Executive Summary

The „?????????????? ? ??????????? — ?????“ ??? has issued a Tender notice for the procurement of a Contract notice: Water purification plant construction work in the Bulgaria. This Tender notice was published on 20 Nov 2019 and is scheduled to close on 03 Jan 2020, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 38122098, while the tender notice number is 543085-2019 and Register on the platform.

Key facts

Summary
Contract notice: Water purification plant construction work
TOT Ref. No.
38122098
Document Ref. No.
543085-2019
Country
Bulgaria
Notice type
Tender
Competition
ICB
Publication date
20 Nov 2019
Bid deadline
03 Jan 2020
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Water purification plant construction work
Description: Contract notice: Water purification plant construction work
Authority Type: Utilities entity
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45252210, 45252210, 45252210
CPV Description: Water purification plant construction work.
Construction (construction) of the site "Drinking water treatment plant for the Shumen water supply system", Shumen
The subject of this public procurement is the construction (construction) of the site "Drinking water treatment plant for the water supply system Shumen ", Shumen.
Main Site: The order will be executed on the territory of Shumen. "Divdyadovo".
1. Subject of the contract:
The subject of this public procurement is construction (construction) of the site "Drinking water treatment plant for water supply system Shumen", Shumen.
Under construction of the object "Drinking station for drinking water" Water for Shumen Water Supply System, Shumen City is understood to be the construction of:
- Drinking Water Treatment Plant (DWTP) with coverThe following operating modes are available:
- 450 l / s in normal mode;
- 600 l / s in forced mode;
- Pumping station (WWTP) for purified water;
- Discharge of process waste water (LLC) base approved working design, integral part of the draft contract,
- Cable power supply 20 kV, UPI-1, 125 square and new substation - type BCP 20 / 0.4kV / 1000 kVA.
The scope of work includes a minimum, but notis limited to the following contractor duties:
1. Construction of temporary construction and preparatory activities
2. Execution of construction works in accordance with the approved design and program for the implementation of the activities, including:
2.1. Execution of construction works in accordance with the requirements specified in the technical specification.
2.2. Delivery, installation and commissioning inoperation of process and other equipment related to water treatment and sludge treatment
2.3. All activities and processes in the required construction, structural, mechanical, electrical and more. activities as well as other "non-construction" activities such as:
2.3.1. Construction of facilities for the treatment of raw water for drinking and domestic purposes
2.3.1.1. By the water route:
2.3.1.1.1.manifold crane shafts at PSPV input:
- crane shaft at PSPV input,
- crane shaft of PSPV bypass.
2.3.1.1.2. Grating building and sieves housing the following facilities:
- measuring device at the PSPV input,
- fine grids,
- macrosites,
- reagent holding,
- mechanical mixers.
2.3.1.1.3. Filter housing with quick sand filters and flushing tank
2.3.1.1.4. The building is chlorinated.
2.3.1.1.5. Contact tank and pump station
2.3.1.1.6. Shaft with a measuring device at the output of the PSWF.
2.3.1.1.7. Crane shaft at the exit of the WWTP
2.3.1.2. By Process Waste Water (LLC):
2.3.1.2.1. Equalizer / average
2.3.1.2.2. Static mixer
2.3.1.2.3. Lamellar precipitators with built-in reaction chamber.
2.3.1.2.4.
2.3.1.2.5. Sludge storage silo
2.3.1.2.6. Dewatering and Reagent Building for LLC
2.3.1.3. Auxiliary buildings and facilities:
- check point (located in the building of grids and sieves),
- administrative and laboratory building,
- substation,
- diesel unit.
2.3.2. Earthwork and final backfilling, drainage (including removal and disposal of materials and earth masses, if required.
2.3.3. Construction of all exterior coatings (plaster)and, reinforcement, masonry, skeletal and roof structures, insulation, plastering, etc.).
2.3.4. All finishing and installation work of the station.
2.3.5. Demolition of existing structures to be removed, as well as reuse or removal and disposal of relevant materials at sites designated in accordance with local regulations and leveling of the cleared area.
2.3.6. Stconnecting new installations with existing facilities (pipes)
3. Implementation of the part "Electro, Electromechanical and Hydromechanical Equipment" in accordance with the approved design and program for the implementation of the activities, including delivery, testing and transportation to the site of all necessary materials and equipment and their insertion or installation and adjustment, namely:
- hydraulic, furelectrical or electrical equipment, including propulsion equipment, controls, monitoring, measuring,
- equipment necessary for the proper operation and maintenance of installations (lighting, heating, telephone connections, etc.),
- the dispatch system.
4 . Commissioning of the installations and carrying out the tests specified in the requirements of the contracting authority.The scope of the activities due to the contractor is specified in the technical specifications.
The participant must have a registration in the Central Professional Register of Builders (CPRC) with the Construction Chamber for the execution of construction works in the category of construction in which the object of the contract group IV falls, minimum I (first) category.
According to Art. 60, para. 1 of the PPA, foreign participants can proveregistration in analogous registers according to the law of the Member State in which they are established.
In the case of a non-legal entity, the registration requirement is proved by each participant in the construction association, according to the distribution of the participation of persons. in the performance of the activities provided for in the merger agreement.
When subcontracting, they must meet the above requirement according to the type and proportion of the contract they will be fulfilling. AESP), section A "Suitability", indicating the group and category of construction sites for which it is listed in the Centralprofessional register of the builder, as well as the number of the certificate of registration and date of validity or equivalent.
Proof:
Under the conditions of art. 67 para. 5 of the Public Procurement Act or at the conclusion of the contract, the above requirement shall be proved by a copy of a certificate for entry in the CPSU to the Construction Chamber for execution of construction works of the category of construction in which it falls within the moment of the conclusion of the contract.
For more information: http://register.ksb.bg/.
If selected as a contractor is a participant foreign legal entity that provides cross-border, temporary or one-off construction services in the territory of the Republic of BULGARIA, it should submit, prior to the conclusion of the contract, a certificate for entry in the CPRS with the scope of the group and the construction category, which allows the execution of the orderor a copy of a certificate for the performance of a one-off or temporary construction service for a specific construction on the territory of the Republic of BULGARIA (Art. 25a of the LCS).
1. The participant in the last 3 (three) completed financial years - 2016, 2017 and 2018, depending on the date on which the participant was established or started its activity, should have a minimum total turnover of 30 000BGN 000.00 (BGN thirty million and 00) excluding VAT
2. The participant must have valid Professional Liability Insurance, pursuant to Article 171 of the Spatial Planning Act of the person (s) who will perform the construction, for damages caused to other participants in the construction and / or to third parties as a result of unlawful acts or omissions in the course of or in connection with the performance of their duties for
Note: For a participant established / registered in the Republic of BULGARIA, the Professional Liability Insurance should be in accordance with Article 171, Paragraph 1 of the Construction Act, covering the minimum insurance amount for a construction contractor of the first category according to Article 137, Paragraph 1, Item 1, letter "e" of the Spatial Planning Act and the entered into force building permit in the amount of BGN 600 000 according to Art. 5, para. 2, item 1 of the Ordinance on the Terms and Conditions for Compulsory Insurance in Design and Construction.
According to Art. 171a. of the LTA the requirement for professional liability insurance of the persons under Art. 171, para. 1 shall not apply to a person from a Member State of the European Union or from another country party to the Agreement on the European Economic Area established on thethe territory of the Republic of BULGARIA and has provided equivalent professional indemnity or guarantee insurance in another Member State of the European Union or in a party to the Agreement on the European Economic Area.
With the participation of a non-legal entity, the requirement responsibility "is demonstrated by each party to the merger who willperforms construction according to the distribution of the participation of the persons in the performance of the activities envisaged in the contract for the formation of the association. with a 4-year training course and acquired a professional qualification in the fields of ArchArchitecture and Construction "and" Engineering "for" Construction Technician "or equivalent; Experience: Has completed at least 1 participation as a member of a construction site implementation team with the position of Technical Manager.
4) Quality Control Expert - Education and qualification: possess a certificate of completed training in quality control of construction performance for compliancein construction products with essential safety or equivalent requirements; experience: to have completed at least 1 participation as a member of a team for the implementation of a construction site with the position of expert "Quality control".
5) Plumbing engineer - education and qualification: completed higher education with a Bachelor's, Master's degree or equivalent imaging degree when acquiredand abroad, specialty "Water Supply and Sewerage", "Water Supply and Sewerage Networks and Facilities", "Water Treatment", "Hydraulic Engineering", "Hydroelectric Construction", "Water Engineering" or other special, providing knowledge, skills and competences related to the construction and operation of water sector systems and facilities in a professional field"Architecture, Construction and Geodesy" and / or "General Engineering" in the field of "Engineering Sciences" according to the Classifier of Higher Education and Professional Areas, approved by Decree No 125 / 24.6.2002, or equivalent, with prof. qualification "civil engineer", "engineer" or equivalent; experience: have completed at least 1 participation as a member of a construction site team with aplumbing expert plumbing
6) Electrical specialist / counter. ed. appliances and aut. - qualifications and qualifications: completed higher education with a Bachelor's, Master's or equivalent degree degree in cases where the rank is ranked in prof. "Mach. engine "and / or" Electrical, Electrical and Auto " in the field of "Tech. is a science "according to IUCN, approved by Decree № 125 / 24.6.2002, or equivalent, with prof. qualification" mechanical engineer "and / or" el.electrical engineer "or equivalent; experience: have completed a minimum of 1 participation as a member of a site testing team with the position of Specialist in Electromechanics / Instrumentation and Automation.
7) Responsible for compliance control. Occupational Health and Safety Qualifications and Qualifications: Qualified Person (possessing a valid Certificate of Completion of the course "Construction Safety and Health Coordinator" or equivalent documents) with qualifications, professional experience and technical skills. competency in the field of pro, p. 5, para. 2 of Ordinance No. 2 / March 22, 2004 for min. for Occupational Safety and Health in the course of construction works; experience: to have completed at least 1 participation as a member of a site management team on a site with the position of expert on OSH.
8) Expert in construction waste management - experience: to haveexperience in design.
9) Surveyor engineer - survey and quarters: completed higher education with acquired Bachelor's, Master's or Master's Degree or equivalent "Surveying, Photogrammetry and Cartography", "Land Management", "Surveying", "Surveying" or "Surveying and Surveying", as well as a person with higher education abroad with recognized and legalized diplomaand Art. 9, para. 3, item 9 and art. 10, para. 2, item 4 of the Higher Education Act, which corresponds to the mentioned specialties, with Prof. Qual-engineer or equivalent; experience: to have completed at least 1 participation as a member of a team for the execution of a construction site with the position Eng. " Surveyor ".
Note: An individual may perform the functions of only one expert.
III. The trainer must have a quality management system in place, a certificateinitiated in accordance with BDS EN ISO 9001: 2015 or equivalent, with a range of certifications in the field of page.
IV. The appliance must have an environmental management system in place in accordance with EN ISO 14001: 2015 or equivalent
.
Internet address (URL): http://vik-shumen.net/

Documents

Tender Notice
Login to view

Similar tenders

Bulgaria Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Water purification plant construction work was 03 Jan 2020. Bidding is closed.

This tender has been issued by „?????????????? ? ??????????? — ?????“ ??? in Bulgaria.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45252210 - Water purification plant construction work.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 38122098. The purchaser document reference is 543085-2019.

See the Similar Tenders section on this page or browse other tenders from Bulgaria.

This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.