Contract notice: Test boring work Tender in Hungary - 29586784
Tender notice from Hungary, published on 02 Jan 2019.
Exeutive Summary
The NFP — NEMZETI FEJLESZTÉSI PROGRAMIRODA NONPROFIT KORLÁTOLT FELEL?SSÉG? TÁRSASÁG has issued a Tender notice for the procurement of a Contract notice: Test boring work in the Hungary. This Tender notice was published on 02 Jan 2019 and is scheduled to close on 25 Feb 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 29586784, while the tender notice number is 000063-2019 and Register on the platform.
Object of the contract Test boring work Description: Contract notice: Test boring work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45122000, 45120000, 45122000, 45231110, 45232142, 71240000, 76431000, 45122000, 45120000, 45231110, 45232142, 71240000, 76431000 CPV Description: Test-drilling and boring work. Pipelaying construction work. Heat-transfer station construction. Well-drilling services. Zsana tavhő Reference Number: EKR001150492018 KEHOP-5.3 .2-17-2017-00008 Identity, Geothermal Energy-Using Kiskunhalas and Zsanan Targyu, a Producer and a ReturnerDesigner, Executor of Geothermal Heating System and Execution Contractor in the framework of your contractor Main Site: 6411 Zsana, 0192/4 hr. Thermal water reaches the heat station laid down in the heat exchanger, installed in the installed water treatment technology. The heating station must be equipped with a new heater line installed in the new foyer, up to the heat consumption, and new consumer substations must be built. The heat consumed in the project can be found in Kiskunhalas and Zsana telepueles, one in heat cells 20 MW.2 800 fm Pre-insulated Pipe Conduits - NA 50 2 500 fm Pre-insulated Pipe Conduits - NA 65 1 800 fm Pre-insulated Pipe Conduits -NA 80 4 100 fm Insulated Pipe Conduits --NA 100 2 100 fm 3 900 fm Pre-insulated pipe heaters -NA 150 4 800 fm Pre-insulated pipe heaters -NA 200 13 000 fmpiping fittings -NA 350 32 000 fm The complete system must be equipped with a power supply technology and a central heating system. Reverse (2, 000 m above ground): In the GEOTERM-1 test site, 1 100 1 200 m and 1 750 1 800 m of caesoette perforations are located on the 1 850 1 900 m open section of the open-air bileel, with an average of 3%. with cracked porosity. More legal 4 1/2 "or larger, pre-resilient, squeezed insert threads up to 2, 000 m. 2. Producer (2 300 m above the ground): The fura is planned to be up to 1, 200 m long, which is the 9 5/8 "heel of the upper-also-pannon beam (1 150 m). Ferdefurasken, which has been set up from 8 1/2 ". The dolomite roof is out of the bore 6 "-in the productive pile. This section remains open, except when the hole wall loosens in a probatermelet. In this case, a 4 1/2 "resilient pipe for keruel beep is similar to the production tube. 3. Thermal heating station: The thermal heating station is located in the bellows next to the recirculation hose.heat content is discharged to the sprinkler systems to be filled. Main parameters of the heat exchangers: 20 MW full capacity Up to 10% up to max. Max. The heat of the heat exchanger is one-piece Connector karimas 4th Termal drafts: The production site and the re-casting site must be covered by the thermal reservoirs. The flow rate of the flow-through thermal water is suitable for pre-insulated pipes with a 16 bar pipe. The capacity of the returning thermal reservoir is suitable for piping 25 bar.Ravi-re Thermocouples: 140oC Maximal Thermal Water: 400m / h Maximal Aramlas Speed in Pipes: 0.5 to 1.5m / s - Pressure Loss in Piping: 50, 300 Pa / m 5. Low-temperature technology can be created in the consumer compartments of the consumer. Disk heat exchangers must be applied to both heaters and hot water supply. LakeshellsHeat: The heat substation and the sub-stations of the consumers must be covered with heat-treated ponds. Sallito spine guides to Keszuel Kiskunhalas and Zsana, while the telepueles beluel elagazo elaborate.180 m / h Zsanai spine guides: 100 m / h Maximal aramlas velocity in the pipelines: 0.5 1.5 m / s Pressure loss in piping: 50 30 Pa / m Continued: II.2.11 with respect to character string A) Kizaro Causes: You cannot be a scheduler (AT), subordinate, and cannot retrieve a suitable (alc) reader from a host who is a Kbt. The reasons for exclusion set out in Article 62 (1) (2)down under. Kbt. Article 74 (1). (a) and (b) items. The reasons for the expulsion do not apply (koezoes) AT (k) and, where applicable, alk. the proofreading organization must first certify with the unified european coexistence document (EEKD) according to the following: A Kbt. Article 67 (1). base AT or v. reader of the real-life book - the racket is up to datethe grounds for exclusion do not include the declaration contained in the EECD, the person who has the right to represent the right to represent him or herself under section 321/2015 (X. 30.) of the Government (Kr.) II. as described in Chapter 2 of this Guide. The unified european coexistence document (s) must be attached to the newsletter in the EDF. (XII. 19.) Korm. r. (hereinafter referred to as the EDF Regulation), Article 12 (2), and Article 13 of the EDF Regulation. attention to Article 64 and Section 4 (3) of the Cr. (XII. 19.) Government Decree (3), para. in your proof sheet, Kbt. Article 67 (4). based on AT bit must make a statement that it does not take Kbt. Article 62 (1) (2). under the power of the excitement under the umbrella of sub-causes. The Kbt. Article 69 (4) (6). on the basis of the attested AT must certify in accordance with -- 8, 10, 12, 16, h. does not belong to the power of the expulsion of the expulsion causes. In the event of a pending entry, the AT attaches to the newsletter the entry into the agency.ht., a certificate of variation and the certificate issued by the agent (the contents of a negative statement of contents are also inaccurate). A 321/2015. (X. 30.) on the basis of Article 1 (7) of the Government Decree on the grounds for expulsion can be used (used) as long as it is included in the certificates.the content of this data is genuine. The timeliness - until the contrary is proved - the data content of the data is updated by the subscriber in a relevant statement. vegzesere refers to al. : Preliminary proof of the EECD - Kbt. Article 67 (1) (3) and Section 1 (1) of the Cr. and Article 2 (5). correspondingly - AK accepts host (AT, koezoes AT, capacity)t an insurance company) a simple statement that the ECD is sufficient for the IV. grit α point kitoeltese. These documents include the explicit statement of Kbt in this regard by AK, which proves the original proof of proof. Article 69 (4). Based on. The unified european coexistence document (s) must be attached to the schedule in the EDF. His attention comes to his attentiont at 424/2017. (XII. 19.) Cor. (hereinafter referred to as the EDF Regulation) Article 12 (2) and Article 13 of the ECR Regulation. NY.1.) NY.2. Article 69 (11). The registered rake - if Kbt. In Article 69 (11) registries, the free verification of the relevant data and information is free of charge.ncsen mod - the registered extracts, the certificate issued by the leading body of the registered body, or the document of the verbal document of the registered person, can be justified by a simple expedition. Kbt. Article 65 (7), (9) and 69 (11). Folly: III.1.2) Point III.1.1): NY.1.) AT is inappropriate if the epitope isari-builder hosted by Etv. or, in the case of non-Hungarian operators, the country of residence is not registered (presumably the law of the country of establishment is presumed) or in the country of establishment.he does not have a license, legal or organizational or chamber tags (-- 65 (1) c) and 322/2015 (X. 30.) of Government Decree No. 322/2015. NY.2.) Inappropriate AT, if the relevant professional chamber of the country is not listed on the basis of the design services of the designer, or in the case of non-Hungarian economic operators.the country of origin is not registered (presumably the law of the country of establishment is not prescribed) or it does not have a license issued by the domicile in the country of domicile, legal successor or organizational or chamber tags (- 65 (1) (c) of the Kbt. 322/2015. (X. 30.) Government Decree Section 8 (1). The score you give is 0.00 10.00 points in the case of relapse points.Ert. Module: 1) - ar: translated gold, 2.1.2.2 straight gold 2) The schedule must include: - In the newsletter, Article 11 (1) of the EKR Regulation must be based on the appropriate excerpt of the form provided in the EDF. to attach the read-only page to the newsletter - if the person entitled to the note and the person of the co-skeleton has been kennel boobycontains an authorized masolati peldanya contained in the document with the lowest probative value. Article 66 (2), arrow, - The ATK does not have to declare the Kbt on the basis of Article 20 (4) of the EDF Regulation. Section 66 (4), - The Kbt. Article 66 (6). arrow (with negative content) - arrow. the Kbt. Article 65 (7) bwedge. base (with negative content) - artistic aspects alatamasztas (res. KD) - koezoes ATi megallapoda, which contains the records of the KD. 3) AK in the 30th (4). according to Art. 3 (3) of the Cr., section 3 (3) of the Cr. 4) The Kbt. Article 71 (6). considering the hianypotlassal, the subscriber enters a hosts who have not previously been in the magazine. HUF 100 000 000 / ev and min. 50 000 000 HUF / karesemeny forek design and min. HUF 500 000 000 / ev and min. 100, 000, 000 HUF / karesemenye epite-fitting, fel.biz author 6) AK in case of IV.2.6) 2 days in 60 days 7) FACTS: dr. Judit Pete OO353 8) UK applies Kbt. Section (2) (e) of Article 75. 9) AK does not organize the location. (VI.13.) In the KR, the NFP mas proceeds with the KESB in AK. dissolve the fundamentals of the consortium. The authorZsana Geoterm Energy Service and Trading Ltd. has been commissioned by the company since then. 11) AK raises ATK's attention to the fact that, if it diverges from the Jovahagyas plan, they must prove that the implemented investment is able to bring the indicators of the SAO, the author of the contract: UeHG savings (tonnes / ev): 30 302.070; Energy Consumption (GJ / ev): 468, 000, 000; That's itpacitas megujulo energy (MW): 20; 12) The Kbt. With regard to the provisions of Section 135 (12), the Reflection Force expects the attention of the audience to the fact that tamogatasra iranyulo yesyy (palyazati; tamogatasi author-modulated, or variedbailat) filed / won. Awakening Force Gives Adventurers that the tamogatra iranyulo will not accept it or the smallest oessor, if relevant to the Tamogatasi Author's modifications or unacceptable disclaimer, shall be deemed to be a koeruelmenyn for which the timeliness may be relied upon by the author or the author. Above all, the Kbt. Article 53 (6). and Ptk. 6: 116th - (1) basically raises the attention of the Newsletter, hogy it would not be able to disclose the report even if the contractor wishing to negotiate the results of the present contract secured a penzu cover for Tamogatasi's non-keruel, or - if relevant - the modifications of the Tamogatasi Author to non-keruel alairas or to the non-keruel acceptor and the penzuegy not to keruel accepted choice useryou away. It seems that the above-mentioned conditions are exaggerated by the authoritative power of the authoritarian power to be judged in the present case. Internet address (URL): http://www.nfp.hu
The bid deadline for Contract notice: Test boring work was 25 Feb 2019. Bidding is closed.
This tender has been issued by NFP — NEMZETI FEJLESZTÉSI PROGRAMIRODA NONPROFIT KORLÁTOLT FELEL?SSÉG? TÁRSASÁG in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45122000 - Test boring work, 45120000 - Test drilling and boring work, 45231110 - Pipelaying construction work, 45232142 - Heat-transfer station construction work, 71240000 - Architectural, engineering and planning services, 76431000 - Well-drilling services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 29586784. The purchaser document reference is 000063-2019.
This tender falls under Construction and Real Estate, Power and Energy in Hungary. Suppliers in these sectors can track similar Hungary tenders using CPV-based alerts.