Contract notice: Tarpaulins, awnings and sunblinds Tender - 30603062
Tender notice from Hungary, published on 12 Feb 2019.
Executive Summary
The GY?R NAGYTÉRSÉGI HULLADÉKGAZDÁLKODÁSI ÖNKORMÁNYZATI TÁRSULÁS has issued a Tender notice for the procurement of a Contract notice: Tarpaulins, awnings and sunblinds in the Hungary. This Tender notice was published on 12 Feb 2019 and is scheduled to close on 18 Mar 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 30603062, while the tender notice number is 066409-2019 and Register on the platform.
Key facts
Summary
Contract notice: Tarpaulins, awnings and sunblinds
Object of the contract Tarpaulins, awnings and sunblinds Description: Contract notice: Tarpaulins, awnings and sunblinds Authority Type: Other Contact Nature: Supplies Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 39522100, 39522100, 39522100 CPV Description: Tarpaulins, awnings and sunblinds. Tetel: membrane tarpaulin for MBH silk, quantity: 4 pcs 2. Tetel: membrantakaro tarpaulin for compost silo, headad: 4 pcs Tetel Name Quantity (pieces) 1. membran tarpaulin for MBH silos 4 2. membrantakaro tarpaulin for compost silo 4 1. tetel: 33 m x 9.5 m membrane tarpaulin tarpaulin for MBH 4 pcs Funkcio: The MBH siloban aerobic process should go into veggies, ensuring effective and hygienic waste management. Keep your moisture content and the most permissive kepesseg level.ilomerset: 33 mx 9 m, 2, 5 m tall tamfels Dimension of Takaro: 33, 0m x 9, 5 mx 3, 5m (H / SZ / M) In the pile, it should be made of seam-covered material. Functional membrane is to be fed with a top and bottom guide, too. Anti-rainfall coat: 1000 mm water column Water spray: 120-140 (g / m / day).are included in the technical dossier of the newsletter. 2. tetel: 48 m x 11 m Membrantakaro tarpaulin for compost silo 4 pcs Funkcio: The compostal siloban aerobic process should go into veggies, ensure effective and hygienic waste management. Suitable moisture content, the most permissive kepesseg level. Coughs: Takaro Dimension: 48.0m x 11.0m, 3m (H / SZ / M) Axis Aand with the cloak down, the edge of the min.0.5 meter wind must be elongated from the material with a seam. Functional membrane should be laid with a top and bottom guide. • Rainfall counter-rain: 1000 mm water column Waterborne scrubber: 120-140 (g / m / day) Ideal for new (unused, non-reinforced) skins in this frame The timelines areyou have to take the eskoezos on the site. The tarpaulin is to be delivered in a package that provides the opportunity to secure the technical features and parameters of the scaffolds and the tasks of the contractor and the terms and conditions of the contract.documents contain a reset-drafting technical report and a draft document containing any reference to a product, type, origin, item, ticket, patent, activity, person, item, or manufacturing process, so Acceptance also accepts an equivalent match. 321/2015. (X.30.) Government Decree- (3), subsection 46. There may not be a timekeeper, subordinate, and may not be a proper operator in the real books against whom Kbt. Article 62 (1) - (2) and Article Kb. Any of the grounds for exclusion set out in -- 63 (1) a) -d) above. (X.30.) Korm. (below) Kr.The unified european coexistence document (hereinafter referred to as EEKD) issued to a qualified person must be proved in advance by a swimmer who does not have the authority to exclude. In the case of Koezoes, the koezoes chiefs have to enter the EEKD each. If the timer is a suitable body or person, you can do ithurrying to meet you, Kbt. Section 67 para. (3) and Article 15 para. (1) of the Act shall also apply the EEKD to the organization issuing the capacity in accordance with Article 3 (2) of the Cr. In the EDF, the newsletter has created the EECD template in the form of an e-form, which is an electronic form.aban szueksegeso out. I am subordinate to those who do not take the correct Kbt in their proofs. Article 67 (4) of the Declaration. - It is up to the Kbt. Section 69 (4) - (7) tells the biralat to line up. Article 69 (4) - (6) is based on the introduction of the realm to the actor (timekeeper) in Kr.- (1) - (5) and (7) (7) of this Act shall further certify that there is no reason for the exclusion of grounds for exclusion. Section 74 para. (1) (b) excludes from the outset the subscriber, subcontractor, or organization appropriately retrieving his / her original certificate from the Kbt. Article 62 (1) - (2). Article 63 (1). (a) to (d) In case of a pending entry, the AT adds to the newsletter the variation entry brochure placed in the cegbirosag, and the certificate issued by the cegbirosag (Kr.13-), and in the case of negative content, the corresponding statement. In the EDF, the newsletter is the electronic form of the documentsIn this case, he has created a template for the Statement of variables, which is updated in the form of the electronic form by the subscriber. the basis for the update (hereinafter referred to as AT) in the schedule must be the proof of compliance with the Kbt by submitting a copy of the KESD documents. - 65 is based on the belowt suitable for suitcases. AT does not need to provide a detailed statement of the appropriate financial statements on the basis of Section 2 para. (5) of the Cr. (ie the ect point α of the EECD IV). In the EDF, the timeliness of the chaos documents is the electroIn the form of an electronic form, the EECD sample was created, which was updated in the format of the electronic form by the subscriber. Article 69 (4) - (7). based on the introduction of the appropriate proofs of evidence of the appropriate tissue engineer, the host entity, according to the subordinates, must certify that he / she meets the appropriate requirements of the test: P.1. The Kbt. Section 65 (1) (a) and Article 19 of the Cr.(1) (a) of the Code of Conduct (in the case of koezoes, any Kezoes instructor) attaches to all the pennants of the penguins who are driving in the 24-month period, which is guided by the day-to-day penzuegyin insertion. under the scheme)l, when the timekeeper dropped off, or when he started to act, if these data were available, with the lower minimum content: - the samuel (samlan) bill of money, - the velvet (samlak) opened his time (i ), - the sampler (samlain) has been in the 24-day prior to the day of the dutyatas nyujtasarol szolo 2009 evi LXV. toerveny defined in Section 2, point 25, 15 calendar days longer than a period of time. P.2. The Kbt. Article 65 (1). a) es in Section 19 (1) of the Cr. (c) and Article 19 (5). basically attaches the last 3 - to - the - pearl closure - before the final task - a statement from the retailer - a low turnover adku - kommitit - arbeveteler, a violent statement that the timekeeper is drinking and drinking. when it started to work when these data are available. If thatthe timekeeper does not have the data of the last 3 business days before the expedient task, which is closed by the runner-up round, the net-engagement according to the chaos of the activity of the beginning of the period of his activity has to comply with the minimum practice. and in the cases referred to in paragraph 7, the proof of contact The correct proof of the suit is Kbt. Article 69 para. (11) is also applicable. (2) of Section 71 (6) does not apply. P2. M1. 3) Ertekeles model: best gold (Kbt.76.- (2c) c). Ertekelesi points: 0-100 points. 1.presentation: Must be given in HUF. Biralati System: aKoezbekerzesi Hatosag Utmutatoja (K.E. of the reverse gold. 2nd point: The duration of Jotallas in the month of the month is the minimum of 48 months of finishing time, to be given in the month, up to a maximum of 60 months.ye way: the Hamasag Utmutat of Koezbekerze (K.E. 4) Attach a professional report to the AD's schedule according to the ADI file, which contains the description of the projections with the information that can be used to describe the ASuitable for the minimum parameters required by K. In the framework of the professional history of AT, present the type of tarpaulins according to the artwork, with drawings, abrasion, pine trees. they are athletics 6) The newsletter introduces its claims in the documentary. ) For the 1 month specified in section IV.2.6a full six-day offsets must be completed 30 days 9) Kbt.35.- (8) can not be based on a financial organization (project partner) 10) AK a Kbt. -- (4) - (5) apply. (X. 30.) KR. Article 46 para. (3) is based on the specified production or origin of the product or on a specific item, which is a host entityor the altarpiece is characterized by uttered services, or, in the case of a reference to a ticket, patent, activity, person, type or particular origin or manufacturing process, the expression "or equivalent" shall be used. similar aruk is used for the production of a technical-functional one with noIt would not be material or economic in any way to emerge. K has developed the technical assumptions system, as well as the technical requirements, so that the competition is adequately secured by the fact that the insurance company of the company would be irrelevant from a financial point of view. K's testimonials have confirmed that the host technoYou can obtain more than one piece of mashed kernels with a single coaxial coordinate. From the point of view of K, it is important to deal with, and to deal with, something that is to be dealt with in some way. That is why the tasks related to this are oessehangolasa, which is due to the fact that the selection of the procurement is more effective. Prophecy of the timing of the shakes azert does not guarantee, because only the one organization can complete the positioning of the on-site placement on the basis of security and safety reasons, given the assurances of the -allasi assumptions, and the continuity of the franchisees. Internet address (URL): http://www.hulladek.gyor.hu
The bid deadline for Contract notice: Tarpaulins, awnings and sunblinds was 18 Mar 2019. Bidding is closed.
This tender has been issued by GY?R NAGYTÉRSÉGI HULLADÉKGAZDÁLKODÁSI ÖNKORMÁNYZATI TÁRSULÁS in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 39522100 - Tarpaulins, awnings and sunblinds.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 30603062. The purchaser document reference is 066409-2019.