Tender notice from Poland, published on 23 Jul 2019.
Executive Summary
The MIEJSKI ZARZ?D DRÓG W OPOLU has issued a Tender notice for the procurement of a Contract notice: Traffic-monitoring equipment in the Poland. This Tender notice was published on 23 Jul 2019 and is scheduled to close on 26 Aug 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 34903553, while the tender notice number is 344085-2019 and Register on the platform.
Object of the contract Traffic-monitoring equipment Description: Contract notice: Traffic-monitoring equipment Authority Type: Regional or local Agency/Office Contact Nature: Supplies Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 34970000, 30200000, 30233000, 32412100, 32520000, 32562000, 34928470, 34923000, 34942000, 34942100, 34996000, 35262000, 42961300, 42961000, 42965000, 45315100, 45316210, 45213310, 45213316, 45231000, 45233294, 48781000, 48000000, 48151000, 48813200, 48210000, 48211000, 51610000, 72315000, 63712700, 71320000, 71322500, 71330000, 72227000, 34970000, 30200000, 30233000, 32412100, 32520000, 32562000, 34928470, 34923000, 34942000, 34942100, 34996000, 35262000, 42961300, 42961000, 42965000, 45315100, 45316210, 45213310, 45213316, 45231000, 45233294, 48781000, 48000000, 48151000, 48813200, 48210000, 48211000, 51610000, 72315000, 63712700, 71320000, 71322500, 71330000, 72227000 CPV Description: Traffic-monitoring equipment. Computer equipment and supplies. Media storage and reader devices. Telecommunications network. Telecommunications cable and equipment. Optical-fibre cables. Signage. Road traffic-control equipment. Signalling equipment. Signal posts. Control, safety or signalling equipment for roads. Crossing control signalling equipment. Vehicle location system. Command and control system. Information-processing equipment. Electrical engineering installation works. Installation of traffic monitoring equipment. Construction work for buildings relating to road transport. Installation works of walkways. Construction work for pipelines, communication and power lines. Installation of road signals. System management software package. Software package and information systems. Computer control system. Real-time passenger information system. Networking software package. Platform interconnectivity software package. Installation services of computers and information-processing equipment. Data network management and support services. Traffic control services. Engineering design services. Engineering-design services for traffic installations. Miscellaneous engineering services. Software integration consultancy services. Implementation of the Intelligent Traffic Management and Public Transport System in Opole - ITS Opole as part of the project entitled. "Improving the functioning of the public transport system and applying the solution ... Reference Number: NP.260.58.2019.P The subject of this order is the performance of the task titled Implementation of Intelligent Traffic Management System and TraPublic Transport in Opole - ITS Opole as part of the project entitled "Improving the functioning of the public transport system and applying solutions to improve road safety within the railway station Opole Wschod. Main Site: City of Opole To carry out the task entitled. Implementation of the Intelligent System of Traffic Management and Public Transport in Opole - ITS Opole as part of the project entitled"Improving the functioning of the public transport system and applying solutions to improve road safety within the Opole Wschod railway station" consists of: 1.2.1.ETAP I scope 1 involving the development and delivery to the Employer of complete project documentation along with obtaining all necessary permits and arrangements required by applicable regulationsthe right and making arrangements with any third parties and transferring the copyright to the created work that ensures the implementation and launch of Intelligent Transport Management System - in accordance with the principles of modern technical knowledge, applicable laws and regulations, including Construction Law and provisions on safety and health protectionas well as environmental protection, provisions of the Contract, Terms of Reference, responses and information provided by the Employer to contractors' questions regarding explanations of the ToR, in writing, Functional and Use Program with attachments. In particular, elements of technical and design documentation, consisting of among others for: a. Analysis of the traffic light programalong with the analysis of the geometry of 49 traffic lights at intersections and pedestrian crossings in Opole and their adaptation to binding norms and regulations, b. Preparation of the concept of the Traffic Management and Public Transport System in Opole and submitting to the Ordering Party acceptance, c. Completion of the complete technical and design documentation, in particular: • Construction projects andimplementing, among others branches: - road, - architectural and construction, - electric, - teletechnical. And when it will be necessary: - projects to remove all collisions of networks designed and existing with networks, devices and facilities, among others energy, telecommunication, gas pipelines, water supply, sewage, hot water pipelines, etc .. • Installation projectsstart-up and configuration of the ITS system, • Temporary and target traffic organization project, • Information on safety and health care, • Inventory of trees and shrubs to be cut up in the required range together with the project of substitute plantings in the city of Opole together with obtaining cutting permits, if necessary, • Visualization of construction equipmentin the road lane such as: signs and boards, • Investor cost estimates (industries separately) together with a summary statement of investment costs prepared using the simplified calculation method. Establishing an investment cost estimate in each case must be preceded by the development of work pro- cess, Technical specifications of the performance and acceptance of the robot for each industry separately, Dokumenot mentioned above, but necessary for the correct implementation of the Task, including the operating instructions for system components, emergency procedures, in particular specified in PFU. 1.2.1. STAGE I scope 2 involving the execution of construction and assembly works in accordance with the provisions of the Agreement, the SIWZ, answers and information provided by the Employer to the contractors' questions regarding the explanationsci SIWZ, in writing, a Functional Program with attachments and on the basis of project documentation approved by the Contracting Authority prepared by the Contractor in the scope of 1 of this stage, i.e. for: a. Introduction of necessary corrections of horizontal marking, b. Modernization, expansion and reconstruction of intersections to the required capacity by the necessary elements of the monitorngu, motion detection and control, as well as traffic lights, Cd. point II.2.7) lack of space The ordering party waives the determination of this condition of participation in the proceedings. Due to the lack of space in the advertisement: Cd. point II.2.11) Scope 1 - Operational support of the Intelligent Transport Management System created as part of the implementation of STAGE I of the subject of the contract for a period of 12 months. Scope 2 Maintenance of the Intelligent Transport Management System created as part of the implementation of STAGE I of the subject of the contract for a period of 36 months Description of the subject of the order covering Stage II Scope 1 and Scope 2 was specified in detail in the Agreement and Annex No. 3 to PFU. "Scope of maintenance activities (optional scope indicated in the SIWZ)". Stage II was marked in this orderand as an optional range, it will be implemented only after the selection of the most advantageous offer by the Employer and after expressing such will by the Employer. The Contracting Authority anticipates that the seizure of the abovementioned position (will) will depend on the size of financial resources which the Employer will have at the time of the contract and will take place within 90 days before the planned start of implementation of Etapu II. The right of the option is the Employer's authority, from which he may or may not benefit from the implementation of this order. If the Ordering Party uses the right option, the Contractor shall be obliged to execute the order to the extent specified by the Ordering Party (Scope 1 and / or Scope 2). If the Employer does not use the option, the Contractor's options do not applythey have no claims in this respect. The prerequisite for the option right to be exercised is that the Employer submits a declaration of will in writing under pain of nullity regarding the exercise of the right of option within the scope defined by him (Scope 1 and / or Scope 2). Due to lack of space in the advertisement: list of documents 9 . In order to assess whether the contractor relying on the abilities or situation of other pentities under the terms specified in art. 22a upzp, will have the necessary resources to the extent that allows proper implementation of the public order and assess whether the relationship between the contractor and these entities guarantees real access to their resources, the contracting authority requests documents, in particular: 1) scope of the contractor's resources of another entity ; 2) the manner of using the resources of another entity, by the contractor, while performing the public order; - 3) scope and period of participation of another entity when performing the public order; 4) whether the entity, on the capacities the contractor relies with regard to the conditions of participation in the proceedings regarding education, professional qualifications or experience, carry out construction works orservants whose indicated capacities relate. In order to confirm compliance with the conditions of participation in the proceedings, the Employer, in accordance with the provisions of art. 26 par. 1 u.p. will call the Contractor whose offer has been rated the most, to submit the documents (declarations) specified in the period not shorter than 10 days, referred to in this clause 9. 10. List of statements or documents submitted bythe contractor in the proceedings in order to demonstrate meets the conditions for participation in the proceedings: 1) Single European Order Document submitted with the offer, 2) Annex No. 3 List of persons who will participate in the execution of the order together with a statement on formal education and professional qualifications submitted to summons in accordance with art. 26 par. 1 u.p., 3) attachment no. 4 List made forpond together with documents confirming their proper execution submitted on request in accordance with art. 26 par. 1 p.p., 4) Attachment No. 6 Obligation of the third party to place at the disposal of the Contractor the necessary resources for the execution of the order (in the case referred to in Article 22a of the CC) submitted with the offer. The Contracting Entity waives the determination of this condition of participation insubject proceedings. Due to the lack of space in the advertisement: 2. In order to demonstrate the absence of grounds for exclusion from the procurement procedure in the circumstances referred to in Article 24 sec. 1 item 12-23 u.p. and art. 24 sec. 5 point 1 8 p.p., .p., the Ordering Party requests submission of the following documents: 1) information from the National Criminal Register in the scope specified in art. 24 sec. 1 pkt 13, 14 and 21 p.p. and, regarding the conviction for a prison sentence, to the extent specified by the ordering party under art. 24 sec. 5 points 5 and 6 against the background, issued not earlier than 6 months before the deadline for submitting bids or applications for admission to participate in the proceedings. The Ordering Party in accordance with the provisions of art. 26 par. 1 u.p. call the Contractor whose offer has beenhighest rated, to submit this document in a specified period, not shorter than 10 days; 2) certificate of the competent head of the tax office confirming that the contractor is not in arrears with payment of taxes, issued not earlier than 3 months before the deadline for submission of offers or applications for admission to participate in the proceedings, or another confirmation document, that the contractor concluded an agreement with the competent tax authority regarding the repayment of such receivables with possible interest or fines, in particular obtained legally permissible, postponement or payment of overdue payments or suspension of the execution of the decision of the competent authority in accordance with the provisions of Art. 26 par. 1 u.p. call the Contractor whom he offersthis was the highest rated, to submit this document in a specified period of time not shorter than 10 days; 3) a certificate from the relevant organizational unit of the Social Insurance Institution or Agricultural Social Insurance Fund or other document confirming that the contractor is not in arrears with paying social security contributions or health, issued not inlater than 3 months before the deadline for submitting bids or applications for admission to participate in the procedure, or other document confirming that the contractor has concluded an agreement with the competent authority regarding the repayment of these receivables with possible reductions or fines, in particular obtained the legally required exemption, postponing or spreading overdue payments into installments orsuspension of the execution of the decision of the competent authority in full in accordance with the provisions of art. 26 par. 1 u.p. call the Contractor whose offer has been rated the most, to submit this document in a specified period, not shorter than 10 days; 4) In order to confirm the absence of grounds for exclusion under Art. 24 sec. 5 point 1 p.p.z.p. The contracting authority requests a copy of the relevant regulationsabout the register or from central records and information about economic activity, if separate regulations require an entry in the register or records - the Ordering Party in accordance with the provisions of art. 26 par. 1 u.p. will call the Contractor whose offer has been rated the most, to submit this document in the specified, not shorter than 10 days, period 5) the contractor's statement that the offer has not been issued to himan adjudicial court decision or a final administrative decision on default of taxes, fees or social security or health insurance premiums or - in the event of such a verdict or decision - documents confirming payment of such claims together with any interest or fines or a binding agreement on repayments of these receivablesin accordance with the provisions of Article 26 par. 1 u.p. call the Contractor whose offer has been rated the most, to submit this document in a specified period, not shorter than 10 days; Cd. below in III.1.2) 6. In case of any doubts as to the content of the document submitted by the Contractor, the contracting authority may contact the competent authorities of the country in which the contractor is established or locatedIf the person concerned is in the residence or place of residence, provide the necessary information regarding this document. 7. The Contractor having its registered office in the territory of the Republic of Poland, in relation to a person residing outside the territory of the Republic of Poland, which is referred to in the document indicated in Chapter 10 point 2 item 1), submits the document referred toin point 3 lit. a, to the extent specified in art. 24 sec. 1 items 14 and 21 and par. 5 pt. 6 u.p.z.p .. If in the country where the person whose document was to reside is domiciled, such documents are not issued, it is replaced by a document containing a statement of that person submitted to a notary or before a judicial, administrative or self-regulatory or commercial bodyego competent for the place of residence of that person. The provision of paragraph 6, first sentence, applies. 8. In case of any doubts as to the content of the document submitted by the Contractor, the contracting authority may contact the competent authorities of the country in which the person concerned is domiciled, for providing the necessary information regarding this document. 10. The contracting party demands from the contractory, which: a) relies on the abilities or situation of other entities under the principles set out in art. 22a u.p.z.p, submit in respect of these entities the documents listed in Chapter 10 (with the exception of the statement constituting Annexe No. 5 to the ToR); Ordering party in accordance with the provisions of art. 26 par. 1 u.p. call the Contractor whose offer has been rated the highest, to submit documents toreferred to in point 10 (a), in a specified period, not shorter than 10 days. 12. The contractor shall attach to the offer the current statement as at the day of submitting bids in the scope indicated by the ordering party in the specification of essential terms of the order in the form of a Single European Order Document. The information contained in the statement is a preliminary confirmation that the contractor is not subject toexclusion and meets the conditions for participation in the proceedings. The Employer requires that the Contractor who intends to entrust the execution of a part of the orders to subcontractors in order to demonstrate the lack of existence of grounds for exclusion from participation in the procedure has been submitted by Uniform European Order Documents regarding subcontractors. The order will be implemented in the unlimited tender procedure. When orderingy provides for the award of contracts referred to in Article 67 sec. 1 point 6 and 7 p.p. relying on similar supplies, services and a robot worth up to PLN 3, 500, 000 net, ie preparatory works, road industry works, electrical industry works, teletechnical industry works, works related to greenery, design services, IT services, delivery of materials and devicesITS. 2. The size and scope of the order refers to the performance of construction works to be carried out as part of the implementation of the implementation of the Intelligent Traffic Management and Public Transport System in Opole (ITS Opole) "in the" design and build "formula as part of the project entitled. "Improving the functioning of the public transport system and applying solutions to improve road safetywithin the railway station Opole Wschod 3. Conditions on which the order will be awarded: 1) The order will be granted in the case of obtaining additional funds for the implementation of the order consisting in the re-creation of similar works after the written consent of the Ordering Party. Cd. point VI.4.3) Internet address (URL): www.mzd-opole.logintrade.net
The bid deadline for Contract notice: Traffic-monitoring equipment was 26 Aug 2019. Bidding is closed.
This tender has been issued by MIEJSKI ZARZ?D DRÓG W OPOLU in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 34970000 - Traffic-monitoring equipment, 30200000 - Computer equipment and supplies, 30233000 - Media storage and reader devices, 32412100 - Telecommunications network, 32520000 - Telecommunications cable and equipment, 32562000 - Optical-fibre cables, 34928470 - Signage, 34923000 - Road traffic-control equipment, 34942000 - Signalling equipment, 34942100 - Signal posts, 34996000 - Control, safety or signalling equipment for roads, 35262000 - Crossing control signalling equipment, 42961300 - Vehicle location system, 42961000 - Command and control system, 42965000 - Information-processing equipment, 45315100 - Electrical engineering installation works, 45316210 - Installation of traffic monitoring equipment, 45213310 - Construction work for buildings relating to road transport, 45213316 - Installation works of walkways, 45231000 - Construction work for pipelines, communication and power lines, 45233294 - Installation of road signals, 48781000 - System management software package, 48000000 - Software package and information systems, 48151000 - Computer control system, 48813200 - Real-time passenger information system, 48210000 - Networking software package, 48211000 - Platform interconnectivity software package, 51610000 - Installation services of computers and information-processing equipment, 72315000 - Data network management and support services, 63712700 - Traffic control services, 71320000 - Engineering design services, 71322500 - Engineering-design services for traffic installations, 71330000 - Miscellaneous engineering services, 72227000 - Software integration consultancy services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 34903553. The purchaser document reference is 344085-2019.
This tender falls under Materials and Products, Computer Hardware and Software Services, Defence and Security, Technology and Equipment, Construction and Real Estate, Other Services in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.