Contract notice: Thermal power plant construction Tender - 34016953
Tender notice from Poland, published on 20 Jun 2019.
Executive Summary
The PGNIG TERMIKA SA has issued a Tender notice for the procurement of a Contract notice: Thermal power plant construction work in the Poland. This Tender notice was published on 20 Jun 2019 and is scheduled to close on 29 Jul 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 34016953, while the tender notice number is 288174-2019 and Register on the platform.
Key facts
Summary
Contract notice: Thermal power plant construction work
Object of the contract Thermal power plant construction work Description: Contract notice: Thermal power plant construction work Authority Type: Utilities entity Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: Lowest price CPV code: 45251140, 45251140 CPV Description: Thermal power plant construction work. Installation of environmental protection installations on KFA and KFB boilers in Żerań Heat and Power Plant allowing compliance with concentration regimes in accordance with BAT conclusions Reference Number: 19DOZZ148 The subject of the order is comprehensive performance by the Contractor for the Ordering Party for works consisting in adapting two existing production units, boilerfluidized bed with the circulation type OfZ-450, marked KFA and KFB, coal-fired, in the Żerań Heat and Power Plant, to the emission standards in the field of environmental protection required by BAT conclusions. Main Site: Elektrociepłownia Żerań, ul. Modlińska 15, Warsaw, POLAND The subject of the orders includes: construction of DSI installation, dry flue gas desulphurisation to remove acidic compounds HCl, HF and SO2 from flue gases, construction of the SNCR nitric oxide reduction plant, construction of ACI mercury reduction installation, implementation of control systems for installations with the inclusion and expansion of existing DCS boiler systems and common installations, necessary drains, spacers, adjustments related to implemented installations, - supplying of implemented installations with electricity, compressed afterwind and other media necessary for their correct and safe operation. The detailed description of the order is provided in the contract template 19DOZZ148 with attachments. The Contractor will provide the Ordering Party with a copy of the relevant register or Central Register and Information on Business, if separate regulations require entry in the register or register, in order to confirmno grounds for exclusion under Article 24 sec. 5 point 1 of the Act 1. Contractors excluded from the proceedings: - did not show compliance with the conditions for participation in the proceedings, or did not show no grounds for exclusion, - a contractor who is a natural person who has been convicted of a crime: - a) referred to in art. 165a, art. 181 188, art. 189a, art. 218 221, art. 228 230a, art.250a, art. 258 or art. 270, 309 of the Act of June 6, 1997. Penal Code (Journal of Laws, item 553, as amended) or Article 46 or art. 48 of the Act of 25.6.2010 on Sport (Journal of Laws of 2016, item 176), b) of a terrorist character, referred to in art. 115 - 20 of the Act of June 6, 1997. Penal Code, c) treasury, - if a member of its management or supervisory body, a co-sponsor of the Companyand in a public or partnering society or a general partner in a limited partnership or limited joint-stock partnership or a proxy, the final offense referred to in art. 24 sec. 1 point 13 (excluding the conviction of this person for the offense listed in Article 24 (1) (13) d of the Act Article 133 (4) of the Act), - for which a final judgment of the court or final decision of the administration has been issuedthey are about losing taxes, fees or social security or health insurance contributions, unless the Contractor has made payment of taxes due, fees or social security or health insurance contributions with interest or fines, or has entered into a binding agreement regarding the repayment of such claims, - which, as a result of intentional action or gross negligence, he introduced the Ordermisleading in providing information that it is not subject to exclusion, meets the conditions for participation in the procedure or objective and non-discriminatory criteria, hereinafter referred to as "selection criteria", or which has concealed this information or is unable to produce the required documents, - which - as a result of recklessness or negligence has provided misleading information about the Ordering Party, which mayhave a significant impact on the decisions made by the Ordering Party in the procurement procedure, - which unlawfully influenced or attempted to influence the Employer's activities or obtain confidential information that could give him an advantage in the procurement procedure, - who participated in the preparation of the proceedings for granting the order orders or employee, as well as a person who works on pdiscontinues contracts of mandate, work, agency or other contract for the provision of services, took part in the preparation of such proceedings, unless the resulting distortion of competition can be eliminated in other ways than by excluding the Contractor from participation in the proceedings, - which - with other Contractors included an agreement aimed at distorting competition between Contractors in the ou proceedingsdividing the order, which the Purchaser is able to demonstrate by means of appropriate evidence, - being a collective entity, for which the court has ruled that the application for public orders should be prohibited, - for which a preventive measure was ordered to apply for public orders, - Contractors who, belonging to the same capital group, have submitted separate offers, offers, unlessthat they show that the interrelations between them do not lead to distortion of competition in the procurement procedure, - in relation to which the liquidation was opened or whose bankruptcy was announced, with the exception of the Contractor who, after the bankruptcy, concluded an agreement approved by a final court order. contractors may apply for contractors who: a) are in a situationeconomically, i.e. they will show an average yearly income of at least PLN 50, 000, 000.00 (fifty million Polish zlotys) for the last 3 financial years, and if the period of activity is shorter, this is the average annual income for that period; b) they are in a financial situation, i.e. they prove themselves to have their own financial resources or creditworthiness of the above-mentionednot less than PLN 30, 000, 000.00 (in words: thirty million zlotys) or the equivalent of this amount in another currency. Minimum level of possibly required standards: annual average income. The Contractor will show on the basis of the "Profit and Loss Account" part of the financial report (item "Net income from sales of products, goods and materials" or "Net income from sales andThe average annual revenue is the sum of revenues from the last 3 financial years divided by 3, and if the period of conducting business is shorter, the average annual revenue is the total revenue of the companies. from this period divided by the number of years corresponding to thesehis period. If the income is given in foreign currencies, the Employer will recalculate them according to the average NBP rate of Table A announced on the day the invitation to publish was sent for publication in the Official Journal of the European Union. If the exchange rate of this currency is not published by the National Bank of Poland on the day referred to above, the Ordering Party shall apply the average exchange rate of that currency bystatnie announced by the National Bank of Poland before the abovementioned date. In the case of Contractors who show the amount of own funds or creditworthiness in a currency other than PLN, the average currency conversion rate per PLN published by the National Bank of Poland (NBP) valid on the day of issuing information by the bank. In the case of Contractors applying jointly for grantede orders, to check the fulfillment of the above condition, amount of financial resources or creditworthiness of Contractors jointly submitting the offer are added up. Ordering on the basis of art. 24aa paragraph 1 of the Public Procurement Law, will first evaluate the offers and then examine whether the contractor, whose offer has been evaluated as the most advantageous, is not subject to exclusion and meets the conditions for participation in the procedure. The offer under pain of nullity should be made in electronic form and submitted via the Bidding Platform at https://termika.eb2b.com.pl/. The offer, together with all attachments, is submitted in electronic form with a qualified electronic signature or a copy certified for compliance with the original by submitting a qualified electronic signatureby the Contractor. All documents prepared in a foreign language must be submitted together with the translations into Polish. The offer with attachments must be signed by the person / s authorized to represent the Contractor. Authorization (power of attorney) to sign the offer should be attached to the offer, unless it results from other documents attached by the Contractor. Providing your offerThe Contractor accepts in full and without reservations the terms of order execution specified in the Terms of Reference (hereinafter referred to as "SIWZ") with all attachments being its integral part. For preliminary confirmation that the Contractor is not subject to exclusion and meets the conditions for participation in the procedure The Contractor shall enclose to the offer valid as of the day of submittingia offers a statement in the form of a single document available in an editable form and the file "19DOZZ148-espd-request.xml" posted on the tender platform at https://termika.eb2b.com.pl/ Wykonawca, which refers to the resources of other entities, in order to demonstrate the absence of grounds for exclusion and fulfillment to them, to the extent that they invoke their resources, participation in the proceedings, submits in electronic form also uniform documents concerning these entities, signed by the entity whose documents relate. In the case of joint application for contractors, the single document shall be submitted electronically to each of the contractors jointly applying for ordering. These documents confirm the fulfillment ofand the lack of grounds for exclusion to the extent that each of the contractors demonstrate compliance with the conditions for participation in the proceedings and no grounds for exclusion. The Contracting Authority calls a meeting of Contractors (local vision of the place of future work, which will take place on 9.7.2019 in the EC Żerań in Warsaw at Modlińska 15. Meeting at 10:00 am at the porter's lodge. Participation in the visionand local is not mandatory. Internet address (URL): www.termika.pgnig.pl
The bid deadline for Contract notice: Thermal power plant construction work was 29 Jul 2019. Bidding is closed.
This tender has been issued by PGNIG TERMIKA SA in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45251140 - Thermal power plant construction work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 34016953. The purchaser document reference is 288174-2019.