Object of the contractWater-treatment plant construction work
Description: Contract notice: Water-treatment plant construction work
Authority Type: Utilities entity
Contact Nature: Works
Procedure: Negotiated procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45252120, 45232154, 45252120, 45232154
CPV Description: Water-treatment plant construction work.
Construction work of elevated tanks for drinking water.
Total contract concerning Solr0dgard Vandv-rk.
Solr0dgard Vandv-rk is established as a substitute for the current Stenholt Waterworks and Frederiksgade Vandv-rk. The new waterworks must be placed on an undeveloped basis. The foundation forms part of a large, coherent urban development area (Solr-dard), as it is faExtensive development will include new energy, climate and environmental parks with wastewater treatment plants, recycling stations, waterworks, climate and environmental centers, areas, etc.
This offer includes all work related to. In the case of a request for a pre-qualification, the applicant must complete the single European procurement document, ESPD (ESPD is a declaration of self-employment from the applicant as-provisional proof that applicants meet the eligibility, suitability and selection criteria.)
The ESPD form is attached for completion under Practice Qualification in Appendix TG2 (XML file).
The completed XML file is saved in pdf, printed, signed, scanned into pdf and requested to be submitted as application for prequalification.
Applicants must upload and fill the file electronically via the ESPD service pa:
https: //ec.europa.eu/growth/tools-databases/espd/filter lang = da
It is not possible to abandon the XML file from other services or programs.
Guidance in filling out ESPD:
Part II: Completed.
Part III: Completed.
Part IV: Please fill in Section B.Application of Applicants' Fair Sales in each of the last 3 completed accounts or as long as applications have been made safely, it is shorter than 3closed accounts. At the point of entry, equity has been entered in the last 3 completed accounts or said long-term applications have existed safely, it is shorter than 3 completed accounts. Safely recent accounts are less than 6 months from the deadline of the application deadline, an attachment to the ESPD must be accompanied by a declaration that no significant changes have been made to the applicant's turnoverng and equity in the interim period. The declaration must be signed by the applicant's managing director or financial director.
Part IV: Complete section C in so far as the applicant's experience from similar projects in the form of references for tasks carried out within the last 5 years from the deadline of the application deadline. The reference list must contain information about project name, wordsregistry, contract room, execution date and description of the project, including the specific services.
Part V: Not completed.
Part VI: Completed.
Supports applying to another legal entity, eg. subordinators, in compliance with minimum eligibility requirements, a separate ESPD must be attached to this other legal entity. '' Safely answering is based on anotherridiculous unit, as far as technical and professional capacity is concerned, it is a requirement that this other legal entity carry out the specific parts of the construction work.
Safely answering is based on another legal entity, insofar as economic and financial capacity it is a requirement that this other legal entity be jointly and severally liable for the performance of the contract together with the applications.
Safely ApplicantsA group of economic operators (eg consortium or joint venture) must be jointly and severally liable for the fulfillment of the contact, and one participant with whom the contracting entity may enter into binding agreements on behalf of the association. All participants must submit separately filled ESPD.
The delivery material can be downloaded at:
https: //ftp.niras.net
FTP Account / user:-JBK-02
FTP Password: tremb6bq
Questionnaire for the job qualification must be sent to Niras A / S, Att. John Brian Kristensen,
[email protected] is answered in anonymous form and uploaded to the ftp server, cf. the above link. Applicants are responsible for keeping themselves updated on the ftp server.
Exclusion reasons:
Unless requested by the contractorDocumentation of Confidentiality, cf. section 138 of the Public Procurement Act, is excluded. Applicants are entitled to exclusion from the grounds of exclusion pursuant to sections 135 and 136 of the Public Procurement Act and the optional grounds for exclusion in section 137 1 No. 1-7.
The tenderer with which the developer intends to enter into a contract will be required to document the information in the ESPD before notification of the award decision. Requirements forl the documentation appears from the tender documents
Internet address (URL): www.hillerodforsyning.dk
Directive: Classical Directive (2014/25/EU)