Contract notice: Taxiway pavement construction Tender - 40727821
Tender notice from Poland, published on 18 Feb 2020.
Executive Summary
The PRZEDSIĘBIORSTWO PAŃSTWOWE „PORTY LOTNICZE” has issued a Tender notice for the procurement of a Contract notice: Taxiway pavement construction work in the Poland. This Tender notice was published on 18 Feb 2020 and is scheduled to close on 19 Mar 2020, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 40727821, while the tender notice number is 078361-2020 and Register on the platform.
Key facts
Summary
Contract notice: Taxiway pavement construction work
Object of the contract Taxiway pavement construction work Description: Contract notice: Taxiway pavement construction work Authority Type: Utilities entity Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: Lowest price CPV code: 45235311, 31223000, 31518000, 45235311, 31223000, 31518000 CPV Description: Taxiway pavement construction work. Lamp-holders. Signaling lights. Replacement of surface wearing layer along with replacement of navigation lighting on taxiways DK A5, A6, A7 and A8 and DK H2 at Warsaw Chopin Airport Reference Number: 10 / PN / ZP / TLLZP / 20 The subject of the order is the replacement of the wearing course with the replacement of navigation lighting on taxiways DK A5, A6, A7 and A8 and DK H2 at Warsaw Chopin Airport as described in the subject of the order, Annex 1 to the relevant provisions of the contract. Main Site: Port Lotniczy im. F. Chopin in Warsaw ul. Żwirki i Wigury 1, 00-906 Warsaw, POLAND. The subject of the order is the replacement of the wearing course with the replacement of navigation lighting on taxiways DK A5, A6, A7 and A8 and DK H2 at Warsaw Chopin Airport. All works will be as-built, based on the geodetic as-built measurement and agreed unit prices. The surface of the surface to be repaired is presented in the situational plans attached to this OPZ. The deadline for the works. Staging of works. The implementation of works is planned for: - Stage I works at these runways closed at night: 9/10 May, at 22:00 06:00 LT night 10/11 May, Core Night; 16/17 May 22:00 06:00 LT night May 17/18, Core Night; May 30/31 22:00 06:00 LT night May 31 / June 1, Core Night; June 20/21 at 22:00 06:00 LT night June 21/22, Core Night. Works on DK, A6, A7, A8 and DK H2, work on approaching the intersection DK H2, DK A8 should be carried out taking into account the need for taxiingand SP from DK L to DK A8, - stage II works from 4.5 1.6.2020 works on DK A5, A6, A7 together with works on DK H2 and DK A8 not completed in stage I, - stage III works from 1.6 10.6. 2020 works at the intersection of DK L, DK A8 and on the side of the road at the height of the 61 Cargo plate, - stage IV works from 15.6 25.6.2020 works on the DK A8 and on the roadside at the height of the 63 Cargo plate, - stage V completion of works related towith the replacement of navigational lighting, handing over as-built documentation. Purchaser and final technical acceptance by 31.8.2020. The contractor will have a bituminous mix plant located in close proximity to the airport (up to 60 km) to ensure the right temperature for building the mix asphalt. Work related to the replacement of the wall layercontractor will perform using min. 2 milling machines 2 m wide, 3 pavers with a minimum laying width of 6 m, a sprinkler, equipment for compacting the asphalt mixture, the necessary number of transport equipment. The Employer requires that in the axial zone of the taxiway the minimum width of laying in seamless technology, the so-called hot to hot was min. 18 m. The scope of work related to the electrical industry is described in detail in Annex 2 to the OPZ electrical industry. The scope of the electrical industry is: - dismantling of IL 240 10 "halogen fittings together with the casing, handing over the luminaires to the Investor and disposal of the casing, - disassembly of ground taxi luminaires along with the base and handing them over to the investor, - disassembly of 8 "LED luminaires and reusey assembly at the place of disassembly after reconstruction of the surface in disassembly housings, - installation of secondary side cable ducting on the sections indicated in the drawing documentation from seamless galvanized steel pipes 2 ", - protection of secondary circuits and cable sewage pipes against surface restoration, - delivery and installation of new housings with a diameter of 8 ", - supply and assembly of LED lighting fixturesnavigation system according to the list contained in the OPZ graphic part, secondary circuit connection, replacement of the isolation transformer (if required by the fitting provided by the contractor), - updating the control system and technical monitoring, - calibration of CCR controllers in the SO-2 station, - preparation of as-built documentation. New navigation lighting fittings must be fully kcompatible with the existing Lucebit control and technical monitoring system and meet the requirements of Commission Regulation (EU) No 139/2014 of 12.2.2014 establishing requirements and administrative procedures for airports in accordance with Regulation (EC) No 216/2008 of the European Parliament and of the Council. The contractor will provide the contracting authority with a quality guarantee for completed works and servicesmaterials for a minimum period of 36 months from the date of signing the final acceptance report of the works falling within the scope of individual stages. 1. The contracting authority (pursuant to Article 26 (1) of the Act) will call the contractor whose tender has been rated the highest to submit within the prescribed period the following documents confirming the absence of grounds for exclusion in the scope of Article 24 paragraph 1 of the Act indicatesspecified in the Regulation of the Minister of Development of 26.7.2016 regarding "types of documents (...)": - paragraph 5 item 1 in the scope of paragraph 24 item 1 items 13, 14, 21 of the Act, item 5 item 4 within the scope of Article 24 (5) point 1 of the Act, - section 5 items 2, 3 and 9 within the scope of Article 24 (5) item 8 of the Act, - section 5 item 5 within the scope of Article 24 (1) item 15 of the Act, - paragraph 5 item 6 within the scope of Article 24 paragraph 1 item 22 of the Act 2and the contractor has its registered office or place of residence outside the territory of the Republic of Poland, and also if the person to whom the document relates is domiciled outside the territory of the Republic of Poland, the principles set out in par. 7 and 8 above Regulation. 3. The contracting authority, in order to confirm compliance with the conditions for participation in the procedure, acting on the basis of Article 26vol. 1 of the Act will call the contractor whose tender has been rated the highest to submit a list of the services performed within the set deadline, together with evidence of proper performance. 4. The contractor applying for the award of this contract must submit the following documents along with the offer: - "Offer" form (Annex 1 to the ToR), - bid estimate (Annex 1a to the ToR) - commitment if the contractor relies on the abilities of other entities as specified in the ToR, - unified European order document, - proof of payment of the bid security, - power of attorney with the right to sign the offer (in accordance with the ToR), - power of attorney to represent all contractors (in accordance with the ToR). 5. In accordance with art. 24 paragraph 11 of the Act, the contractor within 3 days ofd the date of posting on the website the information referred to in art. 86 section 5 of the Act will provide the contracting authority with a declaration of belonging or not belonging to the same capital group as referred to in Art. 24 paragraph 1 point 23 of the Act. Along with submitting the declaration, the contractor may provide evidence that links with another contractor do not lead to a distortion of competition in the progressivefor the award of the contract. 6. The contracting authority informs that for the period of 2 months referred to in section IV point 2.6 of this notice, it should be understood as a period of 60 days counted from the day of opening the bids. 7. Due to the limited number of characters that can be entered into the content of the advertisement, the remaining information is contained in the Terms of Reference available on the website of the contracting authority. Internet address (URL): www.polish-airports.com
The bid deadline for Contract notice: Taxiway pavement construction work was 19 Mar 2020. Bidding is closed.
This tender has been issued by PRZEDSIĘBIORSTWO PAŃSTWOWE „PORTY LOTNICZE” in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45235311 - Taxiway pavement construction work, 31223000 - Lamp-holders, 31518000 - Signalling lights.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 40727821. The purchaser document reference is 078361-2020.
This tender falls under Construction and Real Estate, Defence and Security in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.