Contract notice: Works for complete or part Tender - 38150435
Tender notice from Poland, published on 20 Nov 2019.
Executive Summary
The PA?STWOWE GOSPODARSTWO LE?NE, LASY PA?STWOWE, NADLE?NICTWO LUBACZÓW has issued a Tender notice for the procurement of a Contract notice: Works for complete or part construction and civil engineering work in the Poland. This Tender notice was published on 20 Nov 2019 and is scheduled to close on 30 Dec 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 38150435, while the tender notice number is 548619-2019 and Register on the platform.
Key facts
Summary
Contract notice: Works for complete or part construction and civil engineering work
Object of the contract Works for complete or part construction and civil engineering work Description: Contract notice: Works for complete or part construction and civil engineering work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45200000, 71322000, 45247000, 45247200, 45247210, 45247220, 45247230, 45247240, 45247270, 45111200, 45111230, 45200000, 71322000, 45247000, 45247200, 45247210, 45247220, 45247230, 45247240, 45247270, 45111200, 45111230 CPV Description: Works for complete or part construction and civil engineering work. Engineering design services for the construction of civil engineering works. Construction work for dams, canals, irrigation channels and aqueducts. Construction work for dams and similar fixed structures. Dam construction work. Weir construction work. Dyke construction work. Static barrage construction work. Reservoir constructionworks. Site preparation and clearance work. Ground-stabilization work. Construction of retention reservoirs in the Opaka and Budomierz forestry Reference Number: S.270.1.14.2019 The subject of the order is the design and implementation of construction works for the investment task "Construction of storage reservoirs in the forestry of Opaka and Budomierz" Main Site: Podkarpackie Voivodship, Lubaczowski Poviat, gmina Lubaczow, Forest District Lubaczow, Forestry Opaka, branch 111 A l, k, g, m. Registered plot No. 207/5 in the Szczutkow District Przedm. Order a. is invited, obtained all requirements law of consent and permission. necessity. to obtain pSCI. on building and start construction work, make an environmental inventory before starting construction work and after their completion, implementation of construction works in the field and obtaining permitsand on the use of the reservoir in Opaka forestry. Basic. param. TANK. plans. for implementation: Capacity rebuke. water: min. 20, 700 m3, Area tank: 2.3 ha / 10%, - 5%, avg. water surface depth: approx. 1.0 m, with space przegłęb. in the bottom of the reservoir, Front dike crown width: 2.0-3.0 m, n = 1: 2 - 1: 3, Stir-drain device: 1 pc, Emergency overflow: 1 pc Existing drainage ditch (topatency): length about 120m. hardening access to the tank on a total area of 900 m2, width min. 3m. Construction works will consist in forming the bottom of the tank, the slopes of the tank and the causeway, and developing the remaining soil around the tank. It is recommended that the molding material; islands, slopes and dikes came from the spoil (when forming the bottom of the reservoir) To regulate the water level in the reservoirIn the frontal dyke, a five-way monk and an emergency overflow should be made. The dyke's escarpment should have an irregular shape and be protected against damage from beavers by a steel mesh built into the embankment. When forming the tank slopes, a gentle descent for animals (at a watering hole) should be taken into account on one bank. Basic materials for use in the implementation of the contracta: oak wood, natural stone. The Employer shall provide the Contractor with the following documents: 1 copy of the map for design purposes, a copy of the Decision on conducting public purpose investments, 1 copy of the functional and utility program (Annex 10 to the ToR), a copy of the project information card, a copy of the Decision to discontinue the decision on environmental conditions, a copy of the RDLP letter in Krosno of 16.06.2011 spr. ZU-0746-3 / 26/11 on land development, (Annex 8 to the ToR), project implementation manual, (Annex 14 to the ToR), 1 copy of the general Technical Specification for the execution and acceptance of the works (Annex 12 to the ToR), power of attorney to act on behalf of the Employer to various Institutions in order to obtain all the requirementsconsents, arrangements and permits regarding min. building permits and occupancy permits. To the obligations of the Contractor min. please: 2.1 Developing the concept of design solutions and determining the possibility of obtaining technical parameters assumed in the project information card (KIP) on the basis of documents received from the contracting authority, as in point 1.3, as well as geological surveys andrecognition of soil and water conditions, including the existence of animal species, i.e. beaver and grubby, made by the Contractor. 2.2. Timely submission for approval of the contracting authority of the project concept described in point 2.1 - in accordance with the project implementation schedule. The Contractor must take into account all suggestions and amendments of the Employer, excluding those that would result in a change in the recordsin the documents described in point 1.3. 2.3 After acceptance of the design solutions by the Employer, preparation of 5 copies of complete project documentation and 5 copies of water law report, with due diligence in a manner consistent with the arrangements set out in the documents received from the Employer and other documents and previously issued decisions obtained from the competent authoritiesduring the implementation of the investment, in accordance with applicable standards, regulations and principles of building art. 2.4. Developing an inventory of nature within an area of 100 m from the border of implemented facilities, including protected habitats, sites of protected species of plants and living places of protected species of amphibians and birds before commencing works, building and processing 1 orderthe document (the document should contain at least 3 photographs of four) Other obligations are described in points II.2.4 part 2 and VI.3 6.1. Contractors may apply for the contract if they: 1) are not subject to exclusion pursuant to art. 24 paragraph 1 points 12-23 and art. 24 paragraph 5 items 1-2 and items 4-8 of the PPL Act; 2) meet the conditions for participation in the procedure, pursuant to art. 22 paragraph 1b. Public Procurement Law, which have been determinedthey by the contracting authority in the contract notice and confirmed in the content of this ToR. The contracting authority in this procedure will apply the procedure for examination and evaluation of offers described in art. 24aa. Public Procurement Law The Contractor, by submitting an offer in an open tender, will be obliged to submit, by electronic communication, a declaration of lack ofset exclusions and fulfillment of the conditions for participation in the proceedings. These declarations should be made in electronic form on the formalized print of the uniform European order document, in accordance with the template of the standard form set out in the Implementing Regulation of the European Commission issued on the basis of art. 59 clause 2 of Directive 2014/24 / EU, hereinafter referred to as the "single document"or abbreviated" EAT "(Annex 1 to the ToR) and bear a qualified electronic signature. These declarations are to confirm the state as at the day of submitting the bids that the contractor submitting the bid is not subject to exclusion and meets the conditions for participation in the procedure in the scope indicated by the contracting authority. The JADE printable declarations shall be submitted by the contractor in electronic form, i.e. drawn up in the form ofwith a qualified electronic signature. Due to the fact that the content of the JEDZ form also includes statements and declarations that do not apply in these proceedings, its completion in all items is not mandatory. To facilitate its completion, the ordering party attached the instruction of completion prepared by the PPO on the website www.uzp.gov.pl. It is contained in the file: Uniform-European-Document-Orders-instruction.pdf Has financial resources or creditworthiness for an amount not less than; For partial task No. 1 min. PLN 500, 000.00. For partial task No. 2 min. PLN 300, 000.00. The Contractor submitting the bid for two partial tasks will demonstrate financial standing, adding up the funds held, for those parts for whiche makes an offer. The assessment of compliance with the conditions for participation in the procedure will be made on the basis of meets / does not meet on the basis of information contained in JEDZ, then confirmed in documents or statements submitted by Contractors. In the case of contractors jointly applying for the contract, each of the conditions for participation in the procedure specified in point 6.2.3. should meet at bestless one of these contractors or all these Contractors together. None of the contractors jointly applying for the award of the contract may be subject to exclusion from the procedure. Pursuant to art. 22d paragraph 2 of the Public Procurement Law, the Employer may, at any stage of the proceedings, consider that the contractor does not have the required capacity if the contractor's technical or professional resources are involved in other activitieseconomic activities of the contractor may have a negative impact on the performance of the contract. 6.3. Currency. If the documents submitted by the Contractor contain data in currencies other than those specified in the Terms of Reference, the contracting authority adopts the average NBP exchange rate as at the date of initiation of the procedure as the currency conversion rate. If on the day of initiation of the proceedings the exchange rate of a given currency was not announced by the NPB, the course announced immediately prior to the commencement of the proceedings applies. 2.8 Providing the Employer with the schedule for the execution of construction works, broken down into stages of construction works, in agreement with the Employer within 30 days from the date of receipt of the final building permit, but not later than 180 days from the date sign this Agreement. 2.9 Reporting the start of workconstruction and obtaining a construction log. 2.10. Conducting author's supervision, along with ongoing control of construction works as to compliance with the project, based on permits required by law, opinions, decisions, entries in the construction log and queries of the Employer. 2.11 Performance of the subject of the contract in accordance with the technical documentation, applicable regulations, norms and technical conditionsexecution and acceptance of the works, including protective deadlines for min. birds, reptiles, amphibians, described plants located at the construction site, with the Employer's instructions as well as the principles of technical knowledge and building art, submission of completed works for collection by an entry in the construction log. 2.12 Conducting works with ensuring conditions consistent with health and safety, fire protection and theft protectioneżą, and accepting the duties of an OHS coordinator. Based on the table of threats, the contractor will inform its employees about the threats to health and safety related to the subject of the contract and will provide the contracting authority with written confirmation of the transfer of this information. 2.13 Maintaining the construction site in good order, and after completing the work, tidying up the area and handing it over to Zamwithin the time limit set for the receipt of the robot. 2.14. Keeping a construction log, which is a documentation of works carried out. 2.15 Organizing the construction base at your own expense. 2.16 Conclusion of insurance contracts for damages that may occur on the construction site in connection with specific random events and civil liability and submitting them to the Employer. 2.17 Making an inventoryas-built surveying. 2.18. Preparation after completion of construction works, environmental inventory in the area up to 100 m from the border of implemented facilities, including protected habitats, sites of protected plant species and living places of protected species of amphibians and birds (The documentation should contain a minimum of 3 photos of the area covered by the inventory). 2.19no reports on the implementation of the task along with comparison to the project assumptions. 2.20 Land mass management in accordance with the guidelines included in the RDLP Krosno letter of June 16, 2011 spr. ZU-0746-3 / 26/11. 2.21. Preparation of documents for notification of the completion of the Contract, notification of the completion of construction works. 2.22. Obtaining a decision on the use of the object from the competent authority. 2.23 Afterthe works are completed and the originals of all decisions and studies obtained are submitted. The works are to be carried out in accordance with the principles of technical knowledge and building art, applicable regulations and norms, in particular the provisions of the Building Law, Polish standards transposing European standards or norms of other EEA Member States transposing these standards (pursuant to Article 30 (1) and3 of the Public Procurement Law, with due diligence, safety rules, good quality, proper organization of work and delivery of the subject of the Contract to the Ordering Party within the period agreed in the Contract, 3). The full description of the order is included in the Functional Program constituting Annex 8 to the ToR Information on all parts and points 2.1-2.4 described in point II.2.4 in part No., point 2.5-2.7 in point II.2.4in part no. 2, Internet address (URL): http://www.lubaczow.krosno.lasy.gov.pl/
The bid deadline for Contract notice: Works for complete or part construction and civil engineering work was 30 Dec 2019. Bidding is closed.
This tender has been issued by PA?STWOWE GOSPODARSTWO LE?NE, LASY PA?STWOWE, NADLE?NICTWO LUBACZÓW in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45200000 - Works for complete or part construction and civil engineering work, 71322000 - Engineering design services for the construction of civil engineering works, 45247000 - Construction work for dams, canals, irrigation channels and aqueducts, 45247200 - Construction work for dams and similar fixed structures, 45247210 - Dam construction work, 45247220 - Weir construction work, 45247230 - Dyke construction work, 45247240 - Static barrage construction work, 45247270 - Reservoir construction works, 45111200 - Site preparation and clearance work, 45111230 - Ground-stabilisation work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 38150435. The purchaser document reference is 548619-2019.