.
058273-2020
Country
Poland
Notice type
Tender
Competition
ICB
Publication date
06 Feb 2020
Bid deadline
16 Mar 2020
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Works for complete or part construction and civil engineering work
Description: Contract notice: Works for complete or part construction and civil engineering work
Authority Type: Other
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45200000, 45111200, 45240000, 45248000, 45112100, 45112210, 45200000, 45111200, 45240000, 45248000, 45112100, 45112210, 45100000
CPV Description: Works for complete or part construction and civil engineering work.
Site preparation and clearance work.
Construction work for water projects.
Construction work for hydro-mechanical structures.
Trench-digging work.
Topsoil-stripping work.
Site preparation work .
Performance of construction works under the project "Comprehensive project of adaptation of forests and forestry to climate change - small retentionand prevention of water erosion in mountainous areas "
Reference Number: SA.270.10.2019.S3
Full name of the contract (the name is shortened to 200 characters due to the form requirement above): Execution of construction works for the tasks implemented under the project" Comprehensive project of adaptation of forests and forestry to climate change, small retention and prevention of water erosion in its areas"co-financed from the resources of the Cohesion Fund under the Operational Program Infrastructure and Environment (POIS.02.01.00-00-0006 / 16-00).
Main Site: Nadleśnictwo Zdroje, Wolany forestry
The investment will consist in the construction of a reservoir with necessary equipment associated with the intake, damming and discharge of water. The investment is aimed at restoring the reservoir for usehappy during the flood. The works will consist of the construction of a dike along with its drainage, desludging and shaping of the reservoir bowl, construction of a damming monk, construction of a surface overflow, construction of an intake in the form of a surface overflow with a truss at the inlet to the tank, construction of an access ramp, reconstruction of the side trough along the rapids with shore strengtheningand construction of protection of the existing watercourse channel against blurring.
A detailed description of the subject of the order is specified in the design documentation (attachment to the ToR), which includes: construction design, detailed design, technical specification of execution and acceptance of construction works, bill of quantities.
For granting Contractors who meet may apply for public procurementconditions regarding the possession of competences or authorizations to conduct specific professional activities, provided that it results from separate provisions. The Employer does not set a detailed condition in this respect.
The Contractors who meet the conditions relating to the economic or financial situation may apply for the public procurement.
The Employer requires that the Contractors show that they findit is in an economic and financial situation ensuring the performance of the contract, in particular:
For task 1:
- they have their own funds or access to a credit line in the amount of minimum PLN 1, 000, 000.00 (in words: one million zlotys),
- they have liability insurance in the scope of conducted activity for the amount not less than PLN 1, 000, 000.00 (in words: one sq m)ilion zlotys).
For task no. 2:
- they have their own funds or access to a credit line of at least PLN 50, 000.00 (say: fifty thousand zlotys),
- they have third party liability insurance in the scope of their business for the amount not less than PLN 50, 000.00 (say: fifty thousand zlotys).
For task No. 3:
- they have their own fundsor access to a credit line in the amount of minimum PLN 250, 000.00 (in words: two hundred and fifty thousand zlotys),
- they have third party liability insurance in the scope of conducted activity for the amount not less than PLN 250, 000.00 (in words: two hundred and fifty thousand zlotys) .
For task No. 4:
- they have their own funds or access to a minimum credit linePLN 20, 000.00 (in words: twenty thousand zlotys),
- they have civil liability insurance in the scope of their activity for the amount not less than PLN 20, 000.00 (in words: twenty thousand zlotys).
For task No. 5:
own funds or access to a credit line in the amount of minimum PLN 150, 000.00 (in words: one hundred and fifty thousand zlotys),
- they haveliability insurance in the scope of conducted activity for an amount of not less than PLN 150, 000.00 (say: one hundred and fifty thousand zlotys).
For task No. 6:
- they have their own funds or access to a credit line in the amount of at least 700, 000.00 PLN (say: seven hundred thousand zlotys),
- they have civil liability insurance in the scope ofand repayments for an amount of not less than PLN 700, 000.00 (in words: seven hundred thousand zlotys).
For task 7:
- they have their own funds or access to a credit line in the amount of at least PLN 400, 000.00 (in words: four hundred thousand zlotys) )
evaluation of compliance with the above conditions will be made on the basis of documents and statements requested to be attached to the offers or at the request of the Employer and indicated in Chapter 8 of the ToR on the basis of meets / does not meet.
1. Documents required at the bid submission stage: Single European Procurement Document
commitment of third parties to make available the necessary resources.
2. Documents and statements submitted at the request of the Employer to confirm the circumstances referred to in art. 25 paragraph 1 of the Public Procurement Law:
a. list of works being built;
b. list of persons;
c. information from the bank or cooperative savings and credit union;
d. liability insurance;
e. an excerpt from the relevant register or from the central register and information on business activities;
f.certificate:
- of the competent head of the tax office,
- of the appropriate local organizational unit of ZUS or KRUS;
g. information from the National Criminal Register;
h. the Contractor`s statement of the lack of:
- prohibition to apply for public contracts,
- delay in payment of taxes, fees or social security or health insurance contributions,
- final court judgment in the field of art. 24 paragraph 5 point 5and 6 of the Public Procurement Law,
- the final administrative decision in the scope of art. 24 paragraph 5 point 7 of the Public Procurement Law;
i. Contractor`s declaration of non-payment of local taxes and charges.
3. Documents of foreign entities:
a. information from the relevant register or other equivalent document to the extent specified in art. 24 paragraph 1 item 13, 14 and 21 of the Public Procurement Law;
b. document:
- submitted in relation to personsy residing outside the territory of the Republic of Poland to the extent specified in art. 24 paragraph 1 points 14 and 21 and par. 5 point 6 of the Public Procurement Law,
- confirming the Contractor`s non-payment of taxes,
- confirming that the Contractor`s liquidation has not been opened.
Within 3 days from the date of posting on the website information from the opening of tenders, the following should be submitted:
declaration of belonging or not affiliatione. to the same capital group. 22a of the Public Procurement Law, submitting documents referred to in item 2 item e and i with respect to these entities. Contractors may jointly apply for the award of the contract. In this case, the Contractors shall appoint a proxy to represent andin proceedings for the award of a contract or representation in proceedings and conclusion of a public procurement contract.
In the event of joint application by the Contractors, the completed form of the Single European Order Document shall be submitted by each of the Contractors jointly applying for the contract. These documents confirm compliance with the conditions for participation in the procedure and bno grounds for exclusion to the extent that each of the Contractors demonstrates that they meet the conditions for participation in the procedure and no grounds for exclusion.
Contractors who are not subject to exclusion pursuant to art. 24 paragraph 1 point 12 23, art. 24 paragraph 5: point 1, point 7, point 8, art. 24 paragraph 7 of the Public Procurement Law and meet the conditions for participation in the proceedingsincludes the possibility of awarding contracts referred to in art. 67 section 1 item 6 of the Public Procurement Law, within 3 years from the date of the basic contract with a value of up to 30% of the value of individual parts of the basic contract. These orders will consist of repetition of construction works similar to construction works being the subject of this contract.
The contracting authority requires a bid bond ofas outlined below for the tasks:
- No. 1: PLN 65, 000,
- No. 2: PLN 2, 900,
- No. 3: PLN 15, 000,
- No. 4: PLN 1, 100,
- No. 5: PLN 9, 000,
- No. 6: PLN 44, 500,
- No. 7: 23, 500 PLN.
The bid security should be paid before the submission deadline. The bid bond may be lodged in one or several forms, as specified in the Public Procurement Law. The bid bond paid in cash should be brought by bank transfer to the bank account of the Employer No. 61 1130 1033 0018 81 77 7590 0002 with an annotation enabling the procedure to be identified and part thereof. A deposit in cash will be effective if it is credited to the Purchaser`s bank account within the given deadline.
Internet address (URL): www.zdroje.wroclaw.lasy.gov.pl

Documents

Tender Notice
Login to view

Similar tenders

Poland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Works for complete or part construction and civil engineering work was 16 Mar 2020. Bidding is closed.

This tender has been issued by PAŃSTWOWE GOSPODARSTWO LEŚNE LASY PAŃSTWOWE REPREZENTUJĄCE SKARB PAŃSTWA NADLEŚNICTWO ZDROJE in Poland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45200000 - Works for complete or part construction and civil engineering work, 45111200 - Site preparation and clearance work, 45240000 - Construction work for water projects, 45248000 - Construction work for hydro-mechanical structures, 45112100 - Trench-digging work, 45112210 - Topsoil-stripping work, 45100000 - Site preparation work.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 40354478. The purchaser document reference is 058273-2020.

See the Similar Tenders section on this page or browse other tenders from Poland.

This tender falls under Construction and Real Estate in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.