Contract notice: Woodworking equipment Tender in Hungary - 14810152
Tender notice from Hungary, published on 13 Jul 2017.
Executive Summary
The PENDLI ISTVÁN ATTILA EGYÉNI VÁLLALKOZÓ has issued a Tender notice for the procurement of a Contract notice: Woodworking equipment in the Hungary. This Tender notice was published on 13 Jul 2017 and is scheduled to close on 18 Aug 2017, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 14810152, while the tender notice number is 269698-2017 and Register on the platform.
Object of the contract Woodworking equipment Description: Contract notice: Woodworking equipment Authority Type: Other Contact Nature: Supplies Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 43810000, 43810000, 43810000 CPV Description: Woodworking equipment. One piece of wood-based woodcutter specialists on the basis of the contractor's contract basis under the project GINOP 1.2.1-16-2017-00403. Adasveteli szerződes 1 piece of oil painters specialty equipment manufacturer of GINOP 1.2.1-16-2017 -00403 project. Main Site: 8796 Tuerje, Hr.: 3912. Adasveteli authordes 1 pieces oenjaro faapritek gyarto berendezes bes• The winner is responsible for the installation of the equipment on the premises of the Service Provider, the delivery of the equipment in a quarter, and the maintenance of the operator's eye as described below. : 2 people / 8 hours for 1 day crossing. The date is 321/2015. (X.30.) Government Decree 46 - (3)The main test conditions for the Geppa are: The apritogep has a minimum width of 130 cm, its minimum height is 90 cm, its baffle with a horizontal cylinder, driven and driven by an oil engine, with a total length of at least 250 cm. The aprito drum has a minimum of 14 apritokes. Kifujo tube has a minimum of 280 mm. Daru-With a minimum lifting force of 10 meters, a lifting force of at least 80 kNm (about 750 kg, 10 meters, 210 bar), an extension wedge, hydraulic glove with a minimum width of 3.8 m up to a width of at least 500 mm Engine pressures of at least 1 800 Nm (1000 revolutions per minute and 1950 rpm in crankshaft). Hydraulic pump is the craneWith a minimum of 200 bar of pressure and a minimum of 320 liters per minute. The pre-paid grip must have the prescribed operating instructions. - The operating instructions must include the following: transport, handling, storage, putting into use, use, maintenance, uezemen kivuel - The control elements are safe with acadytes - The engine can not start moving with the engine. - - The engine can not start moving with the engine. At the same time. - The grip should be equipped with a safety knob. - Provide the speed adjuster and jigsaw - Have a trailer with trailer, trailer and trailed trailer with towed gears - The engine must be equipped with a grounding plate that is suitable for working on the working ground, as well as on the hydraulic and pneumatic system, The operator controls can only be manipulated from a cargo handling unit. THEThe control unit must be provided with a key switch to allow the driver to switched on and off. - The control panel must be equipped with a control panel. - The treadmill operator must be equipped with a handle for machine tools and workstand movements. Against the unintentional movers, a protruding push-button is pressed. The control elements can be locked in the unintentional-- - The grip of the grip is at a speed of up to 10 km / h. - The pedestrian crossing of the workpiece, as well as the manhole and the seat should be folded. A wooden technical april is included in the documentation. This is the same time for the proper time schedule-It is only possible to refer to the "minimalist technical parameters" of the co-procurement documents as a "one-off or better" term in the context of the co-procurement documents In the technical campThe minimum requirements for a single text are set forth in the list, and the articles of the time-table may include products with more favorable features. The proof of the one-way sponsorship is the responsibility of the runner. - In the jury, you are not eligible, you are not allowed to enter into a valid case, (1) (2) of Section 62 para. (2) of the Code of Civil Procedure shall be validated in the case law of the Contracting Party as well as for the exclusionary reasons and the limitations of the technical lease of the co-contracting. (X.30.) Korm. ("Government decree"), it is obligatory to make a declaration that it does not belong to the personThe causes of extreme causes, as well as the Kbt. Section 62 (1) (k), point (k) shall be certified in accordance with Section 8 (i) (ib) of Section 10 of the Government Decree and Section 10 (g) (gb). (I) (ib) and Section 10 (g) (gb) of the Kbt. Article 62 (1) (k) (k) (a) (d)-Whether it is classified as a capital market that is not listed on a regulated stock exchange or is traded on a regulated stock exchange; If the prospectus or reseller is not listed on a regulated stock exchange, then the pre-financing and the prevention of the financing of terrorism and terrorism in 2007 will be CXVI. Toerveny (hereinafter referred to as "penzmosasrol szolo toerveny") Article 3 (r) (r) -rb) vRc) -rd) of subsection (a) of the brain, all prominent owners are entitled to present and declare a statement containing an explanatory statement; If the economic operator does not have the beneficial owner under - 3 (r) -rb) or rc) -rd) of paragraph 1 of this Article, make a declaration to this effect as an extension of the exclusion.The appropriate provider of a suitable declaration of conformity and the capacity building organization must submit a one-week European Dealership Document, a timely update of the terms of reference without prejudice to any other documents listed in this notice. Proof of documents and declarations according to item III.1.1-1.3It is not timely, but is not prohibited. (4) of Section 67 para., The Applicant must declare that the Contractor does not apply for the Contractor's Contractor. (1) and (2) of Section 62 of the Constitution. The statement should also be made if the name of the subprojects known in the art is not disclosed in the list.(Justifications) were more rigorous with the criteria for qualifying timescales, but in 321/2015. (X. 30.) on the basis of all the exclusions justified by the official list of certified accountants, the justifications of the exclusion are justified by the proviso.(S) must submit a statement (s) no later than the day before the deadline. (1) of the Constitution, the applicant shall submit the declaration contained in the one-off European Case Documentation Document, in accordance with the applicable requirements of the applicable law. Promotion Date 321/2015. (X. 30.) Government Decree 2.-(5), accepts a simple statement by the distinguished economic operator as a provisional statement of the suitability test, which is sufficient to satisfy the requirements set out in Annex IV of the Single European Covenant Document. The "alpha" section of the alpha section ("the subtle sign of the" oesszes "criterion aspect").Please refer to the appropriate test methods. Subject to Section 69 (4) and (6). P / 1. Date Added by 321/2015. (1) (c) of the Decree (X.30.) Of the Government of the Republic of Hungary on the basis of the contractual deadline for the last 3 secsIn the case of a low-cost employee, he or she is informed about the time when he or she started writing and when he or she started doing business when these data are available. (X. 30.) Government Decree - 19 (3). Also known as the first one. 1) Article 53 (6) of the ConstitutionHe is doing a crap. To offer a free-to-air support to the tenderer in the framework of the Tender for Supply Charges. If you do not want to receive a donation, you will not be accepted or will accept the least amount of acceptance you need to consider as a test item that will allow you to retire. The adasveteli szeSo you do not want to go to the whirlpool. 2) The data provided in the Kuelfoeld pennies are updated on a daily basis by the present user, TED, on a day-to-day basis on the MNB website.In the course of an evolution course at HUF. (3) The date (hereinafter referred to as "A") and its breasts in a piece of paper, 1 piece of paper base and 1 piece of paper in an electronic, password-readable medium (CD / DVD) ), Can not be edited, or must be submitted in pdf formatpackage height. If the electr. And the paper is based on the originals of the original cartridge, or the electr. Some of the content can not be read, so the repository (hereinafter referred to as AK) considers the original content of the paper as irrevocable. The base of the paper and the electr. (4) In AT, in A, an arrow must be declared in AMust be procured. 65 (7) and 66 (2), (4) and (6) (a) to (b). (The negative content statement must also be attached!) The declaration under Section 66 (2) must be filed in the original filing date. 5) If this is the case, please refer to the Kbt. In accordance with Section 71, Section 71 (6) applies the limitation measure applied by new economic operators(6) The KD may be submitted without delay to the deadline specified by the KD in accordance with the provisions of Section 57 para. (2) of the Kbt. The document is the lowest one given by a time-consuming or named sub-contractor.) 7)P-european (CET) time-limited. 8) CA does not apply the Kb. 10) AT EEKD provide support to the subprojects that are known at the time of submitting the application. 11) The CA will provide you with the periodic cashier's notice Does not incur. 12) The sort of elements of the A-points according to the aspect of the elementsAnd the upper position of the adhato point is as follows: 1-10. In the case of the 1st, the higher values are better: Pvizsgalt = (Avgusted Most Favored) / (Most Favorable Most Favored) x (Pmax Pmin) Pmin. In the case of the 2nd and 3rd (local security service and pre-purchased arithmetic) points, the Koezbeszerzesi Hatosag won the winner(EC 2016, 147, 21 December 2016), paragraph VI of the Code of Conduct for the Selection of Qualifications. A), according to the rules of the auctioned gold as per paragraph 1.b). Section 76 (9) (D) of Section 76 (10) of this Act, subject to the contents of the document. 13) The Provider of the Penzuegyes and the Economic, -As well as the technical and professional qualifications and the certification of the qualification criteria for the qualified applicants, in the following aspects: P.1) and M.1) -M.2) 14) FAKSZ: Mikl-s Verebelyi, registered: 00517th Internet address (URL): http://www.pendli.hu Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Woodworking equipment was 18 Aug 2017. Bidding is closed.
This tender has been issued by PENDLI ISTVÁN ATTILA EGYÉNI VÁLLALKOZÓ in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 43810000 - Woodworking equipment.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 14810152. The purchaser document reference is 269698-2017.