Contract notice: Thermal power plant construction Tender - 33346834
Tender notice from Poland, published on 28 May 2019.
Executive Summary
The PGNIG TERMIKA SA has issued a Tender notice for the procurement of a Contract notice: Thermal power plant construction work in the Poland. This Tender notice was published on 28 May 2019 and is scheduled to close on 10 Jun 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 33346834, while the tender notice number is 248342-2019 and Register on the platform.
Key facts
Summary
Contract notice: Thermal power plant construction work
Object of the contract Thermal power plant construction work Description: Contract notice: Thermal power plant construction work Authority Type: Utilities entity Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: Lowest price CPV code: 45251140, 45251140 CPV Description: Thermal power plant construction work. Replacement of an electrostatic precipitator on the bag filter with its equipment and associated installations on the flue gas system of block No. 11 in the Siekierki Power Plant Reference Number: 19DOZZ193 The subject of the order is the modernization of the boiler gas system No. 11 (K11) in the EC Siekierki replacing an existing electrofilter with a bag filterwith devices and accompanying installations on the above exhaust system. Main Site: Siekierki Combined Heat and Power Plant, ul. Augustowka 30, Warszawa, POLAND The subject of the order is the modernization of the flue gas system of the block boiler No. 11 (K11) at the Siekierki EC, which consists in replacing the existing electrofilter with a filter bag along with devices and accompanying installations on the above exhaust system. Subject SubjectThe contractor will perform according to the "turnkey" formula, in accordance with the technical documentation prepared by the Contractor and agreed with the Ordering Party. "Turnkey" formula means comprehensive performance by the Contractor of all works in all industries, to implement the subject of the Agreement and ensure its operation in accordance with the conditions resulting from the Contract, including the performance of preparatory work (i.e.fencing the workplace, inventory, dismantling and assembly as well as temporary and other installations), construction design and technical documentation in all industries, obtaining and providing to the Employer the necessary permits and administrative decisions, complete construction works (disassembly, assembly, construction works) and digital system, providing allmaterials, equipment and devices necessary to carry out the works, making the necessary spacers and demolition, carrying out all transport work, utilization of waste resulting from the work, commissioning and regulation of the modernized K11 boiler exhaust system and execution of all necessary accompanying robot (eg diagnostics, control quality) and finishing, zarboth those included and not included in the tender materials and the submitted offer ensuring completeness of works and readiness of the modernized K11 boiler exhaust system for operation. The detailed description of the order is included in the contract template 19DOZZ193 with attachments. The Contractor will submit to the Ordering Party a copy of the relevant register at his request or from Central Recordsi and Information about Economic Activity, if separate regulations require an entry in the register or records, in order to confirm the absence of grounds for exclusion under Art. 24 sec. 5 point 1 of the Act 1. Contractors are excluded from the proceedings who: - have not demonstrated fulfillment of the conditions for participation in the proceedings, or have not demonstrated no grounds for exclusion, - a contractor who is a natural person, whosewas convicted for a crime: a) referred to in art. 165a, art. 181 188, art. 189a, art. 218 221, art. 228 230a, art. 250a, art. 258 or art. 270-309 of the Act of June 6, 1997. Penal Code (Journal of Laws item 553, as amended) or art. 46 or art. 48 of the Act of 25.6.2010 on Sport (Journal of Laws of 2016, item 176), b) of a terrorist character, referred to in art. 115 - 20 of the Act of 6.6.1997 Penal Code, - c) treasury, - if a member of its management or supervisory body, a partner of a company in a registered partnership or partnership or a general partner in a limited partnership or limited joint-stock partnership or proxy, have been convicted of the offense referred to in art. . 24 sec. 1 point 13 (excluding the conviction of this person for the offense listed in Article 24 paragraph 1 point13 lit. d Acts of art. 133 ust. 4 of the Act), - against which a final court judgment or final administrative decision has been issued on the payment of taxes, fees or social security or health insurance premiums, unless the Contractor has made payments of taxes, fees or social security or health insurance contributions with interest. or fines or have a binding contracthe / she is responsible for the repayment of such receivables, - who, as a result of intentional action or gross negligence, misleads the Customer in providing information that he is not subject to exclusion, meets the conditions for participation in the proceedings or objective and non-discriminatory criteria, hereinafter referred to as "selection criteria", or which He has hidden this information or is unable to provide the required documentationentow, - which, as a result of carelessness or negligence, provided information that misleads the Ordering Party, which may have a significant impact on the decisions made by the Ordering Party in the procurement procedure, - which unlawfully influenced or attempted to influence the Employer's actions or obtain confidential information that could give him an advantage in the procurement procedure, - whichhe participated in the preparation of the procurement procedure or whose employee, as well as the person performing work on the basis of a mandate contract, contractor, agency or other contract for the provision of services, participated in the preparation of such proceedings, unless the resulting distortion of competition can be eliminated in other way than by excluding the Contractor from participation in the proceedings, - which with other Contractors has concluded an agreement aimed at distorting competition between Contractors in the proceedings for the award of the contract, which the Purchaser is able to demonstrate by means of appropriate evidence, - a collective entity, for which the court has ruled that it is prohibited to apply for public orders, - for which a preventive measure was ordered as a preventive measureo for public orders, - Contractors who, while belonging to the same capital group, submitted separate offers or offers, unless they prove that the interconnections between them do not lead to distortion of competition in the procurement procedure, - in relation to which the liquidation was opened or whose bankruptcy was announced, with the exception of the Contractor who signed the agreement after the bankruptcy was announced Contractors, who are: a) are in the economic situation, ie they have an average yearly income of at least PLN 60, 000, 000.00 (in words: sixty million Polish zlotys) for the period of the last 3 years, and if the period of activity is shorter, this is the average annual income for this period b) they are in financial position, i.e. they have proven that they have their own financial resources or creditworthiness in the amount not less than PLN 20, 000, 000.00 (in words: twenty million zlotys) or the equivalent amount in another currency. Minimum level of possibly required standards : Average annual income The Contractor will show on the basis of the "Profit and Loss Account" of the part of the reportfinancial support (the item "Net revenue from the sale of products, goods and materials" or "Net revenue from sales and matched with them") or in the case of Contractors not obliged to prepare the abovementioned documents, other documents defining turnover and liabilities. The average annual revenue is the sum of revenues from the last 3 financial years divided by 3, and if the period of conducting the departmentis shorter, the average annual revenue is the sum of revenues from this period divided by the number of years corresponding to this period. If the income is given in foreign currencies, the Employer will recalculate them according to the average NBP rate of Table A announced on the day the invitation to publish was sent for publication in the Official Journal of the European Union. In the absence of publicationIn the day referred to above, the Employer will apply the average exchange rate of the currency recently announced by the National Bank of Poland before the abovementioned date. In the case of Contractors who show the amount of own funds or creditworthiness in a currency other than PLN, the average currency conversion rate per PLN announced by the National Bank of Poland (National BankPoland) in force on the day the information is issued by the bank. In the case of Contractors applying jointly for the award of a contract, to check whether the above-mentioned Condition, amount of financial resources or creditworthiness of Contractors jointly submitting the offer are added up. Before the initiation of the proceedings, a technical dialogue referred to in Art. 31a paragraph 1 of the Act on the right of orderpublic. The contracting authority set a shortened deadline for submission of offers 15 days on the basis of art. 43 par. 2b point 2) of the Public Procurement Law, due to the fact that there is an urgent need to award the contract and shorten the deadline for submitting offers is justified. In the previously conducted proceedings, the Awarding Entity did not select the most advantageous tender and annulled the proceedings and the upcomingthe date of entry into force of the BAT conclusions prevents re-litigation being carried out within a statutory period. In addition, the shortening of the deadline for submitting bids is justified by the fact that the conditions for participation in the procedure and the scope of the order did not change significantly compared to those determined in the annulled proceedings 18DOZZ516, which was conducted under an open tender procedure.o in accordance with the Public Procurement Law Procuring pursuant to art. 24aa paragraph 1 of the Public Procurement Law, it will first evaluate the offers and then examine whether the contractor whose tender was rated as the most advantageous is not subject to exclusion and fulfills the conditions for participation in the procedure. address https: //termika.eb2b.com.pl/. The offer, together with all attachments, is submitted in an electronic form with a qualified electronic signature or a copy certified for compliance with the original by submitting a qualified electronic signature by the Contractor. All documents prepared in a foreign language must be submitted together with the translations into Polish. Offer with zthe connectors must be signed by the person / s authorized to represent the Contractor. Authorization (power of attorney) to sign the offer should be attached to the offer, unless it is clear from other documents attached by the Contractor. By submitting your tender, the Contractor accepts in full and without reservation the terms of the order specified in the Terms of Reference(hereinafter referred to as "SIWZ") together with all attachments constituting its integral part. In order to initially confirm that the Contractor is not subject to exclusion and meets the conditions for participation in the proceedings, the Contractor encloses to the tender a statement in the form of a single document available at the date of submitting bids in an editable form and the file "19DOZZ193-espd-request.xml" postedon the tender platform at https://termika.eb2b.com.pl/ Wykonawca, who refers to the resources of other entities, in order to demonstrate the absence of grounds for exclusion and compliance with them, to the extent that they refer to their resources, the conditions for participation in the proceedings, shall also submit in electronic form uniform documents relating to these entities, signed bythe subject of which the documents relate. In the case of joint application for contractors, the single document shall be submitted electronically to each of the contractors jointly applying for the order. These documents confirm the fulfillment of the conditions for participation in the proceedings and the lack of grounds for exclusion to the extent that each of the contractors demonstrates compliance with the conditions of participationin the proceedings and no grounds for exclusion. The Contracting Authority calls a meeting of Contractors (local vision of the place of future work, which will take place on 31.5.2019 at EC Siekierki in Warsaw at Augustowka Street 30. Meeting at 10:00 am at the porter's lodge. Participation in a local vision is not mandatory. Internet address (URL): www.termika.pgnig.pl
The bid deadline for Contract notice: Thermal power plant construction work was 10 Jun 2019. Bidding is closed.
This tender has been issued by PGNIG TERMIKA SA in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45251140 - Thermal power plant construction work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 33346834. The purchaser document reference is 248342-2019.