Tender notice from Romania, published on 04 Jun 2019.
Executive Summary
The APA CTTA S.A. ALBA has issued a Tender notice for the procurement of a Contract notice: Water-main refurbishment construction work in the Romania. This Tender notice was published on 04 Jun 2019 and is scheduled to close on 12 Aug 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 33565779, while the tender notice number is 259929-2019 and Register on the platform.
Key facts
Summary
Contract notice: Water-main refurbishment construction work
Object of the contract Water-main refurbishment construction work Description: Contract notice: Water-main refurbishment construction work Authority Type: Utilities entity Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45232151, 42131390, 45232150, 45232152, 45232154, 45232151, 42131390, 45232150, 45232152, 45232154 CPV Description: Water-main refurbishment works - Assemblies of valves - Works related to water-distribution pipelines - Pumping station construction work - Construction work of elevated tanks for drinking water - AB3-CL3 Extension and rehabilitation of water supply SZA Apuseni Reference Number : 1755482/2018/7 The object of the contract is rehabilitation works, by replacing them on a modified routeat the STAP Mihoiesti-Garde and Campeni Abrud pipelines, works of extension of the pipeline between Garde and Baia de Aries, works of reconnection of localities and consumers serviced by the pipelines, the construction of new water farms adjacent to the pipelines adduction and rehabilitation of an existing water house, works of demolition of supranational onesExisting pipelines over the Aries and Abrud rivers, according to the requirements of the specifications. Main Site: Territorial administrative units (ATUs) Sohodol, Cimpeni, Bistra, Lupsa, Baia de Aries, Rosia Montana, Abrud. of the works contract according to the requirements of the Tender Book, as follows: - works for the realization of new pipelinesof water, with a total length of approx. 40.8 km, together with the technological and other adjacent buildings, as follows: CL3.1 Rehabilitation Adaptation STAP Mihoiesti Garde 13 km CL3.2 Extension Adduction Garde - Baia de Aries 16, 7 km CL3.3 Addition Rehabilitation Campeni Abrud 11, 1 km - construction of pipelines for local connection. and consumers currently served to the r pipewith a total length of approx. 5, 5 km, together with galleries, water meters and hydrants, as follows: CL3.1 - 3 km, CL3.2 - 1.3 km, CL3.3 - 1.2 km - the construction of new water farms for serving localities adjacent to the monastery, Lupsa, Muncel, modernization Water management Baia de Aries, rehabilitation of Gura Rosiei Replacement Station, - special works of the underwratercommunication channels and water courses, and water courses overloading, - realization of the SCADA telecommunication line along the adduction pipeline, - the abolition of the overloads of the existing water supply over the Aries and Abrud rivers after the new adduction pipeline was put into operation : Execution of works 35 months Warranty period 36 months Val. estimated contract is 74.173.388 RON and does not include the amounts representing "various and unforeseen expenses." The quantities in the quantity lists were determined according to the Task Book, and the estimated value of the contract was determined by multiplying them by the unitary prices. related to the contract shall be based on the actual quantities executed and on unitary pricesis offered. The general and specific clauses relating to the remission of works and the determination of the value of the works actually executed are: Clause 49 [Measurement, Valuations and Provisional Amounts] and Clause 50 [Payments] 1 The bidders, associates, third parties and subcontractors MUST not find themselves in the situations provided by art. 177 of Law no. 99 / 2016. The way they canis demonstrating the fulfillment of the requirement: DUAE will be completed by all operators participating in the procedure, with information related to their situation. Consideration will be given to the required supporting documents and the following. Up-to-date supporting documents demonstrating the fulfillment of those undertaken by completing the DUAE are to be submitted at the request of the entitycontracting parties, only by the tenderer ranked first after applying the award criterion to the admissible tenders. 2 The bidders, associates, third parties and subcontractors MUST not find themselves in the situations provided for in art. 178 of the Law no. 99 / 2016. The way to demonstrate the fulfillment of the requirement: DUAE will be completed by all operators pthe participants in the procedure, with the information related to their situation. Consideration will be given to the required supporting documents and the following. Up-to-date supporting documents demonstrating the fulfillment of those undertaken by completing the DUAE shall be submitted, at the request of the contracting entity, only by the tenderer ranked first after the application of the criterionof its award on admissible tenders. 3 The bidders, associates, third parties and subcontractors MUST NOT find themselves in the situations provided by art. 180 of Law no. 99 / 2016. The way to demonstrate that the requirement is met: DUAE will be filled in by all operators involved in the procedure, with information related to their situation. They will be inview the requirements for required supporting documents and the following. The up-to-date supporting documents proving the fulfillment of the assumed completion by the DUAE shall be submitted, at the request of the contracting entity, only by the bidder ranked first after the application of the award criterion for the admissible tenders. 4 Avoiding ConflictInterests The economic operator (individual bidder / affiliate / subcontractor / third party) will complete the DUAE form confirming that the economic operator is not in any of the situations provided in art. 72 and 73 of Law no. 99/2016 on sector acquisitions. The decision - makers of the Contracting Entity in terms of organization, running andthe completion of the award procedure is presented in the declaration of the contracting authority's manager, part of the public procurement dossier and are the following: Bardan Cornel Stefan General Manager, Dreghiciu Ioan Deputy General Manager, Hategan Gheorghe Technical Manager, Maris Cristina Elena Economic Director, Dumitrel Zenaida Human Resources Director, Ionita Eugen Project ManagerIPU If the economic operator (bidder / affiliate / subcontractor / third party) is in one of the situations provided by art. 73 of the Law no. 99/2016 regarding the sector acquisitions, it will be excluded from the award procedure, the offer being rejected. The manner of fulfillment by which the fulfillment of the requirement can be demonstrated: All the participants in the procedure for(bidders, associates, subcontractors and third parties) will complete the DUAE with the information related to their situation and will present together with DUAE Form no. 3 Declaration on non-compliance with the situations stipulated in art. 73 of the Law no. 99 / 2016. Required supporting documents (applicable to Requirements 1-4) The supporting documents proving the fulfillment of the assumedby completing the DUAE and to be submitted, at the request of the contracting entity, only by the tenderer ranked first after applying the criterion ... details on www.e-licitatie.ro Specify the annual average turnover Requirement 1. The figure business The average annual turnover for the last 3 years (2016, 2017, 2018) must be at least 74, 173, 300 RON. Notes: 1) In casewhich more economic operators participate in the awarding procedure, the fulfillment of the criteria regarding the economic and financial situation is demonstrated by taking into account the resources of all the members of the group. 2) Each economic operator (single bidder / affiliate bidder) will fill in the appropriate IPAE fields on economic and financial capacity. 3) Forthe financial statements denominated in currencies other than lei will be used for the conversion of the average annual exchange rate / leva, communicated by the National Bank of Romania (http://www.bnr.ro) for each year. 4) Documents issued in a language other than Romanian must be accompanied by an authorized translation in Romanian. Details of the economic operator Will be in the heatare the requirements mentioned in the "Annual average turnover" criterion, and if the annual average turnover data is not available for the entire required period, it is required to specify the date on which the economic operator was established or has the Potential Bidder, resident in the European Community and European Economic Area countries(EEA), can consult the European Commission's DG Economic Growth website at the following address: http://ec.europa.eu/markt/ecertis/searchDocument.do to identify and compare equivalent documents (if available) available) requested by the Contracting Entity in the FDA. All certificates and documents issued in a language other than Romanian will be accompanied by the translation of the authorsIn the case of an association, the person who signed the offer, authorized to engage the economic operator, must be confirmed by all the members of the association, by submitting the mandates signed by all the representatives with their right of signature. Documents will be uploaded scanned after signed original documents by all members of the association. Criterion ofThe economic operator will specify in the submitted offer which of the information included in the Technical Proposal and in the Financial Proposal, with the exception of the price, are considered to be confidential, classified, protected by an intellectual property right, on the basis of the applicable law, in so far as objectively disclosing such informationwould prejudice the legitimate interests of the economic operator, particularly as regards commercial secrecy and intellectual property Form no. 12 The 71-month period provided in Section II.2.4 consists of the 35-month execution period and the 36-month warranty period. The bidders in this procedure understand that the Contractor may not be againstresponsible for any damage in the event of the decision to cancel the award procedure irrespective of its nature and regardless of whether the Contracting Entity has been notified of the existence of such damage. Law no. 99/2016 expressly provides in Art. 225 cases where the Contracting Entity has the obligation to make such a decision. Bidders withinof this procedure accepts the use of the above-mentioned special conditions, assuming full responsibility for any damage they may suffer in the described situation. For viewing the awarding documentation uploaded in SEAP, economic operators must have a program necessary to visualize electronically signed files (websites of electronic signature providersa) - Rules for communication and data transmission: Requests for clarification will be addressed by the interested economic operators EXCLUSIVELY in SEAP section Requests for clarifications / Questions, and the answers to them will be published in SEAP in the section Clarifications, notifications and decisions in the tender announcement, as well as in the section Requests for clarifications / questions, The Contracting Entity will not comply with requests addressed by means of communication other than that established in accordance with the provisions of Art. 160 par. (1) of the Law no. • The Contracting Entity will respond in a clear and complete manner to any request for clarification or additional information, in accordance with the provisions of Art. 172 paragraph (2) din Law no. 99/2016 on sector acquisitions For subsequent posting submissions: the evaluation committee will forward requests for clarification regarding the tender by using the technical facilities available in the SEAP (Questions Section) Economic operators will forward the answers to the clarifications and any requested documents during the evaluation of the offersthrough SEAP (Section "Questions"), in electronic format, signed with electronic signature Internet address (URL): www.apaalba.ro
The bid deadline for Contract notice: Water-main refurbishment construction work was 12 Aug 2019. Bidding is closed.
This tender has been issued by APA CTTA S.A. ALBA in Romania.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45232151 - Water-main refurbishment construction work, 42131390 - Assemblies of valves, 45232150 - Works related to water-distribution pipelines, 45232152 - Pumping station construction work, 45232154 - Construction work of elevated tanks for drinking water.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 33565779. The purchaser document reference is 259929-2019.
This tender falls under Construction and Real Estate, Technology and Equipment in Romania. Suppliers in these sectors can track similar Romania tenders using CPV-based alerts.