Tender notice from Poland, published on 11 Oct 2018.
Executive Summary
The PRZEDSI?BIORSTWO GOSPODARKI KOMUNALNEJ I MIESZKANIOWEJ SP. Z O.O. has issued a Tender notice for the procurement of a Contract notice: Wastewater treatment plant construction work in the Poland. This Tender notice was published on 11 Oct 2018 and is scheduled to close on 19 Nov 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 27560243, while the tender notice number is 444151-2018 and Register on the platform.
Key facts
Summary
Contract notice: Wastewater treatment plant construction work
Object of the contract Wastewater treatment plant construction work Description: Contract notice: Wastewater treatment plant construction work Authority Type: Utilities entity Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45252127, 71320000, 71321000, 71322000, 45000000, 45110000, 45111200, 45200000, 45231300, 45231500, 45232400, 45232410, 45232421, 45232422, 45232423, 45252100, 45252200, 45260000, 45262000, 45300000, 45310000, 45311000, 45311200, 45315600, 45400000, 45410000, 45421000, 45430000, 45442100, 45443000, 16710000, 16520000, 43250000, 16140000, 45252127, 71320000, 71321000, 71322000, 45000000, 45110000, 45111200, 45200000, 45231300, 45231500, 45232400, 45232410, 45232421, 45232422, 45232423, 45252100, 45252200, 45260000, 45262000, 45300000, 45310000, 45311000, 45311200, 45315600, 45400000, 45410000, 45421000, 45430000, 45442100, 45443000, 16710000, 16520000, 43250000, 16140000 CPV Description: Wastewater treatment plant construction work. Engineering design services. Engineering design services for mechanical and electrical installations for buildings. Engineering design services for the construction of civil engineering works. Construction work. Building demolition and wrecking work and earthmoving work. Site preparation and clearance work. Works for complete or part construction and civil engineering work. Construction work for water and sewage pipelines. Compressed-air pipeline work. Sewer construction work. Sewerage work. Sewage treatment works. Sludge-treatment works. Sewage pumping stations construction work. Sewage-treatment plant construction work. Purification plant equipment. Roof works and other special trade construction works. Special trade construction works otherthan roof works. Building installation work. Electrical installation work. Electrical wiring and fitting work. Electrical fitting work. Low-voltage installation work. Building completion work. Plastering work. Joinery work. Floor and wall covering work. Painting work. Facade work. Pedestrian-controlled agricultural tractors. Unloading trailers for agriculture. Front-end shovel loaders. Manure spreaders. Extension and reconstruction (modernization) of the sewage treatment plant in Turku and extension of the sewerage and water supply network in the agglomeration Turek Reference Number: DGK-GRAIZ / SG-92/2018 The subject of the order is the design and execution of construction works in as part of the task titled: "Development and reconstruction (modernization) of the sewage treatment plant in Turku and extension of the sewage and water networkin the agglomeration of Turek "including the implementation of, among others: project documentation, obtaining the necessary administrative decisions, author's supervision, delivery, execution of construction works based on the prepared documentation, preparation of as-built documentation and confirmation of submitting the application for excluding part of the deposit from waste with code 19 08 05. The detailed scope of the order specifies-PFU constituting Attachment No. 10 to the Terms of Reference and template agreement constituting Annex No. 5 to the ToR. Main Site: Sewage treatment plant in Turku, area: ul. Leśna in Turku 1. The subject of the order is the preparation of documentation for the extension and reconstruction (modernization) of the sewage treatment plant in Turku and the extension of the sewerage and water supply network in the Turek agglomeration, development of the construction project and theincluding all decisions and permits necessary for the modernization of sewage treatment plants and construction of sewage and water supply networks, as well as construction works based on the approved design, Technical Specifications of Robot Production and Acceptance, Functional and Use Program, administrative decisions . 2. Planned capacity of the sewage treatment plant as to the expressed cargoin RLM it will be up to the minimum level of 110, 250 MR, without increasing the current hydraulic capacity Q d d = 15 750 m / d. Other parameters for the development of the treatment plant: a) RLM = 110, 250 (calculated as BZT5) b) Loads not less than specified in PFU c) Q h max = 1 100 m / h d) Q r max = 5 748 750 m / year 3. The scope of the orders includes: a) Design: The Contractor will develop and approve at the Orderand (b) Construction works: demolition of buildings, earthworks, concrete, reinforced concrete and masonry works, technological works, sanitary networks and installations, electrical and I & C installations, insulation works, renovation and repair works, and security works, land use and road works, delivery and mequipment installation, electricity supply and distribution in accordance with power supply conditions, commissioning of sewage treatment plant, construction of sewage pumping station with accompanying elements, construction of gravitational sanitary sewage with a length of 2, 180 m and diameter of 200 mm, construction of discharge pipeline with a length of 245.5 m and diameter 90 / 5.1-160 / 5.1 mm, made of PE-80 SDR 17.6 pipes, construction of a water network1 811.5 mb and diameter 90 / 5.4-460 / 5.4 mm, made of PE-100 PN 10 pipes, commissioning of sewage and water supply systems, delivery of a complete set of equipment, labeled instructions, collective protection measures in the scope of health and safety and fire protection, required by specific regulations for proper operation of the sewage treatment plant, sewage and water systemdraft, training, riots: The Contractor will train the Employer's staff, carry out commissioning and start-up of the entire treatment plant and perform post-implementation tests of the treatment plant's impact on environmental components, tightness tests and pressure of sewerage and water supply systems and water testing (according to Environmental Protection Law). 4. A detailed description of the orders from the subI am responsible for the objects and the scope of tasks and responsibilities of the Contractor in the ToR, model contract and PFU and their attachments, which are available with this announcement on the website of the Employer (www.pgkim-turek.pl). 1. Contractors may participate in the proceedings, for which there are no grounds for exclusion from the Proceedings under Art. 24 sec. 1 point 12-23 of the Act, excluding prexiles referred to in art. 24 sec. 1 point 13 lit. d) and point 14 in the area of an offense specified in art. 24 sec. 1 point 13 lit. d) of the Act (premises for mandatory exclusion) and in art. 24 sec. 5 points 1, 5 and 6 of the Act and meeting the conditions for participation in the Procedure, specified in point 8.2 SIWZ. 2. According to art. 22 ust. 1b of the Act, the Contractors who will fulfill the Order may apply for granting the Orderconditions regarding: 2.1. Competence or entitlements to conduct a specific professional activity, if it results from separate regulations - the contracting authority does not specify specific conditions in this respect. 2.2. Economic or financial situation, 2.3. Technical or professional capacity. 3. The Contractor may, in order to confirm compliance with the conditions of participation in the proceedings in appropriate situations, oraz in relation to a specific order, or part of it, rely on the technical or professional capacity or financial or economic situation of other entities, regardless of the legal nature of the legal relationship that it has therewith. 3.1. The Contractor, who relies on the abilities or situation of other entities, financial or economic capacity, must prove to the Contracting Authority thatBy completing the order, he will have the necessary resources of these entities, in particular by presenting the obligation of these entities to give him the necessary resources for the implementation of the Order. 3.2. The Employer will assess whether the technical or professional capacities made available to the Contractor by other entities or their financial or economic situation will allow to demonstrateThe Contractor meets the conditions for participation in the proceedings and examines whether there is any subject of exclusion referred to in art. 24 sec. 1 point 13-22 of the Act (excluding the premises specified in Article 24 (1) point 13 (d) and point 14 in the area of an offense specified in art. 24 sec. 1 point 13 lit. d) of the Act) and in art. 24 sec. 5 points 1, 5 and 6 of the Act. In the cases referred to in-Art. 24 sec. 1 point 19 of the Act, before exclusion of the Contractor, the Employer shall provide the Contractor with the opportunity to prove that his participation in the preparation of the Proceedings did not distort competition. The contracting authority indicates in the protocol how to ensure competition. 3.3. If the Contractor demonstrates compliance with the conditions referred to in clause 8 of the Terms of Reference and refers to the resources of other entities in order to demonstrate-lack of grounds for exclusion and fulfillment in the scope in which they refer to their resources, condition of participation in the Proceeding - publishes information about these entities in the statement referred to in point 9.1. this SIWZ. 3.4. In order to assess whether the Contractor relies on the abilities or situation of other entities under the principles set out in Article 22a of the Act, will have at its disposal the necessaryassobami to the extent enabling proper implementation of the public order and assessment whether the relationship between the Contractor and these entities guarantees effective access to their resources, the Ordering Party requests documents, which will specify in particular: a) scope of resources available to the Contractor other entity, b) manner of using resources another entity, by the Contractor, at the execution of the Order, c) scope-and the period of participation of another entity, in the performance of the Order, or the entity, on the capacities of which the Contractor relies in terms of the conditions for participation in proceedings regarding experience, will carry out construction works whose indicated capacities relate to - 4. With regard to conditions relating to education, professional qualifications or experience, contractors may rely on other skillsentities if these entities carry out construction works or services for the performance of which these capacities are required. It is required that the Contractor demonstrates that he is in an economic and financial situation ensuring the execution of the Order, ie a) he has financial resources or creditworthiness - in an amount not less than PLN 5, 000, 000.00 (in words: five million zlotys) Documents and educationrequired from the Contractor to confirm compliance with the conditions of participation in the proceedings: 1. information from the bank or cooperative savings and credit union confirming the amount of funds held or the creditworthiness of the contractor in the period not earlier than one month before the deadline for submission of tenders, 2. other documents referred to in art. 26 par. 2c of the Act - iffor a justified reason of an objective nature, the Contractor is not able to obtain the documents referred to in point 1. Documents and statements required from the Contractor confirming the absence of grounds for exclusion of the Contractor from the proceedings: 1. information from the National Criminal Register in the scope specified in art. 24 sec. 1 point 21 of the Act, issued not earlier than 6 months before the deadlinesubmitting offers, 2. information from the National Criminal Register in the scope specified in art. 24 sec. 1 point 14 of the Act (with the exception of the condition contained in Article 24 paragraph 1 item 13 d) of the Act) and to the extent specified in art. 24 sec. 5 points 6 of the Act issued not earlier than 6 months before the deadline for submission of tenders, 3. information from the National Criminal Register in the scope specified in art. 24 sec-1 point 13 of the Act (excluding the condition contained in Article 24 paragraph 1 item 13 d) of the Act) and to the extent specified in art. 24 sec. 5 points 5 of the Act, issued not earlier than 6 months before the deadline for submission of tenders - in relation to natural persons, 4. annotation from the relevant register or from central records and information on economic activity, if separate regulations require an entryto the register or records in order to demonstrate the absence of grounds for exclusion under art. 24 sec. 5 points 1 of the Act, 5. declaration of the Contractor about the lack of a ruling against him as a preventive measure for the prohibition of applying for public orders (drawn up in accordance with the formula contained in Annex 9 to the ToR), 6. Contractor's statement that the final judgment of the conviction court has not been issued forproceeding to a restriction of liberty or a fine to the extent specified by the Ordering Party on the basis of art. 24 sec. 5 points 5 and 6 of the Act (drawn up in accordance with the formula included in Appendix No. 9 to the ToR), 7. the Contractor's statement on the issue or non-release of a final court judgment or final administrative decision against him in default of paying taxes, fees or social security contributionssocial or health care (prepared in accordance with the formula included in Appendix No. 9 to the ToR) and in the event of issuing such a verdict or decision - documents confirming payment of the amount due with possible interest or fines or conclusion of a binding agreement regarding repayment of these amounts due, if an enforceable judgment of the court or last has been issued to the Contractoran administrative decision on overdue payment of taxes, fees or social security or health insurance contributions. Contractor, within 3 days from the date of posting on the website the information referred to in Art. 86 par. 5 of the Act provides the Employer with a declaration of belonging or non-affiliation to the same capital group as referred to in art. 24 sec. 1 point 23 of the Act. Along with the submission of the statement, the Contractor may provide evidence that links with another Contractor do not lead to distortion of competition in the Proceedings. In the case of a consortium, the declaration is submitted separately by each of the Contractors jointly applying for the order. The Contracting Authority may exclude the Contractor at any stage of the proceedings for the award of the order. If the Contractor is established orb place of residence outside the territory of the Republic of Poland, instead of the documents listed in points 1-4, submit documents according to paragraph 7 of the Regulation of the Minister of Development of 26.7.2016 on the types of documents that the Employer may request from the Contractor in the Proceedings for granting the order (Journal of Laws of 2016, item 1286). Due to technical reasons, the Ordering Party in point II.2.7.) Aftergave the date determining the beginning of the order as 1.1.2019. It is an approximate date, the actual start of the contract will be the conclusion of the contract with the Contractor. The Contracting Authority may annul the procedure for granting the order, in accordance with art. 93 para. 1a of the Public Procurement Law Internet address (URL): www.pgkim-turek.pl
The bid deadline for Contract notice: Wastewater treatment plant construction work was 19 Nov 2018. Bidding is closed.
This tender has been issued by PRZEDSI?BIORSTWO GOSPODARKI KOMUNALNEJ I MIESZKANIOWEJ SP. Z O.O. in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45252127 - Wastewater treatment plant construction work, 71320000 - Engineering design services, 71321000 - Engineering design services for mechanical and electrical installations for buildings, 71322000 - Engineering design services for the construction of civil engineering works, 45000000 - Construction work, 45110000 - Building demolition and wrecking work and earthmoving work, 45111200 - Site preparation and clearance work, 45200000 - Works for complete or part construction and civil engineering work, 45231300 - Construction work for water and sewage pipelines, 45231500 - Compressed-air pipeline work, 45232400 - Sewer construction work, 45232410 - Sewerage work, 45232421 - Sewage treatment works, 45232422 - Sludge-treatment works, 45232423 - Sewage pumping stations construction work, 45252100 - Sewage-treatment plant construction work, 45252200 - Purification plant equipment, 45260000 - Roof works and other special trade construction works, 45262000 - Special trade construction works other than roof works, 45300000 - Building installation work, 45310000 - Electrical installation work, 45311000 - Electrical wiring and fitting work, 45311200 - Electrical fitting work, 45315600 - Low-voltage installation work, 45400000 - Building completion work, 45410000 - Plastering work, 45421000 - Joinery work, 45430000 - Floor and wall covering work, 45442100 - Painting work, 45443000 - Facade work, 16710000 - Pedestrian-controlled agricultural tractors, 16520000 - Unloading trailers for agriculture, 43250000 - Front-end shovel loaders, 16140000 - Manure spreaders.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 27560243. The purchaser document reference is 444151-2018.
This tender falls under Construction and Real Estate, Technology and Equipment in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.