Contract notice: Works for complete or part Tender - 37720290
Tender notice from Poland, published on 05 Nov 2019.
Exeutive Summary
The SKARB PA?STWA - PA?STWOWE GOSPODARSTWO LE?NE LASY PA?STWOWE NADLE?NICTWO GROMNIK has issued a Tender notice for the procurement of a Contract notice: Works for complete or part construction and civil engineering work in the Poland. This Tender notice was published on 05 Nov 2019 and is scheduled to close on 06 Dec 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 37720290, while the tender notice number is 521465-2019 and Register on the platform.
Key facts
Summary
Contract notice: Works for complete or part construction and civil engineering work
Object of the contract Works for complete or part construction and civil engineering work Description: Contract notice: Works for complete or part construction and civil engineering work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45200000, 45240000, 45244000, 45247220, 45247230, 45200000, 45240000, 45244000, 45247220, 45247230 CPV Description: Works for complete or part construction and civil engineering work. Construction work for water projects. Marine construction works. Weir construction work. Dyke construction work. 39l Reference Number: SA.270.19.2019 The subject of the contract is the execution of construction works under the name: "Reconstruction (modernizacja) in the middle of the forest water reservoir in the Zalasowa forestry area 39l. Main Site: Gromnik Forest District, Zalasowa forestry, branch 39l 1. A detailed description of the Subject of the Order has been specified in the technical documentation, which consists of: - construction project, - detailed design, - STWiOR, - administrative decisions - bill of quantities. 2. Detailed information regarding the implementation ofof the station: a) Transport of materials to the construction site and from the construction site should be carried out by means of transport adapted to the tonnage specified on the access roads to the place of work (attention may be to tonnage). b) The Employer does not provide access to and service of media to the area of work. In connection with the above, the Contractor should include the above costs in the price of the offer. C) Performas part of the remuneration specified in the offer, the awca is obliged to perform and mark and secure work locations for the time of their implementation and ensure safe access and access to the work area. Investor, however not earlier than specified in points 4.1-4.2 SIWZ. E) The Contractor will estimate (include in the price of the offer) the value of remuneration, and then perform the following actions: - will carry out the main points of the object given in the design study, - provide work benchmarks in the link to state benchmarks, - will carry out geodetic measurements necessary for the correct implementation of the works and acceptance of the works covered by the tender (elevation of the object in the field, as-built measurements, including the development of as-built geodetic documentation, together with its clause in the appropriate center of geodetic and cartographic documentation, acceptance of the robot in the form of a colloquial survey) in the scope determined in the project, - will arrange the facilities and the construction site at the agreed location with the Employer, - at the latest on the day appointed for the transfere the construction site will submit to the Investor's Supervision Inspector a developed and complete safety and health protection plan, - he will make and install information boards in the place of the robot according to the Investor's Supervision Inspector, - if it is necessary to carry out tests, e.g. materials, soil, etc., the Contractor shall carry out these tests at its own expense, and will provide the results of the tests to the Employer together with the reportami acceptance, - the Contractor will obtain a final decision on the occupancy permit and will bear the costs related to administrative fees in this respect, - the technology for the execution of construction works has been specified in construction projects and the Technical Specification for the Performance and Acceptance of Construction Works. The indications given in the bill of quantities in the base column are only auxiliary and do not specifythey build construction technology. 3. Under this contract and the offer price, the Contractor will be obliged to: a) ensure efficient organization and development of the construction facilities, b) ensure the conditions of health and safety and fire protection in accordance with the law, c) make the necessary measurements and laboratory tests, etc. if they are necessary to hand over the Subject of the Order for use, d) to be prepared forphotographic documentation of each stage of the execution of the robot, e) in the case of using subcontractors to coordinate the work of subcontractors, bearing full responsibility for them, f) ensuring technical supervision of the task, supervision of staff in terms of order and work discipline, g) correct keeping construction documentation, h) performing works taking into account allconditions and orders resulting from mutual arrangements and obligations, i) when executing the order, ensuring that all materials used to perform the subject of the contract have admission to trading and proper declarations of compliance or certificates of compliance with applicable standards. Contractor, abovementioned documents on request of the Employer will provide at final acceptance. hatchedassembly of any materials and equipment that do not have valid certificates, 1. The Employer does not impose specific requirements as to the description of compliance with this condition of participation in the procedure. Exclusion from the procedure for awarding the contract in the circumstances referred to in art. 24 paragraph 1 point 12-23 PZP, art. 24 paragraph 5 points 1 2 and 4 8 PZP. 2. The offer must include: 1) the Bid formwith the cost estimate (the cost estimate should be made using the simplified calculation method based on the bill of quantities submitted by the Employer), prepared under pain of invalidity in electronic form, provided with a qualified electronic signature, Elelectronic, if the offer is submitted by a proxy, 3) power of attorney for a proxy appointed by Contractors jointly applying for the order, the power of attorney should be granted under pain of nullity, in electronic form, bearing a qualified electronic signature, 4) third party obligation or other document to demonstrate accessof the Contractor's potential by a third party, if the Contractor demonstrating compliance with the conditions for participation in the proceedings relies on the abilities or situation of other entities 5) EAT as the Contractor's own statement under pain of nullity, in electronic form, bearing a qualified electronic signature, 6) EAT for each of entities on resources which the Contractor relies on, under pain ofvalidity, in electronic form, provided with a qualified electronic signature, provided that the Contractor relies on the resources of other entities, 7) EAT for each of the Contractors jointly applying for the award of the contract, in the case of Contractors jointly applying for the award of the order, 8) security deposit in original in electronic form, bearing a qualified electronic signature osob authorized to issue it (only if the Contractor lodges a deposit in non-cash form). 9) The Contractor submits an offer via the Offer Form or the application available on platformazakupowa.pl. In the Bid form (Annex 4 to the ToR), the Contractor is required to provide the e-mail address to which correspondence related to the proceedings will be carried out. 3. Contractor to whomrta will be rated the highest on call: - list of construction works carried out not earlier than within the last 5 years before the deadline for submission of bids and evidence determining whether the construction works listed in the list have been properly performed, - list of persons referred by the Contractor to carry out the contract in particular responsible for providing services, quality controland / or management of works - information from the bank or cooperative savings and credit union confirming the amount of financial resources or creditworthiness of the Contractor in the period not earlier than 1 month before the deadline for submitting offers, to confirm the absence of grounds for uselooting based on art. 24 paragraph 5 item 1 of the PZP, - a statement of the competent head of the tax office confirming that the Contractor is not in arrears with payment of taxes, issued not earlier than 3 months before the deadline for submission of bids, is in arrears with payment of contributions tosocial or health insurance, issued not earlier than 3 months before the deadline for submitting bids, - information from KRK in the scope specified in art. 24 paragraph 1 point 13, 14 and 21 of the Act and regarding conviction for an offense to imprisonment, to the extent specified by the Employer, - statements on the lack of grounds for exclusion, referred to in art. 24 paragraph 1 items 15 and 22 of the PZP and in art. 24 paragraph 5 point 5 8 PZP. The documents should be valid as at the date of submission. 1. The Employer does not impose specific requirements as to the description of compliance with the condition of participation in the proceedings with respect to the condition regarding economic viability. The condition with regard to financial standing will be met if the Contractor demonstrates that it has the financial means or credit standing not less than: 12PLN 0, 000 (in words: one hundred and twenty thousand zlotys). If in the documents submitted to confirm compliance with the conditions for participation in the proceedings any values are given in a foreign currency, the Employer will convert the value of the currency into zlotys according to the average exchange rate of the National Bank of Poland from the date of submitting the contract notice to the Official Journal of the European Union. 2.The assessment of compliance with the condition will be madeie according to the formula "meets" / "does not meet" based on the information contained in the EAT, then confirmed in the documents or statements submitted by the Contractor, whose tender will be highest rated. 3. Documents confirming the condition (submitted on request from Article 26 (1) of the PZP) are information from the bank or cooperative savings and credit union confirming the amount offinancial requirements or the creditworthiness of the Contractor, in a period not earlier than 1 month before the deadline for submission of tenders or requests to participate in the procedure. If, for a justified reason, the Contractor cannot submit documents regarding the financial or economic situation required by the Employer, he may submit another document that sufficiently confirmsfulfilling the condition of participation in the proceedings described by the Employer. 4. To confirm compliance with the condition of participation in the procedure, the contractor may rely on the financial or economic situation of other entities, regardless of the legal nature of its relations with them. In such a situation, the Contractor must prove to the Employer that in carrying out the contract he will have the necessaryresources of these entities, in particular presenting the commitment of these entities to provide him with the necessary resources at the disposal of the contract. The contracting authority assesses whether the technical or professional capacity made available to the contractor by other entities allows the contractor to demonstrate compliance with the conditions for participation in the procedure and examines whether there are towards this entity pexclusion grounds referred to in art. 24 section 1 items 13-22 and section 5 points 1-2 and 4-8 of the PPL Act. If the Contractor, demonstrating compliance with the conditions referred to in art. 22 paragraph 1b PZP, consists of the resources of other entities on the principles set out in art. 22a paragraph 1 PZP, is obliged to submit along with the offer: 1) third party's statement on meeting the conditions for participation in the proceedings (in terms ofunk, in relation to which it discloses its potential) and no grounds for exclusion submitted on the EAT form. EAT of a third party should be submitted under pain of nullity, in electronic form, accompanied by a qualified electronic signature. Wykthe contractor entered in the official list of approved Contractors or the Contractor certified by certification bodies meeting the requirements of European certification standards may submit a certificate of entry into the official list issued by the competent authority or a certificate issued by the relevant certification body of the country in which the Contractor has its registered office or place of residence, indicating to docparts constituting the basis for entry or certification, in place of the relevant documents listed in the ToR. 1. The Awarding Entity does not provide for the possibility of awarding contracts referred to in art. 67 section 1 point 6 PZP 2. Pursuant to art. 29 paragraph 3a of the PZP Act, the Employer requires that the Contractor or Subcontractor in the implementation of the Subject of the Contract employ under a contract of employmentę construction workers performing civil engineering construction works in the scope of reconstruction of the central water reservoir under the supervision of the Construction Manager or the Works Manager performing works in the manner specified in art. 22 -1 of the Act of 26 June 1974 - Labor Code. The above requirement does not apply to works carried out personally by persons conducting sole proprietorshipor associates of partnerships conducting business in person. 3. If the Contractor has its registered office or place of residence outside the territory of the Republic of Poland instead of the documents: 1) referred to in item 7.1. point d), e) and f) of the ToR shall submit a document or documents issued in the country in which it has its registered office or place of residence, confirming respectively that: (a) its liquidation has not been opened andhas not been declared bankrupt, (b) it is not in arrears with taxes, fees, social security or health insurance contributions, or that it has entered into an agreement with the competent authority regarding the repayment of these claims together with any interest or fines, in particular it has obtained exemption provided for by law, deferment or spreading overdue payments into installments or withholding all decisionsand competent authority. 2) referred to in item 7.1. point g) ToR submits information from the relevant register or, in the absence of such a register, another equivalent document issued by the competent judicial or administrative authority of the country in which the Contractor has its registered office or place of residence or domicile, the person to whom the information or document relates in art. 24 ust. 1, items 13, 14 and 21 of the PZP and in art. 24 paragraph 5 points 5 and 6 of the PZP. 4. Documents referred to above in point 3 point 1 lit. (a) and in item 3 point 2) should be issued not earlier than 6 months before the deadline for submission of tenders. Documents referred to above in point 3 (1) (a) (b) should be issued not earlier than 3 months before the offer submission deadline. 5. If in methe place of residence of the person or country in which the Contractor has its registered office or place of residence, the documents referred to in point 3 are not issued, they are replaced by a document containing the Contractor's statement, indicating the person or persons authorized to represent him or the statement of the person whose the document was to be submitted to a notary or judicial authority, admincontractor or a professional or economic self-government body competent for the seat or place of residence of the Contractor or the place of residence of that person. The provisions of point 4 shall apply accordingly. 6. The Contractor having its registered office in the territory of the Republic of Poland, in relation to a person residing outside the territory of the Republic of Poland to which the document relatesthe SIWZ indicated in point 7.1) submits the document referred to in point 3 (2) to the extent specified in art. 24 paragraph 1 point 14 and 21 of the PZP and art. 24 paragraph 5 item 6 of the PZP. If, in the country in which the person to whom the document was to reside, does not appear such documents, it is replaced by a document containing the person's declaration made before a notary public or before a court authorityadministrative or economic self-government body competent for the place of residence of that person. The provisions of item 4 shall apply accordingly. 7. The contractor will be required to insure the contract for an amount corresponding to at least the value of gross remuneration and to have third party liability insurance in the scope of activities constituting Psubject of the Agreement for a guarantee sum of at least PLN 200, 000. Internet address (URL): www.gromnik.krakow.lasy.gov.pl
The bid deadline for Contract notice: Works for complete or part construction and civil engineering work was 06 Dec 2019. Bidding is closed.
This tender has been issued by SKARB PA?STWA - PA?STWOWE GOSPODARSTWO LE?NE LASY PA?STWOWE NADLE?NICTWO GROMNIK in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45200000 - Works for complete or part construction and civil engineering work, 45240000 - Construction work for water projects, 45244000 - Marine construction works, 45247220 - Weir construction work, 45247230 - Dyke construction work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 37720290. The purchaser document reference is 521465-2019.