Contract notice: Works for complete or part Tender - 38543306
Tender notice from Poland, published on 03 Dec 2019.
Exeutive Summary
The PA?STWOWE GOSPODARSTWO LE?NE LASY PA?STWOWE NADLE?NICTWO TUSZYMA has issued a Tender notice for the procurement of a Contract notice: Works for complete or part construction and civil engineering work in the Poland. This Tender notice was published on 03 Dec 2019 and is scheduled to close on 09 Jan 2020, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 38543306, while the tender notice number is 570597-2019 and Register on the platform.
Key facts
Summary
Contract notice: Works for complete or part construction and civil engineering work
Object of the contract Works for complete or part construction and civil engineering work Description: Contract notice: Works for complete or part construction and civil engineering work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45200000, 45100000, 45110000, 45111000, 45112100, 45112700, 45240000, 45246200, 45248000, 45200000, 45100000, 45110000, 45111000, 45112100, 45112700, 45240000, 45246200, 45248000 CPV Description: Works for complete or part construction and civil engineering work. Site preparation work. Building demolition and wrecking work and earthmoving work. Demolition, site preparation and clearance work. Trench-digging work. Landscaping work. Construction work for water projects. Riverbank protection works. Construction work for hydro-mechanical structures. Modernizacja zbiornika retencyjnego w oddz.72 Leśnictwa Goleszow together with the infrastructure adapting the object to the water intake for fire purposes. Task no. Tuszyma Forest District, ForestryGoleszow, division 72, plots with registration numbers 850, 851, town of Goleszow, commune Mielec Subject of order is the execution of construction works involving the modernization of the retention reservoir in branch 72 of the Goleszow Forest District together with the infrastructure adapting the facility for water intake for fire purposes. The scope of work envisaged to be carried out is presented in the attached description of the subject of the orderDesign documentation, which includes the Construction Design, Executive Design, Technical Specification of Workmanship and Acceptance of the Robot (hereinafter "STWiORB") and Bill of Quantity robot constituting Annex No. 1 to the ToR. Due to the lump sum nature of the contractual remuneration the attached "Bill of Quantity" is an auxiliary element bid calculation. Works must be carried out in accordance with the ToR, provisionsthe provisions of the concluded contract, Design documentation, principles of current technical knowledge, applicable regulations and standards in this respect, and the art of construction. In connection with the above, the Contractor may not demand remuneration for works not included in the "Bill of quantities", and necessary to perform during the implementation of the subject of the contract even if at the time of concluding the contract at allIt was planned to predict the size or cost of the work. The detailed conditions for the implementation of the contract include a model contract. In all places of the Terms of Reference or technical doctrine, where an exemplary trademark, patent, origin, source or specific process was used, or if the Employer described the subject of the order by reference to standards, European technical assessments, approvals, technical specifications. and reference systemand tech. referred to in art. 30 paragraph 1 point 2 and par. 3 of the Public Procurement Law, unless it is justified by the specifics of the subject of the order. The ordering party cannot describe the subject of the order by means of sufficiently precise terms, and in each case, acting in accordance with art. 29 paragraph 3 of the Act and art. 30 paragraph 4 of the Act, the Employer allows equivalent solutions, indicating such indications or referenceswith the words "or equivalent" or "or equivalent" (including the use of other materials and devices), provided that parameters are not inferior to those specified in the description of the subject of the contract, as well as the maintenance of the technology of manufacture, i.e. as a result of a change in material change in performance technology would occur, which would result in a change in the technical documentation. Description according to the Common Dictionarylambs (CPV). Main subject of the contract: 45100000-8 Preparation of the area for construction 45110000-1 Demolition and dismantling of construction works; Earthworks 45111000-8 Demolition work, earthworks 45112100-6 Trenching work 45112700-2 Landscaping work 45240000-1 Construction of water engineering facilities 45246200-5 Construction of river embankments 45248000-7 Construction of hydromechanical structures The Employer requires employment by the Contractor or subcontractor under an employment contract within the meaning of the Labor Code of persons performing activities included in the subject of the contract, regarding the following works: a) Preparation of the site for construction, b) Earthworks, c) Strengthening of the earth causeway, d) Construction of a tower overflow, e) Construction of a maneuvering yardo and a water well for fire protection purposes, f) Other works (items 47-57 Bill of Quantity). The Employer does not require employment on the basis of an employment contract of persons performing independent technical functions in construction, i.e. construction manager and in the field of geodesy and cartography, i.e. a surveyor. In addition, the Contractor should specify his own needs in terms of personnel resources and if he considers thata larger number of people is needed to carry out the contract, i.e. they are obliged to employ (by the contractor or subcontractor) under the employment contract persons performing activities included in the subject of the contract if the performance of these activities will consist of performing work in the manner specified in art. 22 -1 of the Act of 26 June 1974 - Labor Code (vol.: Journal of Laws of 2019, item 1040.1043.1495.). CONDITIONS FOR PARTICIPATION IN THE PROCEEDINGS AND GROUNDS FOR EXCLUSION cont. II.2.14 or whose bankruptcy has been announced, except for an economic operator who, after being declared bankrupt, has entered into an arrangement approved by a validcourt ruling, if the arrangement does not provide for satisfaction of creditors by liquidation of the bankrupt's assets, unless the court ordered the liquidation of its assets pursuant to art. 366 section 1 of the Act of February 28, 2003 - Bankruptcy Law (consolidated text of the Journal of Laws of 2019, item 498, 912, 1495, 1655, 1802, 2089); - art. 24 paragraph 5 point 1 of the Public Procurement Law; 2) who has seriously violated his professional obligationswhich undermines his integrity, in particular when the contractor, as a result of the intended act or gross negligence, failed to perform or improperly performed the contract, which the contracting authority is able to demonstrate by means of appropriate evidence - art. 24 paragraph 5 point 2 of the Public Procurement Law; 3) if the contractor or persons referred to in art. 24 paragraph 1 point 14 of the Public Procurement Law, authorized to represent the contractorremain in the relationships specified in art. 17 clause 1 items 2-4 of the Public Procurement Law with: a) the awarding entities b) persons authorized to represent the awarding entity c) members of the tender committee d) persons who submitted the declaration referred to in art. 17 clause 2a of the Public Procurement Law, unless it is possible to ensure impartiality on the part of the contracting authority in a way other than by excluding the contractor from participating in the progressiveniu - art. 24 paragraph 5 point 3 of the Public Procurement Law; 4) which, for reasons attributable to it, did not perform or improperly performed significantly the previous public procurement contract or concession contract concluded with the awarding entity referred to in art. 3 clause 1 item 1-4 of the Public Procurement Law, which led to the termination of the contract or the award of damages - art. 24 paragraph 5 point 4 of the Public Procurement Law; 5) beinga natural person who has been validly convicted of an offense against an employee's rights or an offense against the environment, if for committing the sentence of imprisonment, restriction of liberty or a fine of not less than PLN 3, 000 - art. 24 paragraph 5 point 5 of the Public Procurement Law; 6) if an active member of his management or supervisory body, a partner in a public partnership or partnershiphe or the general partner in a limited partnership or limited joint-stock partnership or commercial representative, a final conviction for the offense referred to in art. 24 paragraph 5 point 5 of the Public Procurement Law - art. 24 paragraph 5 point 6 of the Public Procurement Law; 7) for which a final administrative decision was issued regarding violation of obligations arising from labor law, environmental protection law or social security provisions, ifand a financial penalty of at least PLN 3, 000 was imposed on this decision - art. 24 paragraph 5 point 7 of the Public Procurement Law; 8) which has violated the obligations regarding taxes, fees or social security or health insurance contributions, which the contracting authority is able to prove by means of appropriate evidence, with the exception of the case referred to in art. 24 paragraph 1 point 15 of the PZP Act, unless the contractor made a paymenttaxes, fees or social security or health insurance contributions due, together with interest or fines, or has entered into a binding agreement on the repayment of those claims - Art. 24 paragraph 5 point 8 of the Public Procurement Law 2. meet the conditions for participation in the proceedings referred to in Art. 22 paragraph 1b of the PZP Act regarding: 1) competence or authorization to conduct specific professional activities, provided thatThis is due to separate provisions. The Awarding Entity does not impose specific requirements as to the description of compliance with this condition of participation in the proceedings. 2) economic or financial situation. A) The condition in relation to the economic situation. The Awarding Entity does not impose specific requirements regarding the description of compliance with this condition of participation in the proceedings. B) The condition regarding the financial situation will be metif the Contractor proves that he has the financial resources or cont. III.1.2) The condition in relation to the economic situation - the Employer does not set specific requirements for the description of compliance with this condition of participation in the proceedings. The condition in relation to the financial situation will be met if the Contractor demonstrates that it has financial resources or a credit rating of not less than 100, 000.00zł. To confirm compliance with the condition regarding financial standing, a document or information from the bank or cooperative savings and credit union confirming the amount of financial resources or creditworthiness of the contractor must be submitted, not earlier than 1 month before the deadline for submitting bids. If for a justified reason the contractor cannot submit documentsregarding the financial or economic situation required by the contracting authority, may submit another document which sufficiently confirms the fulfillment of the condition of participation in the procedure described by the contracting authority. Cd.III.1.1) creditworthiness not less than PLN 100, 000.00 3) capacity technical or professional: a) In terms of experience. This condition, in terms of experience, will be uknown as satisfied, if the Contractor demonstrates that during the last 5 years before the offer submission deadline (and if the business period is shorter - during this period) he has duly completed at least one civil engineering construction work with a value of not less than 500, 000, PLN 00 gross. B) In the scope of disposal of technical potential This condition, in terms of potential technical, shall be deemed to be met if the Contractor demonstrates that it has (or will have) at least the following machines, devices and vehicles: - 1 pc - truck - dump truck with a capacity of at least 16 tons, - 1 pc - crawler bulldozer, - 1 pcs. with excavator buckets at least 1.0 m 3 - 1 pcs. - excavator with a capacity buckets at least 0.6 m3 - 1 pcs. - backhoe loader with poh. spoons at least 1 m3 - 1 pcs. - self-propelled grader, - 1 pcs. - mechanical roller. This condition is subject to aggregation, which means that in the case of submitting an offer by Contractors jointly applying for the contract (e.g. consortia, civil partnerships), the above condition may be met jointly. c) As regards persons referred to the implementation of the contract he was the following persons who will participate in the performance of the contract: - A minimum of 1 person performing the function of construction manager, possessing construction permits without restrictions or to a limited extent to manage construction works of the hydrotechnical specialty *. * Authorizations issued in accordance with art. 12, art. 12a and art. 14 of the Act of 7 July 1994 Construction Law (consolidated text, Journal of Lawsfrom 2019 item 1186, 1309, 1524, 1696, 1712, 1815) or the corresponding valid building permits, which have been issued on the basis of previously binding regulations or the corresponding permits issued to citizens of the countries of the European Economic Area and the Swiss Confederation, subject to art. 12a and other provisions of the Construction Law and the Act of 22 December 2015 on the principles of recognition of professional qualifications acquired in the Member States of the European Union (Journal of Laws of 2018, item 2272), which entitle to perform independent technical functions in construction during the implementation of the subject of the contract, taking into account its scope. In addition The contracting authority requires the constant presence of the construction manager on the investment site during construction works - A minimum of 4 employees with qualifications necessary to perform the works covered by the contract in the scope of: • truck driver - at least 1 person; • operator of bulldozers, excavators or backhoe loaders - at least 3 people. This condition is subject to adding up, which means that in the case of submitting an offer by Contractors jointly applying for the contract (e.g.consortia, civil law partnerships), the above condition may be fulfilled jointly. Cd. IV.2.7) submits information from the relevant register or, in the absence of such a register, another equivalent document issued by the competent judicial or administrative authority of the country in which the contractor has its registered office or place of residence or residence has the person to whom the information or document relates specified inArt. 24 paragraph 1 point 13, 14 and 21 of the PPL Act and in art. 24 paragraph 5 points 5 and 6 of the PPA Act Documents referred to above in point 13.5. paragraph. 1 lit. a) and item 13.5 para. 2 ToR should be issued not earlier than 6 months before the deadline for submission of bids. Documents referred to above in item 13.5. paragraph. 1) lit. b) should be issued not earlier than 3 months before the expiry of the psubmitting bids. If in the place of residence of a person or country in which the Contractor has its seat or place of residence, the documents referred to in point 13.5., Are replaced by a document containing the contractor's statement, indicating the person or persons authorized to represent him, or the statement of the person to whom the document was to be submitted, lodged before a notary publicor before a judicial, administrative or professional or economic self-government body competent for the seat or place of residence of the contractor or the place of residence of that person. The provisions of point 13.6.SIWZ shall apply accordingly. In case of doubts as to the content of a document submitted by the Contractor having its registered office or place of residence outside the territory of the Republic of Polandej Polska, the Awarding Entity may apply to the competent authorities of the place of residence of the person or country in which the Contractor has its registered office or place of residence, respectively, with the request to provide the necessary information regarding the document submitted. will be given in foreign currencyit is the Employer who will convert the value of the currency into PLN according to the average exchange rate of the National Bank of Poland from the day of submitting the announcement of the order to the Official Journal of the European Union. all Contractors jointly applying for the contract; b) the offer must be underwritten in such a way that it legally binds all Contractors jointly applying for the contract. The person signing the offer must have legal representation. The authorization must result from the content of the power of attorney attached to the offer, the content of the power of attorney should precisely specify the scope of the power of attorney; c) EAT is submitted by each of the contractors jointly applying for the contract.These documents confirm the fulfillment of the conditions for participation in the procedure and the lack of grounds for exclusion to the extent that each of the contractors demonstrates compliance with the conditions for participation in the procedure and the absence of grounds for exclusion. The statement of the contractors jointly applying for the order submitted on the EAT form should be submitted before the deadline for submission of tenders under pain ofvalidity, in electronic form, provided with a qualified electronic signature, by each of them to the extent that they confirm fulfillment of the conditions for participation in the procedure and the lack of grounds for exclusion. d) documents referred to in point 13.2. point e- SIWZ will be obliged to submit each of the contractors jointly applying for the award of the contract e) all Contractors togetherApplicants shall be jointly and severally liable for the performance of the contract; f) Contractors jointly applying for the award of the contract shall appoint from among themselves the managing Contractor (Proxy) authorized to incur obligations, receive instructions and instructions for and on behalf of everyone, as well as for all partners; g) The Employer may be liable under liabilitydemand full performance of the contract (cont. VI.4.3) Internet address (URL): www.tuszyma.krosno.lasy.gov.pl
The bid deadline for Contract notice: Works for complete or part construction and civil engineering work was 09 Jan 2020. Bidding is closed.
This tender has been issued by PA?STWOWE GOSPODARSTWO LE?NE LASY PA?STWOWE NADLE?NICTWO TUSZYMA in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45200000 - Works for complete or part construction and civil engineering work, 45100000 - Site preparation work, 45110000 - Building demolition and wrecking work and earthmoving work, 45111000 - Demolition, site preparation and clearance work, 45112100 - Trench-digging work, 45112700 - Landscaping work, 45240000 - Construction work for water projects, 45246200 - Riverbank protection works, 45248000 - Construction work for hydro-mechanical structures.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 38543306. The purchaser document reference is 570597-2019.