Tender notice from Poland, published on 17 Jan 2020.
Exeutive Summary
The ZARZ?D DRÓG WOJEWÓDZKICH W LUBLINIE has issued a Tender notice for the procurement of a Contract notice: Winter-maintenance vehicles in the Poland. This Tender notice was published on 17 Jan 2020 and is scheduled to close on 19 Feb 2020, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 39771533, while the tender notice number is 023286-2020 and Register on the platform.
Object of the contract Winter-maintenance vehicles Description: Contract notice: Winter-maintenance vehicles Authority Type: Other Contact Nature: Supplies Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 34143000, 34144400, 34144440, 43313100, 16310000, 34143000, 34144400, 34144440, 43313100, 16310000 CPV Description: Winter-maintenance vehicles. Road-maintenance vehicles. Gritter vehicles. Snowploughs. Mowers. Delivery of a set: carrier and equipment for winter and summer maintenance of voivodship road No. 812 administered by the Voivodship Road Administration in Lublin Reference Number: DZU. 372.8.2020.dk 1. The subject of the order is: delivery of a set: carrier and equipment for winter and summer road maintenance of a voivodeZka No. 812 administered by the Board of the Voivodship Roads in Lublin. Main Site: Voivodship Road No. 812 1. As part of the delivery, the Contractor shall deliver to the place of delivery a carrier with installed summer buildings and in this respect should train employees operating the set at the place of delivery, i.e. in the Wojewodzkie Road District in Włodawa, ul. Lubelska 60, 22-200 Włodawa, POLAND. The customer will indicate the termin employee training by email. Winter equipment will be delivered separately with the supplied summer carrier. Replacement of summer buildings with winter buildings will require a separate training of employees operating the set within the time limit indicated by e-mail by the Employer. 2. The contractor is obliged to mark the documents and related materialss with the implementation of the project in accordance with the guidelines of the project program 3. In accordance with art. 30 paragraph 4 of the Act, the Employer allows equivalent solutions to those described. The Contractor who refers to the equivalent solutions described by the Employer is required to demonstrate that the offered delivery meets the requirements specified by the Employer (Article 30, paragraph 5 of the Act). I will be recognized as an equivalent solutionoffer for the delivery of a set having at least the same features, standards and technical parameters, functional and other at a level at least as described in the order documentation. Therefore, it is allowed to offer in the offer equivalent equivalents with properties not inferior and guaranteeing the achievement of parameters not lower than those required by the Employer. Parameters indicatedabout the standard are defined by the minimum technical, operational, operational, quality and functional conditions to be met by the subject of the order. or standards, the Employer allows methods, materials, devices, systems, technologies, products, etc. equivalent to those described in the description of the subject of the contract. Therefore, it is allowed to offer in the offer equivalent equivalents with properties not inferior and guaranteeing the achievement of parameters not lower than those required by the Employer. The parameters of the indicated standard specify the minimum technical, operational, operational, quality and functional conditionsOther, which the object of the order is to fulfill. The indicated trademarks, patents, brands or names of the manufacturer indicating the origin only specify the product class, methods, materials, devices, systems, technologies, etc. The Contractor may accept methods, materials, devices, systems, technologies, etc. of other brands and manufacturers, but with technical, quality and property parametersutility and functional parts corresponding to the methods, materials, devices, systems, technologies etc. described in the order documentation. In addition, the Employer emphasizes that equivalent methods, materials, devices, systems, technologies, etc. cannot be substitutes for the methods, materials, devices, systems, technologies, etc. described in OPZ, but must guarantee that they meetThe requirements of the Employer defined therein. 4 .. Warranty requirements for the carrier and accessories: - minimum period of quality guarantee for the offered carrier of accessories and working devices (accessories): 12 months, - guarantee for the carrier without the kilometer limit, - the warranty excludes consumables, - having an authorized service center in Poland onspecial devices. 5. Warranty or assistance service within 24 hours of reporting on a given day at the garage. 6. Garage place: Wojewodzkie Road Region in Włodawa ul. Lubelska 60, 22-200 Włodawa, POLAND. 7. Detailed information on GDPR can be found in the order documentation. I. Conditions for participation in the procedure. 1. Contractors who pmeet the conditions regarding: 1) technical or professional capacity. 2. Minimum conditions regarding: Execution within the last 5 years before the offer submission deadline, and if the business period is shorter during this period, a minimum of 2 deliveries of a universal carrier (motor vehicle) together with accessories for winter and summer road maintenance. Each of deliveries must relate to deliveriesy carrier with accessories in one order. 3. If the Contractor relies on the abilities of other entities, the Contractor must prove to the Employer that in carrying out the contract, he will have the necessary resources of these entities, in particular, presenting the undertaking of these entities to make available to him the necessary resources for the purposes of the contract. Note: Obligation underthird litter to provide the Contractor with the necessary resources should have appropriate content from which it will follow that this entity has undertaken to make available certain resources for the period of using them when executing the order and for its effectiveness must be submitted by the person / persons authorized to representing a third party in the above scope. Commitment withplaced by an unauthorized person does not prove the third party has made the resource available (in accordance with judgment KIO2213 / 11). 4. The Awarding Entity assesses whether the technical or professional capabilities made available to the Contractor allow the Contractor to demonstrate compliance with the conditions for participation in the procedure and examines whether there are grounds for exclusion for this entity, as referred to in art. 24 paragraph 1 point 13 of 22 Public Procurement Law and in section III 1.2 point II.2 1 3 of this announcement. 5. The Employer may, at any stage of the procedure, consider that the Contractor does not have the required capabilities, if the involvement of the Contractor's technical or professional resources in other economic activities of the Contractor may have a negative impact on the performance of the contract. 8. In the case of Contractors, he jointly appliestenders for the order the conditions for participation may be met cumulatively. Note: Pursuant to the judgment of the Court No. C-387/14 of 4.5.2017 "Article 51 of Directive 2004/18 / EC of the European Parliament and of the Council of 31.3.2004 on the coordination of procedures awarding public contracts for works, supplies and services in connection with art. 2 of this Directive should be interpreted asthat he precludes the Contractor from providing the contracting authority after the deadline for submitting applications to participate in the public procurement procedure in order to demonstrate that he meets the conditions for participation in the public procurement procedure, documents that his initial offer did not contain, such as a contract for an order carried out by a third partyeci and its obligation to make available to this Contractor the capacities and means necessary for the implementation of the contract in question. " cd II. Grounds for exclusion 1. 12 23 of the Public Procurement Law 2. The Purchaser will exclude from the contract award procedure pursuant to Article 24 ( 5) of the Public Procurement LawContractor, in relation to which at least 1 of the following conditions apply: 1) in relation to which liquidation was opened, the arrangement approved by the court in the restructuring proceedings provides for satisfaction of creditors by the liquidation of its assets or the court ordered the liquidation of its assets pursuant to art. 332 paragraph 1 of the Act of 15.5.2015 Restructuring Law (Journal of Laws from 2019 item 243, 326, 912 and 1655) or whose bankruptcy was announced, with the exception of the Contractor, who after the declaration of bankruptcy has entered into an arrangement approved by a final court decision, if the arrangement does not provide for satisfaction of creditors by the liquidation of the assets of the bankrupt, unless the court ordered the liquidation of his assets pursuant to art. 366 section 1 of the Act of 28 February 2003 Bankruptcy Law (Journal of Laws of 2019item 498, 912, 1495 and 1655); 2) who has grossly violated his professional obligations, which undermines his integrity, in particular if the Contractor has failed to perform or due to gross negligence as a result of the intended action or gross negligence, which the contracting authority is able to demonstrate by means of appropriate evidence; 3) who, for reasons attributable to him, did not carry out albecause he did not properly perform a significant degree of the previous public procurement contract or concession contract concluded with the Employer, referred to in art. 3 clause 1 item 1 of 4 Public Procurement Law, which led to the termination of the contract or the award of damages. 3. In case of referring to technical or professional abilities of other entities, it is required to demonstrate the lack of grounds for exclusion from the reasondue to non-compliance by these entities of the conditions referred to in art. 24 paragraph 1 point 13 of 22 Public Procurement Law and reasons indicated in point II. 2 point 1 3 of this section. III. List of statements or documents confirming the fulfillment of the conditions for participation in the procedure and no grounds for exclusion. 1. The Contractor shall attach to the offer a valid European statement as at the date of submitting the offersego of the order document, hereinafter EAT to the extent indicated by the Ordering Party in the order documents. The information contained in the statement constitutes a preliminary confirmation that the Contractor: is not subject to exclusion and meets the conditions for participation in the proceedings. Note: The Contractor in Part IV EAT Qualification criteria may be limited to completing section α only, the Employer does not require completionany of the other sections of Part IV. 2. The Contractor, which refers to the resources of other entities, in order to demonstrate the lack of existence of grounds for exclusion and compliance with them, to the extent that it refers to their resources, the conditions for participation in the proceedings also submits uniform documents (EAT) regarding these entities. 3 . In the case of joint application for the contract by the Contractors, JEDEach of the Contractors jointly applying for the order is submitted by. These documents confirm the fulfillment of the conditions for participation in the procedure and the lack of grounds for exclusion to the extent that each of the Contractors demonstrates compliance with the conditions for participation in the procedure and no grounds for exclusion. 4. In addition to the uniform European order document, the Contractor is obliged to attach to the offersy: a) proof of payment of the bid security, b) tender (with net price and VAT), c) commitment or other documents of entities to provide the Contractor with the necessary resources at the disposal of the contract if the Contractor relies on other entities The undertaking must be submitted in the original in the form of an electronic document (document in electronic formsigned with a qualified electronic signature). I. A condition of participation in the tender is a bid bond of PLN 30, 000.00 (thirty thousand zlotys 00/100). II. Description of the criteria which the Employer will be guided in when selecting the offer, together with the weight of these criteria and the manner of evaluation of the offers. 1. Bid evaluation criteria: 1) criterion price criterion weight: 60%. Bid with the lowestThe price will receive a PC = 10 points Other offers will receive a number of points calculated according to the following formula: The price of the cheapest offer - ------------------------- --------------- x 10 = PC Price of the tested offer 2) quality criterion preparation of the support arms (front and rear) for cooperation with the following heads: for milling stumps, for roadside felling, for ditch cleaning, for trimming gweight of 40% (PD). Preparation of carrier booms (front and rear) for cooperation with heads: for trunk milling, for roadside felling, for ditch cleaning, for branch pruning will be evaluated as follows: No preparation of carrier booms (front and rear) ) for cooperation with any head 0 points Preparation of the support boom for cooperation with the head for trimming branch 1section Preparation of the support arm for cooperation with the head for trunk milling 2 points Preparation of the support arm for cooperation with the head for trench cleaning 3 points Preparation of the support arm for cooperation with the head for cutting off roadsides 4 point 2. The offer which obtains the highest total number of points calculated according to the formula: P = PC x 60% PD x 40% will be considered the most advantageous III. The procedure for the award of the contract in question was preceded by a technical dialogue. Internet address (URL): www.zdw.bip.lubelskie.pl
The bid deadline for Contract notice: Winter-maintenance vehicles was 19 Feb 2020. Bidding is closed.
This tender has been issued by ZARZ?D DRÓG WOJEWÓDZKICH W LUBLINIE in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 34143000 - Winter-maintenance vehicles, 34144400 - Road-maintenance vehicles, 34144440 - Gritter vehicles, 43313100 - Snowploughs, 16310000 - Mowers.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 39771533. The purchaser document reference is 023286-2020.
This tender falls under Materials and Products, Technology and Equipment in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.