MIĘDZYRZECKIE PRZEDSIĘBIORSTWO WODOCIĄGÓW I KANALIZACJI SP. Z O.O. has floated a tender for Contract notice: Wastewater treatment plant construction work. The project location is Poland and the tender is closing on 15 May 2020. The tender notice number is 165258-2020, while the TOT Ref Number is 42110731. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Poland

Summary : Contract notice: Wastewater treatment plant construction work

Deadline : 15 May 2020

Other Information

Notice Type : Tender

TOT Ref.No.: 42110731

Document Ref. No. : 165258-2020

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : MIĘDZYRZECKIE PRZEDSIĘBIORSTWO WODOCIĄGÓW I KANALIZACJI SP. Z O.O.
Office Name: Międzyrzeckie Przedsiębiorstwo Wodociągów i Kanalizacji Sp. z o.o.
Address: Święty Wojciech 46
Town: Międzyrzecz
Postal Code: 66-300
Contact Point: Zdzisława Marzec

Phone: +48 957427623
Fax: +48 957427624
Poland
Email :oczyszczalnia@mpwik.org
URL :www.mpwik.org

Tender Details

Object of the contract
Wastewater treatment plant construction work

Description: Contract notice: Wastewater treatment plant construction work

Authority Type: Utilities entity
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45252127, 45252127, 71000000, 71320000, 45100000, 45110000, 45111291, 45200000, 45262700, 45233140, 45300000, 45400000, 45453000, 45252127, 71000000, 71320000, 45100000, 45110000, 45111291, 45200000, 45262700, 45233140, 45300000, 45400000, 45453000
CPV Description: Wastewater treatment plant construction work.

Architectural, construction, engineering and inspection services.

Engineering design services.

Site preparation work.

Building demolition and wrecking work and earthmoving work.

Site-development work.

Works for complete or part construction and civil engineering work.

Building alteration work.

Roadworks.

Building installation work.

Building completionwork.

Overhaul and refurbishment work.

Arrangement of water and sewage management in the Międzyrzecz agglomeration, ensuring high operational efficiency of the water and sewage system and its adaptability to climate change

Reference Number: 19 / ZP5 / DEOŚ / POIIŚ / 2020

2.1. The subject of this order is the design and construction of works covered by task No. 1 "Modernization and roconstruction of the mechanical-biological part of the sewage treatment plant together with project documentation and start-up "and task no. plots reference No. 419, 420, 421, 285/4, 286/4, 287/4, 288/14, 288/16, 288/18, 289/5, 290/13 located within the geodesic area of Saint Wojciech, commune of Międzyrzecz ". The investor is Międzyrzeckie Przedsiębiorstwo Wodociągow i Kanalizacji Sp. Z oo

Main Site: Międzyrzecz, Lubuskie Voivodship, Międzyrzecki District, POLAND.

Task No. 1" Modernization and extension of the mechanical-biological part of the sewage treatment plant together with project documentation and commissioning. "

Construction, reconstruction and remonty of the following buildings:

- grate building (structure no. 1) reconstruction of the existing structure,

- drainage catchment station (structure no. 2A) reconstruction of the existing structure,

- retention tank for transported sewage (structure no. 2B) reconstruction of the existing structure,

- channel sewer (building no. 3A) planned building,

- sewer (building no. 3B) reconstruction of the existing building,

- sandlongitudinal section (structure no. 4) planned structure,

- dephosphation chamber (structure no. 5) reconstruction of the existing structure,

- storage reservoir (structure no. 6) reconstruction of the existing structure,

- sewage separation chamber (structure no. 7) designed structure,

- aeration chamber (facilities No. 8A, 8B) reconstruction of existing facilities,

- secondary settler (facilities No. 9A, 9B) reconstruction of existing facilitiesnon-effluent,

- measurement chamber for the amount of treated sewage (facility No. 10) reconstruction of the existing facility,

- measuring container (facility No. 10A), designed facility,

- recirculated sludge pumping station (facility No. 11A) reconstruction of the existing facility,

- recirculated sludge pumping station ( structure No. 11B) existing structure (to be taken out of service),

- excessive sludge pumping station (structures No. 12A, 12B) reconstruction of existing facilities,

- gate valve (facility No. 12C) designed facility,

- sludge storage tank (facility No. 13) reconstruction of the existing facility,

- sludge and sewage pumping station (facility No. 14) reconstruction of the existing facility,

- container building for screenings (building no. 15) planned building,

- sand separator building (building no. 16) designed building,

- gravitational excessive sludge thickener (facility No. 17), designed facility,

- sludge dewatering building (facility No. 18) reconstruction of the existing facility,

- lime silo (facility No. 18A), designed facility,

- sludge shed, dewatered (facility No. 19) designed facility,

- blower station (facility No. 20) reconstruction of the existing facility,

- local sewage pumping station (facility No. 21)) designed building,

- waste collection station from sewer manholes (building no. 22) designed building,

- drainage sludge catchment station (building no. 23) designed building,

- local sewage pumping station (building no. 24A) reconstruction of the existing building,

- gate valve chamber (object No. 24B), designed object,

- air biofilter (objects No. 29A, 29B), designed objects,

- tankk PIX (building no. 31) reconstruction of the existing building,

- building of the control room and LV switchgear (building no. 33) reconstruction of the existing building,

- power generator (building no. 34) planned building,

- warehouse building (building no. 35) reconstruction of the building existing,

- warehouse building (object No. 36) reconstruction of the existing object,

- heat pump (object No. 38A, 38B, ) object design

Accompanying infrastructure:

- reconstruction and construction of internal roads and squares, as well as pavements and bands around buildings, scope of work adequate to the scope of facilities covered by task No. 1,

- reconstruction and construction of technological inter-object networks (sewage pipelines, technological water pipelines, compressed air, air for biofilter etc.) the scope of the robot adequate to the scopeof facilities covered by task No. 1,

- reconstruction and construction of internal sanitary sewage and storm water drainage, scope of work adequate to the scope of facilities covered by task No. 1,

- reconstruction of LV electrical and control lines scope of work adequate to the scope of facilities covered by task No. 1,

- reconstruction of the control system of the I&C treatment plant scope of work adequate to zof the facilities covered by task No. 1,

- construction of a new fencing of the sewage treatment plant, scope of work adequate to the scope of the facilities covered by task No. 1.

Existing facilities intended for use:

- local sewage pumping station (facility no ...

scope.

The contracting authority will consider the condition fulfilled if the contractor submitting the tender for part I shows that:

a) he has achievedfor the last 3 financial years, and if the business period is shorter for that period, the minimum annual turnover in each financial year equal to at least PLN 30, 000, 000.00 gross;

b) is insured against civil liability in the scope of conducted business subject to the order, for an amount of not less than PLN 30, 000, 000.00 gross;

c) has financial resourcesor a creditworthiness of at least PLN 30, 000, 000.00 gross;

the Purchaser considers the condition fulfilled if the contractor submitting the offer for Part II shows that:

a) he has achieved the last 3 financial years, and if the period of business is shorter for this period, the minimum annual turnover in each financial year equal to at least PLN 5, 000, 000.00 gross;

b) is insuredy from civil liability in the scope of conducted activity related to the subject of the order, for an amount not less than PLN 5, 000, 000.00 gross;

c) has financial resources or creditworthiness of at least PLN 5, 000, 000.00 gross.

Note! If the contractor submits a bid for both lots, it is sufficient for him to meet the conditions for lot I. No sum is requiredPolicy value, assets and turnover. If the contractor meets the conditions indicated for Part I, it will also meet the conditions for Part II, because the contracting authority requires significantly less financial and economic potential.

4.8. The contracting authority will exclude contractors from proceeding:

4.8.1. who have not demonstrated that they meet the conditions for participation in the proceedings referred to in point 4.2;

4.8.2. which notprove that they do not have the conditions specified in art. 24 paragraph 1 point 12 23 of the Act, excluding the case referred to in Art. 24 paragraph 1 point 13 lit. d, and in the case referred to in art. 24 paragraph 1 point 14 if the person referred to in this provision has been convicted of an offense mentioned in art. 24 paragraph 1 point 13 lit. d;

4.8.3. which are subject to the conditions specified in art. 24 paragraph 5 uponds, i.e.: 1) in relation to which liquidation was opened, in the arrangement approved by the court in restructuring proceedings there is provision for satisfaction of creditors by the liquidation of its assets or the court ordered the liquidation of its assets pursuant to art. 332 paragraph 1 of the Act of 15 May 2015 Restructuring Law (Journal of Laws of 2019, item 243, as amended) or whose bankruptcy was announced, with the exception ofcontractor who, after the declaration of bankruptcy, has concluded an arrangement approved by a final court decision, if the arrangement does not provide for satisfaction of creditors by the liquidation of the assets of the bankrupt, unless the court ordered the liquidation of his assets under art. 366 section 1 of the Act of February 28, 2003 on the Bankruptcy Law (Journal of Laws of 2019, item 498 as amended);

2) who is in a serious wayhis professional duties, which undermines his integrity, in particular if the contractor, as a result of the intended act or gross negligence, failed to perform or improperly performed the contract, which the contracting authority is able to demonstrate by means of appropriate evidence;

3) if the contractor or persons referred to in art. 24. paragraph 1 point 14, authorized to represent the contractor are in relations of Fr.outlined in art. 17 clause 1 point 2 4 of:

a. ordering,

b. persons authorized to represent the contracting authority,

c. members of the tender committee,

d. persons who made the statement referred to in art. 17 clause 2a, unless it is possible to ensure impartiality on the part of the contracting authority in a way other than by excluding the contractor from participation in the procedure. Excluding the case for whichm referred to in art. 24 paragraph 1 point 13 lit. d, and in the case referred to in art. 24 paragraph 1 point 14 if the person referred to in this provision has been convicted of an offense mentioned in art. 24 paragraph 1 point 13 lit. d;

4) who, for reasons attributable to him, did not perform or improperly performed significantly the previous public procurement contract or concession contract concluded withspeakers, referred to in art. 3 clause 1 point 1 4, which led to the termination of the contract or the award of damages;

5) being a natural person who has been validly convicted of an offense against the employee`s rights or an offense against the environment, if for committing the sentence the arrest, restriction of liberty or fine has been imposed not less than PLN 3, 000;

6) if the office memberany of its management or supervisory body, company partner in a public or partnership company or general partner in a limited partnership or limited joint-stock partnership or commercial representative, has been validly sentenced for an offense referred to in point 5;

7) for whom a final administrative decision on breach of the obligations arising labor law, environmental protection law or regulationson social security, if this decision was imposed with a financial penalty of not less than PLN 3, 000;

8) who violated the obligations regarding taxes, fees or social security or health insurance contributions, which the contracting authority is able to prove by means of appropriate evidence, with the exception of case referred to in art. 24 paragraph 1 point 15, unless the contractor has made the payment duetaxes, fees or social security or health insurance contributions together with interest or fines or has entered into a binding agreement on the repayment of those debts.


Internet address (URL): www.mpwik.org

Documents

 Tender Notice