Contract notice: Waste disposal site construction Tender - 35798228
Tender notice from Greece, published on 27 Aug 2019.
Executive Summary
The ??????? ????????????? ????????? ????? ??????? has issued a Tender notice for the procurement of a Contract notice: Waste disposal site construction work in the Greece. This Tender notice was published on 27 Aug 2019 and is scheduled to close on 09 Sep 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 35798228, while the tender notice number is 401800-2019 and Register on the platform.
Key facts
Summary
Contract notice: Waste disposal site construction work
Object of the contract Waste disposal site construction work Description: Contract notice: Waste disposal site construction work Authority Type: Body governed by public law Contact Nature: Works Procedure: Competitive procedure with negotiation Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45222110, 71335000, 90513200, 45112350, 45222110, 71335000, 90513200, 45112350 CPV Description: Waste disposal site construction work Engineering studies Urban solid-refuse disposal services Reclamation of waste land Design - construction of works for the first phase of OEDA rehabilitation West Attica and Transitional Waste Management By contract, the contracting authority seeks to find a temporary (intermediate) solution to Attica solid waste management, in order to allow time for the implementation and implementation of the provisions of the PESDA. Attica, including the final restoration of the site. The contract is mixed and includes the preparation of studies, the execution of the project, the support to the operation and rehabilitation of the site. Main Site: Organized Waste Management Facilityis in the position of Skalistiri of the Municipality of Fili. Phase I: The preparation of all the necessary studies to be carried out during the execution of the contract, including the EIA, as well as all the actions and actions for the drawing up the documents needed to ensure the timely issuance of all authorizations and approvals provided for in the relevant texts;classes, for the construction and operation of the project, including a technical report of the entire OEDA Phase B: All construction work on the intermediate waste disposal site within the Integrated Waste Management Facility (OEDA) of West Attica. The construction and operation of the site should meet the objectives set by thecurrent provisions of European Union legislation on landfill of waste. The tasks include but are not limited to: The cells to be selected must have a minimum capacity of 4, 000, 000 m. The cell construction tasks include but are not limited to: - cell shaping projects, with the required excavations, landfills, embankments or others- own technical projects, which the bidders will deem necessary, for the static stability of the waste basin to be created by the new deposits; provide for the simultaneous coverage of waste on a daily basis and the stabilization of waste slopes, - the construction of the necessary accesses, taking into account the daily loadthe aforementioned, - cell waterproofing works, with an alumina barrier or equivalent solution, membrane at least 2 mm, membrane protection layer, drainage layer, necessary protection geotextiles etc., - drainage management projects, ie collection wells, drainage network, etc. Accompanying works of new landfill cells. include all necessary road networksfire, fire-fighting, biogas leakage control projects, central irrigation networks, rainwater management, fencing and everything else that the AEDO has to approve. the following operations: - final cell surface smoothing and shaping operations, with the necessary soil cover, - laborreliefs, - rainwater diversion, - biogas expansion, - background planting work, - planting work [...]. Phase III: In support of EDNNA . operation of the landfill. The support operation is for 2 years and includes: D' Phase: In addition to the contractor support services described in Phase III, provision of operating and maintenance services for equipment to be provided by the contractor is intended to enable X's transitional operation. These measures may be taken into account by some of them described in circular 8.The duration of this phase corresponds to Phase 3. The contractor will manage the recyclable materials and other usable products, which may result from the transitional management, in accordance with the technical offer. As far as fitness is concerned, the pursuit of professional activity requires economic operators toregistered in the relevant professional register kept in their State of establishment Internet address (URL): http://www.edsna.gr
The bid deadline for Contract notice: Waste disposal site construction work was 09 Sep 2019. Bidding is closed.
This tender has been issued by ??????? ????????????? ????????? ????? ??????? in Greece.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45222110 - Waste disposal site construction work, 71335000 - Engineering studies, 90513200 - Urban solid-refuse disposal services, 45112350 - Reclamation of waste land.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 35798228. The purchaser document reference is 401800-2019.