Contract notice: Works for complete or part Tender - 25699286
Tender notice from Hungary, published on 09 Aug 2018.
Executive Summary
The NFP NEMZETI FEJLESZTÉSI PROGRAMIRODA NONPROFIT KORLÁTOLT FELEL?SSÉG? TÁRSASÁG has issued a Tender notice for the procurement of a Contract notice: Works for complete or part construction and civil engineering work in the Hungary. This Tender notice was published on 09 Aug 2018 and is scheduled to close on 21 Sep 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 25699286, while the tender notice number is 346258-2018 and Register on the platform.
Key facts
Summary
Contract notice: Works for complete or part construction and civil engineering work
Object of the contract Works for complete or part construction and civil engineering work Description: Contract notice: Works for complete or part construction and civil engineering work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45200000, 45200000, 45231110, 45232142, 45200000, 45231110, 45232142 CPV Description: Works for complete or part construction and civil engineering work Pipelaying construction work Heat-transfer station construction work Szeged geothermal thermal insulation KEHOP-5.3.2-17-2017 Reference Number: EKR000481832018 , , In the framework of the authoritative framework Szeged geothermal thermoregulation in 4 varosres " Main Site: 6724 Szeged, 11643/33. hrsz Szeged, Technical-specific thermal test geotermic thermocouple KEHOP-5.3.2-17-2017-00004 The epithetic task: In the most important elements and quantities of the most important components and quantities of the following: - Kutfuras Pannon Sandstone - 1 geothermal production angle 2 000 m up to the qualitative level - 2 geothermal reversing angles, which are the same for the production kernel with 1 800 m- Designated technical design of the production booths: Pallet: - 0.0 to 50.0 m 508/488 mm A- 55 material grade steel pipes - 0.0 to 700.0 m 339.7 / 320.4 mm 13 3/8 "J-55 am steel tube 600.0 to 1700.0 m 244.5 / 226.6mm 9 5/8 "J-55 am steel tube 1650.0-2000.0 m 139.7 / 125.7 mm 5 1/2" J-55 am. steel pipes Filtered: - 1750-1950 m tester 50 m with prefiltered filter filter lengths Johnson type filter The 508/488 mm, 13 3/8 "and 9 5/8" steel tubes in full length, with the full exclusion of the comets in the sheets.Technical Specification: Pallet: - 0.0 - 50.0 m 508/488 mm A-55 material grade steel tube 0.0 to 700.0 m 339.7 / 320.4 mm 13 3/8 " J-55 am stainless steel 600.0 to 1550.0 m 244.5 / 226.6 mm 9 5/8 "J-55 am. steel tube 1500.0 - 1800.0 m 139.7 / 125.7 mm 5 1/2 "J-55 am steel tube Filtered: - 1600-1750 m test tube 50 m with pre- -typusu szű- The 508/488 mm, 13 3/8 "and 9 5/8" steel tubes are fully coated with a total length in the full exclusion of the wire mesh communication. - Mepepites - Insulated conductor system, all - from the "primer" of thermal springs - from the "primer" cooled thermal water systems system - from the "secondary" springs - from the technological "eldobo" wiring system - optical wires fektet- DN200 / 315 pre-insulated steel pipe DIN2458 / DIN1626 DIN8074 / 75 and CEN Purecon pipes under epithelium foelding - 3 785 fm, with holes and tubes, with chamfered chamfered joints, piping signal system according to plan - KA-PVC 63x1, 9mm drain tube optical fiber cable, track, foeld- D160 SDR17.6 PE100 P10 KPE pipes under foelding light 1 1 805 fm, driven by welding or electrofusion 3 200 fm - D250x22, 7 PE100 SDR11 PN16 KPE piping epitese under foeld- 245 fm, with wire mesh, welded or electrofusion test - Prefabricated concrete with shaft cover (Optical cable claw shaft) 34pcs - El2 pieces - High-pitched - Epithe of the bases of the furoservice - Constructed gephas epitese - 1 producer of pellets with 92.4 m2 of basic fuel - 1 reversing gephas with 20 m2 of basic fuel - Gepeszet - Establishment of heating gauze on heating coefficient high-capacity heat exchanger, primary side volume control, secondary side 0, 4 / 1, 9 kV - 0, 4 kV for high consumption - high consumption of boilers - 0, 4 / 1, 9 kV - transformer installation - analogue joints, fixing, switching, moving motors, installing, installing -SCADA software installation and software installation, 170 I / O point - installation of optical fiber network 3200 fm Design, implementation and installation plans. In the event of an accident, the permission to modify the permissions and the possible removal of any design work is possible. Probauezem: 1 week continuous course, which also takes up and down A) Kizaro Reasons: You may not be a time-consuming (AT), sub-contracted, and you can not take the appropriate (sub) right to be the owner of the bidding. Section 46 (1) - Subsection (1), points (a) and (b) of Article 62 (1) to (2) apply to the exclusion of the excluded reasons (koezoes) AT (s), and, optionally, verifiable buyer s(EEKD) is provisionally provisionally justified by the following: The Kbt.67 - (1) based on AT - if applicable, a verifiable organization - is currently investigating the statement contained in the EEKD in the case of non-payment of exclusionary grounds, with the right of a person with a reasonable authority to report the case of a 321/2015 (X.30.) Government Decree (Cr.) II. . In the case of a Koezoes timeout, all ATs must be submitted to the form. The EEKD shall be enclosed by the bases of Chapters 4 and 5, 6 and 7, respectively. ) Art. iranado. In the context of the subprojects that do not take away from alk. as stated in Section 65 para. (4). base AT must be able to traindeclares that he / she does not apply for the Kbt.62- (1) - (2). (4) - (6) of the Kbt. based on the Appointed AT, in accordance with -- 8, 10, 12 to 16, h. does not fall within the scope of the exclusionary reasons. In the case of a case file in progress, AT is bound to attach a copy of the bill of intent to the cogbirosag and an(the statement of the negative content statement is also pleasing). In the justification of the exclusionary reasons we draw attention to 321/2015. (X. 30.) Section 1 para. (7) - Professional Workers vegzesere vonatkozko alk. The following is foreseen in the preliminary statement of EEKD: - Section Kbt.67 (1) - (3) and Section Kr.1 (1). and Section 2 (5) accordingly - the CA acceptsthe owner (AT, AT, and AT, capacity organization) is a simple statement that EEKD is sufficient for IV. resection point α. The submission of these documents is excluded by the express mention of the CA concerned by the provisional proxy. Article 69 (4) NY.1.) -NY.2.) AK is the name of the company in the register. Section 69 (11)it is controlled by the lactations. In the register, if there is no modal excerpt from the register extract from the register of the Kbt. Section 59. (11), the verifiable document issued by the Registry Body or the Documentary Attestation Document in simple crumbs, with a sigh of reliefto prove it. Verification of the Kbt. Section 65 (7), (9) and 69 (11). I'm afraid of it. NY.1.) It is unsuccessful for the guarantor of the epitomous industry, if the Etv., and in the case of non-Hungarian registered operators, in the register of the resident country(cf. Article 65 para. (1) (c) and 322/2015), or (b) it is not (provided that the right of the sovereign country is a libre) or by a license, (X.30.) Korm. - 21 (1)). NY.2.) AT is unsuitable if, according to its planning service related to the epithet berth, and in the case of non-Hungarian economic operators, there is no public register in the country of establishment (it is assumed that the right of the sovereign country is a prerogative) or by a concession, right or organizational or chambers of membership in the sovereign country (cf. Section 65 - 1 (c)) and 322/2015 (X.30.) Korm. - 1. - The adhato points have been reversed in the case of points of view, in the order of 0.00 to 10.00 points. Ert. mod: 1. Ar: translated art, 2.1, 2.2. straight gold, 2.3. straight art is a relatively straightforward method. 2.Article 557 (2). in accordance with the terms of the contract. 3.Time must include: - Kbt.66.-(5) par. where appropriate, in the name of the body which is eligible to receive a copy of the certificate, in the name of the competent body of the body, if any, and in the case of a legally validated document reserved power of attorneyedeti v masolati peldanya - AT is the original, expressed in -6.6 - (2), of the Kbt.66 - 6. (also with negative content) - arrow. Section 65 (7) of the Kbt. (see also in the doc.) for the person skilled in the art, with respect to the base (including the negative content) of the present invention. 4.AK in - 30, para. timesit will raise AT attention, (3) of the Code of Criminal Procedure. 5. The deadline for submitting the dossiers submitted in time - in the case of Section 46 (--7 (3) 6) You must state in the time that you are a member of the chamber who is involved in the award of the winner's winner, M.2.1-3)he will have access to the records to the author of the contract. The cancellation of the registration process is considered to be incomplete by the AT contracting authority (see --31, - 4, para.), In which case the CA, if it has been promulgated, will test the contract with the second most favorable time. 6) para. if the Hianypotlass does not have AT at any given timeit will involve a large number of players in the market, and will give you the chance to get the chance to do so. 200millioFt / ev and 50millio Ft / kare. the copyrighted authors of epitesi-szerelesi fel.biz are hereby authorized to submit a legal guarantee of up to EUR 50 million and a minimum of 10 million EUR /When the time is reached, AK will take the AT statement to the extent that it will have the responsibility for the aforementioned dictatorship. AK in the case of point IV.2.6 under 60 days under 2h. 10.FAKSZ: Gergő Bokor (00220) 11.AK apply the Kbt.75 (2) item (s)) to all rescheduling dates 12.AK holds a local beak, the date of the documentary contents. 13.AK given the fact that the present case has been disclosed to the complainant, see -55 (6). (AK), and the CA is obliged to submit a written notice to the Contracting Authority (TSZ), and a modification is also required by the Explanatory Note to Section 135 (12). In view of this, the present justification for this- if the Parties have provided the Contractor with their surplus cash, - on the day on which the contract is covered by the Contract, or if relevant for the TSZ modositas, or on the date of acceptance of the so you can use the Penzuegee collateral for the contractor's performance. 14.the EDFin the case of electronic declarations against the declarations made by us, and in the case of elect. with the declarations made. otherwise the prescriptions 424/2017. (XII.19.) Kr.10-13.--i holds. 15.EKR use e-Kr.6.- the Sign-szuekseges. Continued VI) 4.3. point Internet address (URL): http://www.nfp.hu
The bid deadline for Contract notice: Works for complete or part construction and civil engineering work was 21 Sep 2018. Bidding is closed.
This tender has been issued by NFP NEMZETI FEJLESZTÉSI PROGRAMIRODA NONPROFIT KORLÁTOLT FELEL?SSÉG? TÁRSASÁG in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45200000 - Works for complete or part construction and civil engineering work, 45231110 - Pipelaying construction work, 45232142 - Heat-transfer station construction work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 25699286. The purchaser document reference is 346258-2018.