Contract notice: Works for complete or part Tender - 22150172

Tender notice from Bulgaria, published on 04 Apr 2018.

Executive Summary

The „??? ????????“ ??? has issued a Tender notice for the procurement of a Contract notice: Works for complete or part construction and civil engineering work in the Bulgaria. This Tender notice was published on 04 Apr 2018 and is scheduled to close on 28 May 2018, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 22150172, while the tender notice number is 145479-2018 and Register on the platform.

Key facts

Summary
Contract notice: Works for complete or part construction and civil engineering work
TOT Ref. No.
22150172
Document Ref. No.
145479-2018
Country
Bulgaria
Notice type
Tender
Competition
ICB
Publication date
04 Apr 2018
Bid deadline
28 May 2018
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Works for complete or part construction and civil engineering work
Description: Contract notice: Works for complete or part construction and civil engineering work
Authority Type: Utilities entity
Contact Nature: Works
Procedure: Negotiated procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45200000, 45200000, 45200000
CPV Description: Construction of a new Accident Management Center on the territory of Kozloduy
Reference Number: SD № 37396
Construction of a new Accident Management Center on the territory of the town of Kozloduy
Main Site: Kozloduy
Construction of a new Accident Management Center on the territory of Kozloduy town
Need to be fulfilledthe following types of earthworks:
- removal of machine humus up to 30 cm thick,
- loading of soil on a truck,
- bulldozer excavation on earth or trench excavation 40-100 m under normal conditions,
- load of soil on a truck and transport up to 10 km
With regard to "road and street pavements, sidewalks and landscaping" must be carried out:
- removal of stone and• Concrete curbs, including their cleaning, • Delivery and application of: visible concrete curbs 18/35, concrete strips 10/20 (concealed curbs), non-reinforced concrete class B7.5 for foundations, foundations and pavements, stone, draining sand layer with a thickness of sand layer 5 cm thick
After concrete flooring: delivery and laying of base from wedge crushed stone(bituminous stone flooring), bituminous ground with crushed stone, asphalt concrete - an incoherent mixture for the lower layer, and asphalt concrete - a dense mixture for the upper layer
The building has to be divided into two parts without an internal connection between them:
- underground level, to accommodate all premises and important means of communication providing the necessary working conditions for the Leadership and on-duty GroupEmergency team in the early phase of a possible nuclear accident - above ground level - accessible for wide public use, in order to further clarify aspects of ensuring the safe operation of Kozloduy NPP, promoting clean nuclear energy and its future in Bulgaria.
The construction of the underground level should be reinforced concrete without beam, bearing external reinforced concrete wallsand a thickness of 40 cm, columns, washers and a 30 cm thick attic. The internal partition walls are made of aerated concrete blocks 20 cm thick. Part of the partition walls separating zone "C" and the emergency staircases are made of reinforced concrete - 20 cm .
The supporting structure of the two-storey building should be filled with reinforced concrete columns, washers and beamless slabs, and on the one-storey part - reinforced concreteThe following types of construction and assembly and finishing works are required: masonry, dry construction, flooring and plastering, facing work, painting work, thermal insulation works, roofing works, facades, joinery, joinery interior, exterior doors, windows and windows.
The new Accident Management Center building is necessary to:building a heating system, air conditioning system, ventilation system, separate sewerage system, drinking water supply, installing a distribution system for electricity supply, building a distribution system to ensure radio coverage in all premises of the building, delivery of the Internet to be realized through optical connectivity to the 2 suppliers, to justifya storage facility to duplicate the existing one on the Kozloduy NPP site
There is also need to build: - a command point and the integration into the local Kozloduy NPP early warning and notification system, and the 12-kilometer zone, - TETRA system dispatching workstation, - NCPOS control node for launch of messages-
a satellite communication system providing a back-up communication link; in the conference room P2, at a height of -4.65 m is installed a satellite system model Explorer 710, - workstations for monitoring of the access control system, CCTV system, perimeter guard systems,
- server, workstations and tracks for critical control system data(SPCs) and Indicator of Safety Parameters (SPPs) - (SPDS and PAMS) of 5 and 6 AEBs ... ... continues in Section VI.3. For the execution of the construction and installation works the applicant must be registered in the Central Professional Register of the builder for construction III group I. Category
The circumstance is certified in Part IV, section A, item 1 of EEDOP, indicating information about the entryof the applicant in the relevant professional register in the Member State in which he is established, indicating whether the relevant documents are available in electronic format as well as the web address, authority or service issuing the registration document. In the case under Art. 67, para. 6 of the PPA, the requirement shall be proved, as the participant submits a certificate for entry in the TSRP. In case the participant is unitedwe, which is not a legal person, the requirement applies to the person in the consortium who will carry out the construction and assembly works. For the repair (bridging) of steam and hot water pipelines, it is necessary for the applicant to be entered in the register under Art. 36 of the Technical Requirements to Products Act (LTIP) as a person performing maintenance, repairs and reconstruction of equipmentThe circumstance is certified in Part IV, Section A, paragraph 1, of EEDOP, indicating information on the applicant's entry into the relevant professional register in the Member State in which he is established, indicating whether the relevant documents are available in electronic format as well as web address, authority or service issuing the registration document.
In the case of Art. 67, para. 6 of the PPA the requirement shall be proved, as the participant shall submit a certificate for entry in the register under Art. 36 of the LTIP. If the participant is a grouping that is not a legal person, the requirement applies to the person in the grouping who will carry out the activities on the high-risk facilities ..
Not required. Applications received will open at a public hearing on 30 May 2018 from 10.00h. in the Commercial Department of Kozloduy NPP, where the candidates or their authorized representatives, as well as the mass media, may be present. Abbreviations used:
Construction works - Construction and assembly works - KCS - Quantitative and cost accounts - FUP - Start-up works - The estimated value of the envisaged construction works includes 10% unforeseen costs. Specifyo Other percentage of unforeseen costs will be the reason for removal of the respective offer .. ... extension of item II.2.4 - a workstation for computer programs for accident forecasting and protective measures integrated with the NRA emergency center, - local radio system ensuring quality and reliable disclosure on the territory of the newly designed building of the Accident Management Center, -videoconference system,
- information provided by the Central Intelligence Unit - ... continuation of item III.1.7 - Delivery is paid as follows:
- 60% of the value of the respective equipment in a staggered way by bank transfer within 30 calendar days days of acceptance of the delivery against a submitted delivery protocol, a record of the total entry control without remarks and an original invoice,
30-% of the value of the respective equipment staggered by bank transfer within 30 calendar days on the basis of completed and accepted works after submission of protocol for successful 72-hour tests for the respective equipment / act for successful functional tests and original invoice
the installation works are paid as follows:
- 90% of the cost of the construction works in stages through theup to 30 calendar days on the basis of completed and accepted works after submission of protocol for establishment of natural types of construction works and their payment and original invoice
90% of the cost of unexpected expenses (if any) by bank transfer within the term up to 30 calendar days on the basis of completed and accepted works after submission of the established statement of findings, protocol of establishment- Final payment for delivery and construction works - 10% of the value of the signed protocols for the establishment of natural types of construction works and documents for payment of the equipment shall be paid after the final execution of all the activities under the contract, including the transmission of the writ of execution, against the presentation of a findingto establish the capacity for acceptance of the construction, as per Ordinance No. 3 of 31 July 2003, for the preparation of acts and protocols during construction and a protocol for the finalization of the activities under the contract, in accordance with Ordinance No 3 of 31 July 2003.
Costing of unforeseen costs for construction works are provided in the quantitative accounts, is carried out according to the price indicators of this contractthe cost of the construction works is the costs related to the increase of the set amount of construction works and / or the addition of new types and quantities of construction works that could not have been foreseen before the conclusion of the contract. Unforeseen works are assigned to be executed after they have been approved in advance by the contracting authority and a memorandum of findings established by the contracting authority is prepared.after the conclusion of this contract, the contracting authority shall record in the order book of the site the need for the execution of the additional quantities / types of construction works.
The working draft was submitted to the interested parties in an electronic version of the buyer profile as part of the documentation for participation in the procedure
Internet address (URL): http://www.kznpp.org
Directive: Classical Directive (2014/25/EU)

Documents

Tender Notice
Login to view

Similar tenders

Bulgaria Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Works for complete or part construction and civil engineering work was 28 May 2018. Bidding is closed.

This tender has been issued by „??? ????????“ ??? in Bulgaria.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45200000 - Works for complete or part construction and civil engineering work.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 22150172. The purchaser document reference is 145479-2018.