Tender notice from Poland, published on 18 Mar 2020.
Executive Summary
The MIASTO BIELSKO-BIAŁA - MIEJSKI ZARZĄD DRÓG W BIELSKU-BIAŁEJ has issued a Tender notice for the procurement of a Contract notice: Traffic-monitoring equipment in the Poland. This Tender notice was published on 18 Mar 2020 and is scheduled to close on 24 Apr 2020, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 41637686, while the tender notice number is 130177-2020 and Register on the platform.
Object of the contract Traffic-monitoring equipment Description: Contract notice: Traffic-monitoring equipment Authority Type: Regional or local authority Contact Nature: Supplies Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 34970000, 34996000, 45316200, 34972000, 71320000, 51610000, 48821000, 34970000, 34996000, 45316200, 34972000, 71320000, 51610000, 48821000 CPV Description: Traffic-monitoring equipment. Control, safety or signaling equipment for roads. Installation of signaling equipment. Traffic-flow measuring system. Engineering design services. Installation services of computers and information-processing equipment. Network servers. Expansion Intelligent Transport System in Bielsko-Biała Reference Number: 53-20 / IZ / 17 / D / PN The subject of the order is Roconstruction of the Intelligent Transport System in Bielsko-Biała (called "ITS") within the city limits of Bielsko-Biała. Main Site: Bielsko-Biała, POLAND. 1. The contract covers in particular: I. performance of new signaling programs / projects lighting for 18 signaling devices and adjusting them to binding norms and regulations as well as activities within the ITS system in operation; II.providing complete project documentation, in particular: construction and executive designs, including architectural and construction, electrical and teletechnical industries; design of temporary and target traffic organization; project of integration of new project elements with the existing ITS system; III. modernization of intersections with traffic lights along with an improvement in capacity and the necessary elementsmonitoring, detection and motion control. IV. Expansion of the city`s telecommunications infrastructure and data transmission network for the needs of the ITS system. V. Data collection. Data collection and storage options. VI. Expansion, supply, installation and implementation of: a) traffic control subsystem, including modernization and integration into 18 signaling systems; b) priority subsystemfor urban transport on all modernized traffic lights; c) dynamic stop information subsystem at 15 stops; d) video monitoring subsystem in various areas of the city; e) extension of server room and back-up power supply. VII. Construction, delivery, installation and implementation of: a) a dynamic driver information subsystem, including parking informationinput parking information boards 15 pcs, variable content boards 3 pcs; b) devices for informing about the occupancy of parking lots in 2 designated parking lots (one identification of occupancy based on video monitoring, one identification of occupancy based on surface sensors), integration into the subsystem dynamic parking information 4 car parks already having a detection system occupiedplaces. VIII. Obtaining the arrangements and permits required by law. IX. Execution of installation and assembly works based on the developed documentation. X. Supply and assembly of devices and elements included in the system, their commissioning and installation of dedicated software. XI. Carrying out implementation based on data security (including GDPR). XII. Perform calibration runsystem and verification test confirming the measurement accuracy together with a report on the proper functioning of the system and susceptibility to data leakage. XIII. Handing over to the Employer ready-to-use facilities together with as-built documentation. XIV. Conducting the necessary instructions in the field of system operation and maintenance of equipment in technical efficiencyj for personnel appointed by the Employer. XV. Preparation by the Contractor of the ITS system as part of the prepared offer for the technical description of all elements of the ITS System. done tuenot later than 17 months from the date of the contract, with the proviso that within 5 months from the date of the contract the Contractor is required to carry out the design work referred to under point And the table of billing items. 3. The contracting authority assumes that the conclusion of the contract regarding the contract in question will take place by 30/06/2020. In the event of extending the tender procedure, in particular, due to the Contractors taking advantage of legal protection measures, the commencement of the contract will start from the date of the actual conclusion of the contract. 4. The awarding entity envisages the award of orders referred to in art. 67 section 1 point 7 of the Public Procurement Law 1. Contractors who are not subject to exclusion on the basis of the conditions indicated below in points 2 and 3 and who meet the conditionsand participation in the proceedings referred to in section III.1.3. 2. The Contractor is excluded from the contract award procedure in relation to which any of the circumstances referred to in art. 24 paragraph 1 point 12 of 23 Public Procurement Law (obligatory conditions). 3. The Employer shall also exclude the Contractor: 3.1.1. in the case provided for in art. 24 paragraph 5 point 1 of the Public Procurement Law, i.e. the Contractor in relation towhose liquidation has been opened, the arrangement approved by the court in the restructuring proceedings provides for satisfaction of creditors by the liquidation of its assets or the court ordered the liquidation of its assets pursuant to art. 332 paragraph 1 of the Act of 15.5.2015 Restructuring Law or whose bankruptcy was announced, with the exception of the Contractor who after the declaration of bankruptcy has entered into a legally approved agreementanother court decision, if the arrangement does not provide for satisfaction of creditors by the liquidation of the assets of the bankrupt, unless the court ordered the liquidation of his assets under art. 366 section 1 of the Act of 28.2.2003 Bankruptcy Law; 3.1.2. in the case provided for in art. 24 paragraph 5 point 2 of the Public Procurement Law, i.e. a Contractor who has seriously violated his professional obligations, which undermines his integrity, inin particular, if the Contractor has failed to perform or improperly performed the contract as a result of the intended action or gross negligence, which the Employer is able to demonstrate by means of appropriate evidence; 3.1.3. in the case provided for in art. 24 paragraph 5 point 8 of the Public Procurement Law, i.e. the Contractor who violated the obligations regarding taxes, fees or social security contributions or fromprovisional, which the Employer is able to demonstrate by means of appropriate evidence, except in the case referred to in art. 24 paragraph 1 point 15 of the Act "Pzp", unless the Contractor has made payments of taxes, fees or social security or health insurance contributions together with interest or fines or has entered into a binding agreement on the repayment of these debts. 4. Contractor`s Exclusiontakes place in accordance with art. 24 paragraph 7 of the Public Procurement Law 5. Contractor who is subject to exclusion pursuant to art. 24 paragraph 1 point 13 and 14 and 16 20 of the Public Procurement Law or on the basis of the circumstances listed in point 3, may provide evidence that the measures taken by him are sufficient to prove its reliability, in particular to prove compensation for damage caused by a crime or a crime.tax, financial compensation for harm suffered or redress, comprehensive explanation of the facts and cooperation with law enforcement authorities and taking specific technical, organizational and personnel measures that are appropriate to prevent further offenses or tax offenses or improper conduct of the Contractor. The regulation referred to in the sentenceand the first shall not apply if the Contractor, being a collective entity, has been ordered by a final court judgment to prohibit the award of the contract and the period of validity of the prohibition specified in that judgment has not expired. 6. The Contractor is not subject to exclusion if the Employer, taking into account the weight and special circumstances of the Contractor`s act, deems sufficient evidence providedbased on items 5. 7. The Employer may exclude the Contractor at any stage of the procurement procedure. 8. The contracting authority will assess the fulfillment of the conditions for participation in the procedure on the basis of the documents and statements attached to the offer using the "meets, does not meet" method. A contractor who does not meet the conditions for participation in the procedure will be excluded. 9. The contracting authority may, at any stage of progressIt may be considered that the Contractor does not have the required Capabilities, if the Contractor`s involvement of technical or professional resources in other economic activities of the Contractor may have a negative impact on the implementation of the task. 4. A network infrastructure designer who: has a university degree in electronics / telecommunications / or security systems engineering, knowledge of modern wired and wireless transmission techniques confirmed by obtaining a certificate from training in this field, conducted by an entity authorized to perform such training, - has knowledge of IT network security issues confirmed by a certificate or certificate of undergoing a course or training in this field, conducted by meal unitgranting permission to perform such trainings. 5. Electrical designer who: - has building qualifications to design in the installation specialty in the field of electrical, power and electrical networks, installations and devices, - designed the electrical installation for at least one road traffic control and monitoring system with necessary infrasSTRUCTURE. 6. A telecommunications designer who: - has building qualifications for installation in the installation specialty in the field of telecommunications networks, installations and equipment, without restrictions, - has completed at least one fiber optic communication network project. If the person designated for designing in the specialty installation in the scope of telecom networks, installations and equipmentwill have the rights issued on the basis of previously applicable provisions, it should demonstrate that it has building qualifications to design in the installation specialty in the field of telecommunications networks, installations and devices without restrictions. 7. A general construction designer who has building qualifications to design in the specialty of construction and building bRestrictions. If a person designated for designing in a general construction specialty has qualifications issued on the basis of previously binding provisions, he should demonstrate that he has building qualifications for designing in a specialty in construction and construction without restrictions. 8. Manager of electrical works, who: - has the authority to manage construction worksand without restrictions in the installation specialty in the area of electrical, power and electrical networks, installations and equipment. If a person designated to manage electrical works will have the rights issued on the basis of previously applicable provisions, he should demonstrate that he has the building qualifications in the installation and engineering specialty in the scope of electric installationwithout restrictions. 9. Head of teletechnical works, which: - has building qualifications to direct works in the installation specialty in the field of telecommunications networks, installations and devices. If the person designated to direct teletechnical works will have the rights issued on the basis of previously applicable provisions, he should demonstrate, that he has building qualifications in the installation specialty in the field of telecommunications networks, installations and devices without restrictions. 1. EAT declaration The contractor is obliged to submit in the form of a uniform document drawn up in accordance with the template of the standard form set out in the European Commission implementing regulation issued on the basis of art. 59 clause 2 of Directive 2014/24 / EU. 1.1. EAT prepared initially by the Awarding Entity for the said procedure is available on the Awarding Entity`s website at the place of publication of the ToR (Annex 1 to IDW). 1.2. Detailed information on the rules and how to complete the EAT is also provided in the explanations of the Public Procurement Office, available on the Office`s website. 1.3. EAT, you mustin electronic form with a qualified electronic signature. Statements of entities submitting an offer jointly and entities sharing potential submitted on the EAT form should be in the form of an electronic document, signed by a qualified electronic signature by each of them to the extent that they confirm the circumstances referred to in art. 22 usVol. 1 of the Public Procurement Law 1.4. Ordering Party`s recommendations regarding qualified electronic signature: for documents in "pdf" format, signature in PAdES format is recommended, documents in format other than "pdf" should be signed in XAdES format. 1.5. The Purchaser allows data to be sent in formats permitted by applicable law, i.e., among others: .pdf, .doc, .docx, .rtf, .xps, .odt, andThe use of files in .pdf format. The Contractor fills in the EAT by creating an electronic document, using the ESPD tool or other available tools or software that enable filling in the EAT and creating an electronic document, in particular in one of the abovementioned formatting. 1.6. After the Contractor has created or generated the EAT electronic document, the Contractor will signsuje above a document with a qualified electronic signature issued by a qualified trust service provider, who is an entity providing certification services, an electronic signature that meets the security requirements set out in the Act. Such entities are entered in the register of the Minister for Information Technology kept by the National Certification Center. List of entities providing servicesThe qualified electronic signature service is available at (www.nccert.pl) 1.7. The Contractor, who refers to the resources of other entities in order to demonstrate the lack of grounds for exclusion and fulfillment (to the extent that he refers to their resources) of the conditions for participation in the proceedings, submits the statement referred to in section III.1.3 point 1.1 in separate form EAT in electronic formtronic with a qualified electronic signature, signed by persons authorized to represent the entity to whom the documents relate, according to the model in Annex 1 to IDW. 1.8. The contractor, who intends to entrust the performance of part of the contract to subcontractors, places relevant information in Part II, Section D, submitted by the EED and in the offer. 1.9. The Employer does not require an application in partPart II EAT, in section B, date and place of birth of the person authorized to represent the Contractor for the purposes of this procurement procedure. 1.10. In order to pre-confirm the fulfillment of the conditions for participation in the proceedings, the Contractors should make a general statement in this respect by ticking in section IV EAT of point α (alpha). Do not complete the remaining points of the partIV. 2. In the proceedings, communication between the Employer and Contractors is carried out using a miniPortal (https://miniportal.uzp.gov.pl/), ePUAP (https://epuap.gov.pl/wps/portal) and electronic mail. The Employer recommends that Contractors, after opening the offers, use e-mail to communicate with the Employer. 3. The contractor intending to take part in the proceedings must have a konto on ePUAP. At ePUAP, the contractor has access to the following forms: submission, modification, withdrawal of an offer or application, and to forms. for communication. Internet address (URL): http://www.mzd.bielsko.pl
The bid deadline for Contract notice: Traffic-monitoring equipment was 24 Apr 2020. Bidding is closed.
This tender has been issued by MIASTO BIELSKO-BIAŁA - MIEJSKI ZARZĄD DRÓG W BIELSKU-BIAŁEJ in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 34970000 - Traffic-monitoring equipment, 34996000 - Control, safety or signalling equipment for roads, 45316200 - Installation of signalling equipment, 34972000 - Traffic-flow measuring system, 71320000 - Engineering design services, 51610000 - Installation services of computers and information-processing equipment, 48821000 - Network servers.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 41637686. The purchaser document reference is 130177-2020.
This tender falls under Materials and Products, Construction and Real Estate, Defence and Security, Computer Hardware and Software Services in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.