Contract notice: Textile badges Tender in Poland - 20149506
Tender notice from Poland, published on 30 Jan 2018.
Executive Summary
The 2 REGIONALNA BAZA LOGISTYCZNA has issued a Tender notice for the procurement of a Contract notice: Textile badges in the Poland. This Tender notice was published on 30 Jan 2018 and is scheduled to close on 12 Mar 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 20149506, while the tender notice number is 038849-2018 and Register on the platform.
Object of the contract Textile badges Description: Contract notice: Textile badges Authority Type: Other Contact Nature: Supplies Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 39561132, 39561132, 39561132, 39561000, 18452000, 39561141 CPV Description: Textile badges. Tulle, lace, narrow-woven fabrics, trimmings and embroidery. Safety pins. Braids. Delivery of uniforms and equipment items in 2018 (signs of degrees, sheaths, cufflinks, gala cords) Reference Number: D / 11/2018 1. The subject of the order is the delivery of the items of uniforms and equipment in 2018 (signs of the beret degrees, signs of the navy's grades to the jacketprotective clothing, signs of the exit jacket and terrestrial winds, signs of the exit jacket and air-force winds, signs of the outer jacket and navy wind, sheaths with embroidered signs of air-force sweater, navy cuff links, air force cuffs, pins of ground troops, navy cufflinks (D), cufflinks afterwindy (D), ground army clip (D), army gala gang guard and air force, gala rope non-commissioned NCO and air force, naval officer galaxy rope) divided into 15 parts (quests) Main Site: Detailed schedule implementation and delivery locations are included in the "Supply plan for equipments and equipment in 2018", whichAnnex 1 to the contract template. The subject of the order is the delivery of signs to berets in the amount of: 94 400 pcs. Requirements and details of the order are specified in Annexes 1, 9 and 10 to the ToR. to this extent, any requirements that the Contractor is required to demonstrate in a special way. The Contracting Authority will consider that the condition has been metif the contractor has financial resources or creditworthiness. • The contracting authority requests information from the bank or cooperative savings and credit union confirming the amount of funds held or the creditworthiness of the contractor in a period not earlier than one month before the deadline for submission of tenders. maybe to confirm fulfillmentthe conditions for participation in the procedure, in appropriate situations and with regard to a specific order, or a part thereof, rely on the technical or professional capacity or financial or economic situation of other entities, regardless of the legal nature of its legal relationship - pursuant to Art. 22a paragraph 1. In the listed cases, the contractor who relies on the abilities-or the situation of other entities, he must prove to the orderer that while performing the order, he will have the necessary resources of these entities, in particular by presenting the obligation of these entities to provide him with the necessary resources for the order (Article 22a paragraph 2). depends on the economic and financial situation of other entities, it responds with solidityarnie with the entity that committed to provide resources, for damage suffered by the orderer resulting from not sharing these resources, unless for not sharing resources is not at fault. To assess whether the contractor relying on the abilities or the situation of other entities under the principles set out in Article . 22a of the Act, will have the necessary resources to the extent enablingproper implementation of the public order and assessment of whether the relationship between the contractor and these entities guarantees effective access to their resources, the contracting authority requests: 1) In the case of a condition regarding the economic or financial situation, the document referred to above, ie information from a bank or cooperative savings bank -credit confirming the amount of funds held for in-house creditworthiness or the creditworthiness of the contractor, in the period not earlier than one month before the deadline for submission of tenders 2) Contractor's statements specifying: a) Scope of available contractor resources of another entity, b) Method of using resources of another entity, by the contractor, when executing the order, c) Scope and period of participation of another entity when performing public orderNote. In the case of the value of financial assets held in a different currency, the ordering party, in order to assess the fulfillment of the abovementioned condition, it will convert these values according to the exchange rate on the day of publication of the contract notice on the basis of the NBP Average Rate Table published on the website: http: //www.nbp.pl/home.aspx c = / ascx / archa.ascx 1. The public can order a public ordercontractors who meet the conditions for participation in the proceedings (described in section III.1.2) and III.1.3) of this announcement) and demonstrate no grounds for exclusion due to failure to meet the conditions set out in Article 24 sec. 1 point 12-23 and in art. 24 sec. 5 point 1 and in art. 24 sec. 5 points 8 Public Procurement Laws 2. In order to confirm the fulfillment of the conditions for participation in the proceedings and demonstratedia lack of grounds for exclusion The Contracting Party requires enclosing the Statement in the form of a Uniform European Order Document (EAT) - the details regarding the submission of the statement on EED are described in Chapter VII, point. 1.1 SIWZ. 3. In order to demonstrate the absence of grounds for exclusion, the contracting authority requires submission of documents and statements referred to in Chapter VII, point 2.4.1- 2.4.8 SIWZ (in accordance with -5 point 1- 6, 9 and 10 of the Regulation of the Minister of Development on the types of documents that the Employer may request from the Contractor in the procurement procedure). 4. The statement referred to in Chapter VII, point 2.4.8 of the SIWZ, ie the information about the affiliation to the capital group, the contractor submits to the orderer, within 3 days of posting on the websitej information from the opening of offers. The ordering party will make the declaration form constituting Annex 4 to the ToR on the day of publishing the information from the opening of the offers. • The contracting authority will call the contractor whose tender was the highest rated to submit within the prescribed period, not shorter than 10 days, valid as of the day of submitting the declarations and documents referred to in Chapter VIAnd in point 2.4.1.-2.4.7. SIWZ. 5. The orderer requests a bid bond. Detailed information on the tender bond is set out in Chapter IX of the ToR and the individual parts of this announcement. 6. The ordering party does not anticipate the orders referred to in art. 67 sec. 1 point 6 and 7 Public Procurement Law. 7. The orderer informs that the description of the criteria and their weights as well as the manner of bid evaluation has been specified in detail in-Chapter XIV of the ToR. 8. The Contracting Party requests the performance of a performance bond to cover claims arising from non-performance or improper performance of the contract in the amount of 5% of the gross price specified in the offer. Detailed information on the security is set out in Chapter XVI of the ToR. 9. The Contracting Party reserves the right to change the content of the contract pursuant to Article 144 of the PPL Act. Detailed information on changes to the content of the contract are set out in Chapter XVIII of the ToR and in Annex 6 to the Terms of Reference (model contract). 10. The calculations between the contracting authority and the contractor will be conducted in Polish zlotys. 11. According to art. 25 ust. 1, point 2 of the Act of 29.1.2004 Pzp, the contracting authority requires that the Contractors demonstrate conformity of the delivered deliveries with the requirements specified by Zamawiająca: 1) The subject of the order should be consistent with the model of the item (made according to the Military Technical and Technological Documentation), located at the Military Research and Implementation Center of the Uniform Service in Ł-dź - - 13 para. 1 point 3 of the Regulation of the Minister of Development of 26.7.2016 on the types of documents that the contracting authority may request from the contractor in the procedure for thighsgreens orders (Journal of Laws of 2016 item 1126). 2) The contractor should have an implemented quality management system in AQAP 2130 inspection and testing. The Purchaser informs that in confirming that the delivered deliveries meet the requirements specified by the Ordering Party, it requires submission of documents specified in Chapter VII of the ToR. Internet address (URL): http://www.2rblog.wp.mil.pl Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Textile badges was 12 Mar 2018. Bidding is closed.
This tender has been issued by 2 REGIONALNA BAZA LOGISTYCZNA in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 39561132 - Textile badges, 39561000 - Tulle, lace, narrow-woven fabrics, trimmings and embroidery, 18452000 - Safety pins, 39561141 - Braids.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 20149506. The purchaser document reference is 038849-2018.