Contract notice: Tramway works Tender in Poland - 23821689
Tender notice from Poland, published on 01 Jun 2018.
Executive Summary
The POZNA?SKIE INWESTYCJE MIEJSKIE SP. Z O.O. has issued a Tender notice for the procurement of a Contract notice: Tramway works in the Poland. This Tender notice was published on 01 Jun 2018 and is scheduled to close on 10 Jul 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 23821689, while the tender notice number is 234622-2018 and Register on the platform.
Object of the contract Tramway works Description: Contract notice: Tramway works Authority Type: Body governed by public law Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45234121, 71320000, 71323100, 71322300, 71322500, 45233252, 45232451, 45234121, 45220000, 45234128, 32400000, 45100000, 45110000, 45210000, 45213300, 45221120, 45221121, 45234126, 45233120, 71000000, 71500000, 71600000, 71900000, 77300000, 77310000, 45234121, 71320000, 71323100, 71322300, 71322500, 45233252, 45232451, 45220000, 45234128, 32400000, 45100000, 45110000, 45210000, 45213300, 45221120, 45221121, 45234126, 45233120, 71000000, 71500000, 71600000, 71900000, 77300000, 77310000 CPV Description: Tramway works. Engineering design services. Electrical power systems design services. Bridge-design services. Engineering-design services for traffic installations. Surface work for streets. Drainage and surface works. Engineering works and construction works. Tramway platforms construction work. Networks. Site preparation work. Building demolition and wrecking work and earthmoving work. Buildingconstruction work. Buildings associated with transport. Viaduct construction work. Road viaduct construction work. Tramline construction works. Road construction works. Architectural, construction, engineering and inspection services. Construction-related services. Technical testing, analysis and consultancy services. Laboratory services. Horticultural services. Planting and maintenance services of green areas. "Construction of a tram route from the Wilczak loop to Naramowice in Poznań" and "Construction of the Nowa Naramowicka transport node" Reference Number: PIM / 05/18 / ZP44 / 2016-71 The subject of the orders is an investment consisting in comprehensive construction of the route tram with the construction or reconstruction of the road system, underground and ground infrastructure as well as land development and a small architewhich, in the "design build" formula - "Construction of a tram route from the Wilczak loop to Naramowice in Poznań" and "Construction of the Nowa Naramowicka transport hub". Main Site: Poznań. The subject of the orders is an investment consisting in the comprehensive construction of a tramway along with the construction or reconstruction of the road system, underground and ground infrastructure as well as land development and small aarchitecture, in the "design build" formula - "Construction of a tram route from the Wilczak loop to Naramowice in Poznań" and "Construction of the Nowa Naramowicka transport hub". Bearing in mind that the investment will be implemented in the "design and build" mode, the scope of The Contractor's actions will consist in: a) Implementation of project works involving the preparation of the Construction ProjectExecutive Documents, as-built documentation and obtaining all necessary, final or enforceable decisions, permits, permits, approvals and approvals of the appropriate bodies, entities or managers of the area / infrastructure and obtaining a permit for use Investment, b) Comprehensive execution of construction works in accordance with the scope described in PFU and approved by Zadesigning documentation developed by the Contractor, c) Completing any other obligations indicated in the contents of PFU, Specification of Essential Terms of Orders, Agreement and other documents constituting their integral attachments. 2. The estimated value of the order exceeds the amount specified in the regulations issued on the basis of art. 11 para. 8 of the Act on Public Procurement Law andthe amount specified in art. 169 sec. 2 point 1) of the Act - 3. Information on European Union funds: A project co-financed from EU funds under the following agreements: • • co-financing agreement no POIS.04.02.00-00-0035 / 16-00 of the project "Improvement of communication conditions along the national road No. 92 in Poznań" POISE .04.02.00-00-0035 / 16 within measure 4.2: Increased transport accessibility of centersout of the TEN-T road network and relieving towns and cities from excessive road traffic, priority axis IV: Road infrastructure for the cities of the Operational Program Infrastructure and Environment 2014-2020, • contract for co-financing No. POIS.06.01.00-00-0039 / 16 -00 Project "Construction of a tram route from Plekla Wilczak to Naramowice in Poznań" No. POIS.06.01.00-00-0039 / 16, under measure 6.1 Developmentpublic mass transport in cities priority axis VI The development of low-emission public transport in the cities of the Operational Program Infrastructure and Environment 2014-2020. 4. The contracting authority provides for the award of contracts referred to in Article 67 sec. 1 point 6 of the Act (up to 25% of the value of the basic order) in case of circumstances referred to in art. 67 sec. 1 point 6 of the Act. PThe subject matter of the mentioned orders will be similar works and / or services in line with the subject of the basic order. The Ordering Party anticipates such orders in particular when there is a necessity and / or the need to carry out the scope of works not covered within the scope of the basic order, and the execution of which will be possible by similar construction worksestablishments and / or services as provided for under the scope of the basic order. 5. The Employer provides for the possibility of changing the future contract with the Contractor in accordance with the provisions of the model contract and the provisions of the Act 6. In matters not regulated by the Terms of Reference (and appropriate announcement), or in the event of discrepancies in the provisions of the ToR (relevant notice) in relation to the Act, appropriate application and superiority of thehave the provisions of the Act 7. The starting date is an instructional term depending on the course of the procedure. Specific requirements regarding the date of completion and the implementation stages (and their shortening) have been included in the ToR. 1. Contractors who apply for a public order must meet the following conditions for participation in proceedings regarding competences or powers to conduct a given operationprofessional, if it results from separate regulations, financial situation, technical or professional capacity, i.e. they must: a) meet the conditions referred to in art. 22 ust. 1 of the Public Procurement Law and demonstrate their fulfillment at the level required by the Employer as described in Section III.1.1), III.1.2) and III.1.3) of this announcement and b) not subject to exclusion due to failure to complyterms referred to in Article 24 sec. 1 item 12-23 and para. 5 points 1), 4) and 8) of the Act of 29.1.2004 Public Procurement Law. 2. In order to confirm compliance with the condition of participation in proceedings regarding competences or entitlements to conduct a given professional activity, if it results from separate regulations, the Contractors shall submit the following documents: a) UniformEuropean Order Document (EIN) as preliminary confirmation that the contractor meets the conditions for participation in the proceedings regarding competences or entitlements to conduct a specific professional activity, if it results from separate regulations, drawn up and completed in accordance with the Regulation on a single European order document, the scope consistent with the attachment that will remainnot attached to the SIWZ. The Awarding Entity provided the SIWZ with additional information on how to fill in the egg 3. In order to demonstrate the absence of grounds for exclusion from the procurement procedure and confirmation of compliance with the conditions of participation in the proceedings, the Contractor shall submit the following documents, however, in the event of joint application of two or more Contractors for granting-of this order, none of the Contractors may be subject to exclusion under Art. 24 sec. 1 item 12-23 and para. 5 points 1), 4) and 8) PPL, and for each of them it must be demonstrated by: EAT as a preliminary confirmation that the Contractor meets w.u. in post and it is not subject to exclusion. 4. The Contractor may, in order to confirm fulfillment of the conditions for participation in the proceedings, forin the relevant terms and with reference to a particular order, or a part thereof, rely on the technical or professional capacity or financial or economic situation of other entities, regardless of the legal nature of the legal relationship he has with it. . Contractor who refers to the resources of other entities in order to demonstrate the lack-the existence of grounds for exclusion and compliance with them, to the extent that they refer to their resources, the condition of participation in the proceedings, also submits Uniform Documents relating to these entities together with the original third party liability if the Contractor relies on the resources or situation of the third party (document submitted together with the offer) 6. Contractors may jointly apply for a legno orders. In this case, the Contractors shall appoint a representative to represent them in the proceedings for the award of the contract or to represent them in the proceedings and to conclude a public procurement contract. The power of attorney in writing (the original or a copy certified for compliance with the original by a notary public) should be attached to the offer. 8. In the case of joint application for an orderby the Contractors, the Single Document shall be submitted by each of the Contractors jointly applying for the order. This document confirms fulfillment of the conditions for participation in the proceedings and the lack of grounds for exclusion to the extent that each of the Contractors demonstrates fulfillment of the conditions for participation in the proceedings and no grounds for exclusion. The method of filing a document / documents EAT according to the orderto SIWZ, in particular item 12. In order to confirm compliance with the conditions for participation in the Contractor's procedure, the following documents must be submitted: 1) Single European Order Document (EIN) as preliminary confirmation that the Contractor meets the conditions for participation in the proceedings referred to in point III.1.2. part Minimum level (s) of standards possibly required, drawn up and completed-in accordance with the Regulation on the Single European Order Document in the scope compliant with the Annex to the ToR. The Contracting Party, prior to the order being awarded, will call the Contractor whose tender has been best assessed for submission within a prescribed period of not less than 10 days as of the date of submitting declarations or documents confirming the circumstances referred to in art. 25paragraph. 1 of the Public Procurement Law Act: - a) document confirming that the Contractor is insured against civil liability in the scope of conducted activity related to the subject of the order for the guarantee sum specified by the Employer, - b) information banks or cooperative savings and credit unions confirming the amount of financial resources held or the ability to chalkto the Contractor, in a period not earlier than one month before the expiry of the submission of bids, confirming that the condition set out in point III.1.2) of this announcement. - The assessment of compliance with the above conditions will be made on the basis of the analysis of statements contained in EED and the document indicated above according to the formula: "does not meet". - If for justified reasonsthe contractor can not submit the documents required by the Contracting Authority, referred to above, the Employer allows the contractor to submit other documents referred to in art. 26 par. 2c Pzp. Contents of the conditions for the contractor's staff (continuation of entries from section: III.1.2. Minimum level of possibly required standards): - at least 60-month experience in supervising / directingconstruction works as a construction manager and / or manager of a road construction industry, - occupational experience: in the position of construction manager and / or manager of a road construction industry at the implementation of at least 2 construction works consisting of: construction, extension or reconstruction of the road / street with the road surface from the asphalt mixture together with the infrastructure inat least road lighting, rainwater drainage and telecommunications network worth a total of at least PLN 30, 000, 000 gross each. j) Track robot manager: - building qualifications to manage construction works without restrictions in the road engineering specialty in accordance with the Construction Law, - at least 60 months of experience in supervision / managementconstruction works as a construction manager and / or manager of a trackwork industry robot, - occupational experience: as construction manager and / or manager of a track industry robot for the implementation of at least 2 construction works consisting of: construction, extension or reconstruction of a tram track every at least 1 500 m with traction each. k) Robot manager wsanitary industry: - building qualifications to manage construction works without restrictions in the installation specialty in the field of heating, ventilation, gas, water and sewage networks and installations in accordance with the Construction Law, - at least 36-month experience in supervising / directing construction works as a construction and / or steering managerika robot in the sanitary industry. l) Robot manager in the electrical industry: - building qualifications for managing construction works without restrictions in the installation specialty in the field of electrical, power and electrical installations and equipment in accordance with the Construction Law. Further wording of conditions in Section VI .3) of this order notice (additional information)iające. 1. Investor Substitute Poznań Municipal Investments Społka z o.o. with headquarters in Poznań, acting on behalf of and for the City of Poznań on the basis of Order No. 371/2017 / P of the Mayor of Poznań of June 8, 2017 on the principles of commissioning and settlement of the tasks entrusted to perform the founding act. Poznańskie Inwestycje Miejski społka with limited responseedzialnością based in Poznań, amended by the Regulation No. 946/2017 / P of the Mayor of Poznań dated 21/12/2017, as well as powers of attorney granted to the Company by the Mayor of the City of Poznań to carry out investment tasks and recommendations for the implementation of ZDM and ZTM. Injunctors from the budget Cities of Poznań intended for financing the investment task. In the scope ofpreparation and execution of the public procurement procedure. The Substitute Investor acts as a Proxy pursuant to art. 15 of the Public Procurement Law. For the purpose of these proceedings, provided for in the Public Procurement Law and this Terms of Reference and Proceedings notice, references to the "Ordering Party" for eachazowo Substitute Investor - Poznań Municipal Investments Społka z o.o. with the exception of the Beneficiary of the bid bond and ZNWU brought in a form other than cash (Beneficiary City of Poznań). 2. This announcement contains divided content (in relation to the provisions of the SIWZ) due to limited editing possibilities of the form of the contract notice (limited number of characters in individual fields). F.on, systematized content of the conditions of participation in the proceedings and documents submitted by the Contractor in the framework of individual stages of the proceedings (along with the offer or at the request of the Employer) is included in the SIWZ. In connection with point 2 above the Contractors applying for the award of the contract are required to read the full content of the ToR with attachments. 3. The contracting party provides for the possibility-using the procedure referred to in art. 24aa paragraph 1 of the Public Procurement Law Act 4. The period of being bound by the offer indicated in Section IV.2.6) of this announcement should be understood as 90 days, in accordance with art. 85 ust. 1 point 2 of the Public Procurement Law Act 5. Further content regarding the condition of participation in a proceeding regarding technical or professional capacity -continuation from section III.1.2) - List and brief description of the eligibility criteria: - at least 36-month experience in supervising / managing construction works as construction manager and / or manager of the electrical industry, - occupational experience: minimum one task including the construction or reconstruction of a rectifier station (in the field of power equipment)supplying a tramway traction network with a gross value of not less than PLN 4, 000, 000 and a minimum of one task involving the construction or reconstruction of a tramway traction network with a gross value of not less than PLN 2, 000, 000, as a Manager of an energy robot. telecommunications: - building qualifications for managing construction works without restrictions ininstallation specialty in the field of network, installation and telecommunications equipment in accordance with the Construction Law, - at least 36-month experience in supervising / managing construction works as construction manager and / or manager of the telecommunications industry. m) Robot manager in the construction industry : - building qualifications for managing construction works befrom restrictions in the construction and construction specialty in accordance with the Construction Law, - at least 36-month experience in supervising / managing construction works as a construction manager and / or manager of a construction and construction industry robot. n) Robot manager in the bridge industry: Cd. in point VI.4.3) Submission of appeals Internet address (URL): www.pozim.pl Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Tramway works was 10 Jul 2018. Bidding is closed.
This tender has been issued by POZNA?SKIE INWESTYCJE MIEJSKIE SP. Z O.O. in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45234121 - Tramway works, 71320000 - Engineering design services, 71323100 - Electrical power systems design services, 71322300 - Bridge-design services, 71322500 - Engineering-design services for traffic installations, 45233252 - Surface work for streets, 45232451 - Drainage and surface works, 45220000 - Engineering works and construction works, 45234128 - Tramway platforms construction work, 32400000 - Networks, 45100000 - Site preparation work, 45110000 - Building demolition and wrecking work and earthmoving work, 45210000 - Building construction work, 45213300 - Buildings associated with transport, 45221120 - Viaduct construction work, 45221121 - Road viaduct construction work, 45234126 - Tramline construction works, 45233120 - Road construction works, 71000000 - Architectural, construction, engineering and inspection services, 71500000 - Construction-related services, 71600000 - Technical testing, analysis and consultancy services, 71900000 - Laboratory services, 77300000 - Horticultural services, 77310000 - Planting and maintenance services of green areas.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 23821689. The purchaser document reference is 234622-2018.
This tender falls under Construction and Real Estate, Computer Hardware and Software Services, Agriculture and Foods in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.