Contract notice: Underground work other Tender in Hungary - 42561772
Tender notice from Hungary, published on 30 Apr 2020.
Executive Summary
The BUDAPEST FŐVÁROS XII. KERÜLET HEGYVIDÉKI ÖNKORMÁNYZAT has issued a Tender notice for the procurement of a Contract notice: Underground work other than tunnels, shafts and subways in the Hungary. This Tender notice was published on 30 Apr 2020 and is scheduled to close on 03 Jun 2020, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 42561772, while the tender notice number is 200173-2020 and Register on the platform.
Key facts
Summary
Contract notice: Underground work other than tunnels, shafts and subways
Object of the contract Underground work other than tunnels, shafts and subways Description: Contract notice: Underground work other than tunnels, shafts and subways Authority Type: Regional or local Agency/Office Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45221250, 45112711, 45211360, 45221250, 45232000, 45236210, 45221250, 45112711, 45211360, 45232000, 45236210 CPV Description: Underground work other than tunnels, shafts and subways. Landscaping work for parks. Urban development construction work. Ancillary works for pipelines and cables. Flatwork for children`s play area. Melyepites keretmegallapodas Reference Number : EKR001563692019 Keretmegallapodas kereteben melyepitesi, tajepitesi, - kerteszeti, - koernyezetrendezesi es parkepitesi munkak megrendelese. Main Site : Budapest Fővaros XII. district co-management area and the XII. The co-management area of the Budapest districts adjoining the district I. Ajanlatkerő [hereinafter in the advertisement: AK] based on the experience so far 4-5 pcs, 10, 000, 000 - 50, 000, 000 HUF in coezo values 8-10 pcs Quantity AK draws attention to the fact that: (own or ta - the contractor is not obliged to carry out its purchases on the basis of the framework agreement, however, depending on the investment conditions and the resources available to the vendor, the frame rate according to the framework agreement is also fully agreed with the contractor. With this in mind, I recommend it onceThe winning bidder must be able to satisfy more and more simultaneous procurement needs, so that the elaboration of more and more bids at the same time, as well as the simultaneous execution of more individual contracts, can be required with a coordinated work schedule., a closed system of sewage with a diameter of at least DN 1200 mmchannel, minimum 1200 m, mininum DN 100 mm in diameter, steel cables with a minimum operating pressure of 16 bar, at least 670 m long ridge or distribution cable, installation of at least 10, 700 m2 of asphalt pavement Design of at least 3, 500 m2 and flowering bodies and shrub bodies At least 3500 m2 of paving, at least 4000 m2 pavement with antifreeze layer, sign plate, at least 2 X-rays. with asphalt pavement. At least 4 oil traps or oil separators are required for installation, at least 350 m, at least DN 100 mm GOeV (goembgraphite oentoettvas pipe) is required for discharge NATURA 2000 one II. The reason for the exclusion of the tender is not possible: In order for the coespens to be used effectively, the breakdown into parts is incompatible with economic necessity. III. The advertisement II.2.5. IN POINT: 1st The lower limit of the score that can be given in the evaluation of the content elements of the tenders according to the evaluation criteria is 0 points, the upper limit is 10. The method of scoring: AK is the 1st value. with respect to (the net net bid price [HUF]), the reverse gold-plating is applied as detailed in KD. eye, straight gold is used as described in KD szerint. AK a 3. ert. In terms of aspects, the scoring method is used according to the details in the KD. Section 76 (10) AK a 2. The professional experience of the professional participating in the contract performance (III.1.3. M.2.a.) corresponds to the following: from the point of view of evaluation: the summoned III. 1.3. M.2. The specialist presented for the minimum suitability requirement according to point a) has a number of responsible professional technical supervisors with MV-KE classification (or equivalent), whose subject matter was the implementation of work for the reconstruction of a complex urban cohesive area. Pursuant to Section 77 (1), the 2nd aspect of interestmost unfavorable level 0 pcs (the most unfavorable recommendation is insignificant) I) Kizaro reasons: 1. In the procedure, there may be no tenderer [hereinafter in the notice: AT], subcontractor [hereinafter in the notice: AV] and may not take part in the certificate of suitability of an economic operator who is a member of the Public Procurement Act. Section 62 (1) - (2) under the power of specified kizaro causesif the procedure is the AT, AV or the organization receiving the certificate of aptitude, for which the reason for exclusion was taken during the procedure. AK draws the attention of the Kbt. Opportunity for cleansing according to - 64. The final decision must be submitted by the economic operator at the same time as the Single European Procurement Document [hereinafter in the notice: EEKD]. 2. A.)Preliminary confirmation: AT to the 321/2015. (X. 30.) Korm. R. [hereinafter in the notice: Korm.r.] Section 1 (1). on the basis of the Government. 2-7. -, you must prove in advance by submitting the EEKD that you do not belong to the Public Procurement Act. Section 62 (1) and (2) If the required suitability requirements are met by AT based on the capacity of the other organization, the Kbt. Section 67 (3) based on the recommendationThe declaration included in the EEKD regarding the non-maintenance of the grounds for exclusion shall be submitted to the organization providing its capacities. Section 67 (4) on the basis of the offer, a declaration must be submitted by AT stating that it does not take into account the provisions of the Public Procurement Act for the performance of the contractor. Section 62 (1) - (2) determined Kizaro causes power under AV. Koezoes bid caseen a Korm.r. - 3 (5) iranyado. A Korm. r. -- 1.-7. and - 13. B.) Certificate: A Gov.r. Section 1 (2) on the basis of AK under the Kbt. Section 69 (4) - (7) on the basis of which the Government has been invited to submit certificates regarding the grounds for exclusion. - 8, - 10, 12-16. -, he must prove that he is not subject to the exclusionary reasons prescribed in the procedure. Section 1 (4) (5) and (7). Section 69 (11a) es a Korm. r. - II.) II.) Suitability for completion of professional activity: 1. A 322/2015. (X.30.) Korm. R. Section 21 (1) according to the Kbt. Section 65 (1) (c) of the AK Regulation, it is unsuitable for AT if the economic operator carrying out construction activities in the construction industry complies with Act LXVIII of 1997. edible kiwifruitis not included in the register of economic operators, or the economic operator not established in Hungary is not included in the register of the country of establishment (assuming the law of the country of establishment so requires), or has a license, license or organization required in the country of establishment, . (Section 65 (1) (c) e) of the Public Procurement Acts 322 / 2015.Kr. Section 21 (1) - (2)) 2. 2.1. Preliminary attestation: A.) Read the invitation to tender III.1.2) Preliminary attestation of suitability: A). Section 65 (7), (9) 2.2. Certificate: The Government r. Section 1 (2) on the basis of AK under the Kbt. Section 69 (4) - (7) based on a certificate of suitability for fitnessk to the submission of an economic operator summoned by the Government. Section 26 (2) you must duly prove that you comply with the Public Procurement Act. Section 65 (1) (a) In the case of an economic operator established in Hungary, the registered fact is checked by AK on the basis of the data of the registers of the construction industry. b) Non-HungarianIn the case of an economic operator established in Zagon, Annex XI to Directive 2014/24 / EU. A certificate (extract) or other certificate or statement according to the registers listed in the appendix shall be submitted as a certificate A Kbt. Section 65 (7), (9), Section 69 (11), (11a), Korm. R. Section 1, paragraphs (4), (5) and (7) shall apply.zesi documents XII. The certificate is presented in two stages: 1. Preliminary certification: A) The Kbt. Section 67 (1) es a Korm. r. Section 1 (1) on the basis of the submission of the EEKD. Section 2 (5) AK accepts the simple declaration of the economic operator concerned with regard to the prior verification, ie Annex IV of the EECD. Section alpha: a section must be completed, further sections nem. Section 67 (3) On the basis of the proposal, the declaration of the organization providing its capacities with regard to the suitability of the suitability requirements must be submitted to the EEKD, and further to the Government. Section 3 (3) The Kbt. Section 65 (6) Irishbased on the fact that, based on the required suitability requirements, coezing ATs can also meet individually. In the case of co-requirements which, by definition, can only be applied exclusively to economic operators, the possibility of a single co-operation is sufficient if co-sufficiency is granted in the case of a co-operating proposal. - 3 (5) iranyado. B) Other organization or person getsIn the case of the inclusion of acitasanak, the Kbt. Section 65 (6) - (8) and (11) 2. Certificate: The Government r. Section 1 (2) on the basis of AK under the Kbt. Section 69 (4) - (7) on the basis of the Government of the Republic of Hungary, the economic operator invited to submit the certificates concerning the suitability requirements. - 19 must certify that it complies with the provisions of Art. Section 65 on the basis of suitability determined by AKi test requirements as follows: P.1. To be attached to the Government r. Section 19 (1) (a) If the report of the garden is available on the website of the company information service, the data of the report shall be checked by AK, in which case the submission of the report shall not be required. b) If AT does not have a report for the entire required period, because it started working after the beginning of the examined period, then according to Section 19 (2) of the Government Decree, suitability for the subject of co-procurement during the working period (ut renovation), and / or construction and / or co-construction and / or landscaping and / or landscaping and / or landscaping (c) If AT does not have the required report or account, because it operates in a legal form which It is not possible to submit a report or a declaration of income, 19.- (3) shall apply. also. P.2. To be attached to the Government r. Section 19 (1) (c) is the summoned taskthree years prior to the date of entry into force of this Regulation, in the business year closed on the balance sheet date (public refurbishment, parkepites) - a statement of incomedepending on when the economic operator took up his activity or when he started his activity, if this information is available. AK draws the attention of Kbt. Section 140 (9) Iranyado a Korm. R. - 19 (2); (3), (6) - (7). es a Kbt. - 65 (6) - (8) es (11), Kbt. - 67 (3) es Kbt. 69.-. (11a) AK draws attention to the Government. Section 1 (4) - (5) and (7)en, as well as the Kbt. - 65 (12) 1) The tender must be submitted: a) - Kbt. Section 66 (2) statement of offer pursuant to - Kbt. Section 67 (4) - a declaration on the variation registration procedure (a negative declaration must also be attached), in addition, in the case of a variation registration procedure, the documents specified in - 133 of the Act - Kbt. Section 66 (6) sstatement (a negative statement must also be attached). AK a - 2 (3) BC requires AT to list in the EEKD the subcontractors already known at the time of submitting the offer, - AT`s statement to Kbt. With regard to Section 65 (7) - a statement of business secrets - a statement of the securing of the insurers - a statement of the insurers of the offer - a - Declaration on the professional experience of the professionals presented - Declaration on the professional experience of the professionals presented - Declaration on the translation - Statement on the translation of the CA. - 25 (3) - (4) - if the AT Pursuant to Section 69 (11), it is not possible to certify a document or dataIn case of registration in ar language, it is necessary to submit the Hungarian translation of the relevant certificate or information, - tender statement regarding the 2nd aspect of interest - professional offer: 1. A detailed price offer (pruned co-seed) with the company-like subdivision of T in the format specified in the KD. 2. The Tonnage Management Plan carried out by the company-like alairas with the 3rd e b) The declarations / documents included in the tender must be attached to the tender in detail on behalf of the economic operator participating in the certificate of suitability at AT, see the document certifying the right of representation. Co-procurement Documents. Section 71 provides an opportunity. AK does not order another h 3) Conditions for suitability of the contract for performance of the contract by AT and proof of this by the qualified tenderers. more strictly in the case of the following points: III.1.1. III.1.2. III.1.3 4) AK a 322/2015. (X.30.) Korm. R. Pursuant to Section 26, the winning AT shall be required to take out liability insurance or to extend existing liability insurance in at least HUF 500, 000, 000 / year and at least HUF 100, 000, 000 / year, covering construction work. transport (transport) activity of a given substance17 01 01 EWC code for concrete, 17 03 02 EWC code for bituminous mixtures, 17 05 04 EWC code for non-hazardous materials and aggregates and 20 02 01 EWC code for biodegradable waste, 20 02 EWC code for soil and stone waste transport activities 6) The language of the procedure and the offer is Hungarian, so communication during the procedure cannot be accepted in any other language. The tender may not be submitted in any language other than Hungarian. with regard to the application of working time, the following id 9) AT may not make an alternative offer 10) The winning AT confirms the contract included in the draft contract. *** Continuation of the call VI.4.3) IV. IN POINT: Internet address (URL): http://www.hegyvidek.hu
The bid deadline for Contract notice: Underground work other than tunnels, shafts and subways was 03 Jun 2020. Bidding is closed.
This tender has been issued by BUDAPEST FŐVÁROS XII. KERÜLET HEGYVIDÉKI ÖNKORMÁNYZAT in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45221250 - Underground work other than tunnels, shafts and subways, 45112711 - Landscaping work for parks, 45211360 - Urban development construction work, 45232000 - Ancillary works for pipelines and cables, 45236210 - Flatwork for children's play area.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 42561772. The purchaser document reference is 200173-2020.