Expired Tender Poland ICB TOT Ref. 30472255

Contract notice: Thermal power plant construction Tender - 30472255

Tender notice from Poland, published on 07 Feb 2019.

Executive Summary

The PGNIG TERMIKA SA has issued a Tender notice for the procurement of a Contract notice: Thermal power plant construction work in the Poland. This Tender notice was published on 07 Feb 2019 and is scheduled to close on 18 Mar 2019, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 30472255, while the tender notice number is 060953-2019 and Register on the platform.

Key facts

Summary
Contract notice: Thermal power plant construction work
TOT Ref. No.
30472255
Document Ref. No.
060953-2019
Country
Poland
Notice type
Tender
Competition
ICB
Publication date
07 Feb 2019
Bid deadline
18 Mar 2019
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Thermal power plant construction work
Description: Contract notice: Thermal power plant construction work
Authority Type: Utilities entity
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: Lowest price
CPV code: 45251140, 45251140
CPV Description: Thermal power plant construction work.
Replacement of an electrostatic precipitator on a bag filter with its equipment and accompanying installations on the flue gas system of block No. 11 in Siekierki - Reference Number: 18DOZZ516
The subject of the order is the modernization of the boiler gas system No. 11 (K11) in EC Siekierki replacing an existing electrofilter with a bag filterwith devices and accompanying installations on the above exhaust system.
Main Site: Siekierki Combined Heat and Power Plant, ul. Augustowka 30, Warszawa, POLAND
The subject of the order is the modernization of the flue gas system of the block boiler No. 11 (K11) at the Siekierki EC, which consists in replacing the existing electrofilter with a filter bag along with devices and accompanying installations on the above exhaust system
Subject ZamoThe contractor will perform according to the "turnkey" formula, in accordance with the technical documentation prepared by the Contractor and agreed upon. "Turnkey" formula means comprehensive performance by the Contractor of all works in all industries, to implement the subject of the Agreement and ensure its operation in accordance with the conditions resulting from the Agreement, including the execution of preparatory works (ie infencing the workplace, inventory, dismantling and assembly as well as performing temporary and other installations), building design and technical documentation in all industries, obtaining and providing the Employer with necessary permits and administrative decisions, complete construction works (disassembly, assembly, construction works) and digital system, delivery of licematerials, equipment and devices necessary to carry out the work, making the necessary spacers and demolition, carrying out all transport work, utilization of waste resulting from the work, commissioning and regulation of the modernized K11 boiler exhaust system and all necessary auxiliary works (eg diagnostics, control quality) and finishing, zarothose included as well as those not included in the tender materials and the submitted offer ensuring completeness of works and readiness of the modernized K11 boiler exhaust system for operation.
The detailed description of the order is included in the contract template 18DOZZ516 with attachments.
The Contractor will provide the Ordering Party with a copy of the relevant register at his request or from central recordsand information about business activities, if separate regulations require an entry in the register or records, in order to confirm the absence of grounds for exclusion under Art. 24 sec. 5 point 1 of the Act
1. Contractors are excluded from the proceedings who: - have not demonstrated fulfillment of the conditions for participation in the proceedings, or have not demonstrated no grounds for exclusion, - a contractor who is a natural person, whosewas convicted for a crime:
a) mentioned in art. 165a, art. 181 188, art. 189a, art. 218 221, art. 228 230a, art. 250a, art. 258 or art. 270, 309 of the Act of June 6, 1997. Penal Code (Journal of Laws, item 553, as amended) or Article 46 or art. 48 of the Act of 25.6.2010 on sport (Journal of Laws of 2016, item 176),
b) of a terrorist character, referred to in art. 115 - 20 of the Act of 6.6.1997th Penal Code, - c) treasury, - if a member of its management or supervisory body, a partner of the company in a registered partnership or partnership or a general partner in a limited partnership or limited joint-stock partnership or proxy, convicted for an offense referred to in Article . 24 sec. 1 point 13 (excluding the conviction of this person for the offense listed in Article 24 paragraph 1 point13 lit. d Acts of art. 133 ust. 4 of the Act), - against which a final court judgment or final administrative decision has been issued regarding the payment of taxes, fees or social security or health insurance premiums, unless the Contractor has made payments of taxes, fees or social security or health insurance contributions with interest. or fines or included binding agreementsproperty regarding repayment of such receivables, - which, as a result of intentional action or gross negligence, misleads the Employer when submitting information that it is not subject to exclusion, meets the conditions for participation in the proceedings or objective and non-discriminatory criteria, hereinafter referred to as "selection criteria", or which he has hidden this information or is unable to provide the required documentsntow,
- which as a result of recklessness or negligence presented misleading information ordering, which may have a significant impact on decisions taken by the Ordering Party in the procurement procedure, - which unlawfully influenced or attempted to influence the Employer's actions or obtain confidential information that could give him an advantage in the procurement procedure,
- whichhe participated in the preparation of the procurement procedure or whose employee, as well as the person performing work on the basis of a mandate contract, contractor, agency or other contract for the provision of services, participated in the preparation of such proceedings, unless the resulting distortion of competition can be eliminated in other way than by excluding the Contractor from participation in the proceedings,
-which with other Contractors has concluded an agreement aimed at distorting competition between Contractors in the proceedings for the award of the contract, which the Purchaser is able to demonstrate by means of appropriate evidence, - a collective entity, for which the court has ruled that it is prohibited to apply for public orders, against which the prohibition of applying was declared as a preventive measurefor public orders,
- Contractors who, in the same capital group, submitted separate offers, offers, unless they show that the interconnections between them do not lead to distortion of competition in the procurement procedure, - in relation to which liquidation was opened or which bankruptcy was announced, with the exception of the Contractor who, after the bankruptcy, concluded the approval agreement
Contractors, who are:
a) are in the economic situation, ie they have an average annual income of at least PLN 90, 000, 000.00 (in words: ninety million Polish zlotys) for the award of the order. the last 3 financial years, and if the period of activity is shorter, this is the average annual income for this districtes
b) they are in financial position, i.e. they show that they have their own financial resources or creditworthiness in the amount not less than PLN 40, 000, 000.00 (in words: forty million zlotys) or the equivalent of this amount in another currency.
Minimum level possibly required standards:
Average annual income The Contractor will show on the basis of the "Profit and loss account" of the part of the disputefinancial statements (the item "Net income from the sale of products, goods and materials" or "Net revenue from sales and matched with them") or in the case of Contractors not obliged to prepare the abovementioned documents, other documents defining turnover and liabilities. The average annual revenue is the sum of revenues from the last 3 financial years divided by 3, and if the period of employmentIt is shorter, average annual revenue is the sum of revenues from this period divided by the number of years corresponding to this period. If the income is given in foreign currencies, then the Employer will recalculate them according to the average NBP rate of Table A announced on the day of sending the notice of procurement for publication in the Official Journal of the European Union. In the absence of publifor the currency of the National Bank of Poland on the day referred to above, the Employer will apply the average exchange rate of the currency recently announced by the National Bank of Poland before the abovementioned date.
In the case of Contractors who show the amount of own funds or creditworthiness in a currency other than PLN, the average currency conversion rate per PLN announced by the National Bank of Poland (National Bank Polski) valid on the day the information is issued by the bank. In the case of Contractors applying jointly for the award of a contract, to check whether the above-mentioned condition, amount of financial resources or creditworthiness of Contractors jointly submitting the offer are added up.
Ordering on the basis of art. 24aa paragraph 1 of the Public Procurement Law, will first evaluate the offers, and then examine whether to performca, whose offer has been evaluated as the most advantageous, is not subject to exclusion and meets the conditions for participation in the proceedings. * The offer under pain of nullity should be prepared in electronic form and submitted via the Bidding Platform at https://termika.eb2b.com.pl/ . The offer, together with all attachments, is submitted in electronic form bearing a qualified sub-clausee-mail or a copy certified as a true copy by submitting a qualified electronic signature by the Contractor. All documents prepared in a foreign language must be submitted together with the translations into Polish.
The offer with attachments must be signed by the person / s authorized to represent the Contractor. Authorization (power of attorney) to sign offrts should be attached to the offer, unless it is clear from other documents attached by the Contractor.
Providing its tender, the Contractor accepts in full and without reservation the terms of ordering specified in the Terms of Reference (hereinafter referred to as "SIWZ") with all attachments being its integral part.
In order to pre-confirm that the contractawca is not subject to exclusion and meets the conditions for participation in the proceedings, the Contractor encloses to the offer valid on the day of submitting offers a declaration in the form of a single document available in an editable form and the file "18DOZZ516-espd-request.xml" posted on the tender platform at https:// termika.eb2b.com.pl/
Wykonawca, who refers to the resources of other entities, in order tosermons of absence of grounds for exclusion and fulfillment in the scope in which they refer to their resources, conditions for participation in proceedings, submit in electronic form also uniform documents relating to these entities, signed by the entity to which the documents relate. jointly applying for orders by contractors, the single document is submitted in originaleach of the contractors jointly applying for the order should be sent in electronic form. These documents confirm the fulfillment of the conditions for participation in the proceedings and the lack of grounds for exclusion to the extent that each of the contractors demonstrate compliance with the conditions for participation in the proceedings and no grounds for exclusion. The Contracting Authority convenes a meeting of Contractors (a local vision of the place of future work), whichwill take place on 26/02/2019 at the EC Siekierki in Warsaw at ul. Augustowka 30.
Meeting at 10:00 at the porter's lodge. Participation in a local vision is not mandatory.
Internet address (URL): www.termika.pgnig.pl

Documents

Tender Notice
Login to view

Similar tenders

Poland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Thermal power plant construction work was 18 Mar 2019. Bidding is closed.

This tender has been issued by PGNIG TERMIKA SA in Poland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45251140 - Thermal power plant construction work.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 30472255. The purchaser document reference is 060953-2019.

See the Similar Tenders section on this page or browse other tenders from Poland.

This tender falls under Construction and Real Estate in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.