Tender notice from Poland, published on 28 Aug 2019.
Executive Summary
The WODOCI?GI KIELECKIE SP. Z O.O. has issued a Tender notice for the procurement of a Contract notice: Tanks, reservoirs, containers and pressure vessels in the Poland. This Tender notice was published on 28 Aug 2019 and is scheduled to close on 01 Oct 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 35841242, while the tender notice number is 405542-2019 and Register on the platform.
Key facts
Summary
Contract notice: Tanks, reservoirs, containers and pressure vessels
Object of the contract Tanks, reservoirs, containers and pressure vessels Description: Contract notice: Tanks, reservoirs, containers and pressure vessels Authority Type: Utilities entity Contact Nature: Supplies Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: Lowest price CPV code: 44610000, 45231222, 45000000, 45252127, 45310000, 45333000, 45331210, 50532000, 44610000, 45231222, 45000000, 45252127, 45310000, 45333000, 45331210, 50532000 CPV Description: Tanks, reservoirs, containers and pressure vessels. Gasholder works. Construction work. Wastewater treatment plant construction work. Electrical installation work. Gas-fitting installation work. Ventilation installation work. Repair and maintenance services of electrical machinery, apparatus and associated equipment. Kontrakt 12 Modernizacja membranowego zbiornika gazu na terenie Oczyszczalni Ściekow "Sitkowka" Reference Number: JRP - 15/2019 The subject of the contract is implemented under the project "Improvement of wastewater management in the Kielce metropolitan area" co-financed from the Cohesion Fund under the Operational Program Infrastructure and Environment 2014-2020, Measure 2.3 "Water and wastewater management in agglomerations" included as Contract 12 "Modernization of membranesgas tank at the "Sitkowka" Sewage Treatment Plant. Main Site: Sitkowka-Nowiny Commune: "Sitkowka" Sewage Treatment Plant The Contractor should anticipate the possible need to modify the existing lightning mast. Technical details regarding the existing foundation and the lightning mast are given in the Annex No. 1 to OPZ, Part III of the ToR, the Archival Building and Executive Project entitled:"Diaphragm biogas tank with a capacity of V = 570 m, including connection pipelines to the existing biogas installation" and Annex 5 to OPZ part III of the ToR as-built documentation. The tank with accompanying devices is to fulfill the function of storing excess biogas during periods of its production increase WKF chambers and stabilization of biogas pressure in the network. 1The subject of the order is divided into 2 stages: a) the first stage of the contract includes disassembly of unnecessary elements of the existing tank, carrying out all accompanying work necessary for the implementation of the contract, including possible trapping / repair of the existing foundation in order to align its surface or modify the shape to prepare new ones tank anchorage points gazu and possible modification of the existing lightning mast, delivery, assembly and commissioning of new elements of the tank and its equipment with the parameters described in OPZ (part III of the ToR), b) the second stage of the contract includes servicing the object of the contract for the first 36 months from the date of receipt the final subject of the contract made in the first stage of implementationand the subject of the order, including the performance of service and maintenance operations, including the supply and replacement of consumables and fast-wearing parts resulting from the manufacturer's requirements and the DTR records of individual devices to ensure the maintenance of the warranty / warranty on the basis of the service activities prepared by the Contractor. Service rulesand the subject of the order is described in item 7 OPZ (part III of the ToR) and in - 6 of the contract. 2. The scope of the contract includes: 1) Dismantling of old equipment, installations, coatings, switchboards. 2) Renovation of the existing foundation in terms of biogas introduction / exit points and biogas pipelines. Possible implementation of a trap / repair of the foundation in order to align its surface or modify the shapefor the preparation of new anchor points for the gas tank. 3) Replacement of existing shells (membranes) of the tank with new ones with bottom and internal storage coating and external protective coating. 4) Modernization of the current pressure maintaining system in the biogas network (blowers, gas pipelines, pressure sensors, safety valves) adapted to work with a new biogas tank. 5) Madeie biogas leak detection system in the tank. 6) Delivery and installation of a new continuous (electronic) biogas level measurement system in the tank. 7) Implementation of a new membrane fixing system to the substrate, adapted to the supplied membranes. Steel elements of the fastenings should be made of acid-resistant steel. 8) Carrying out leakage tests and starting the tank and installation based onfor commissioning documentation. 9) Checking the correct operation of all safety elements in the presence of the Employer. 10) Ensuring the cooperation of the modernized tank with a steel tank in order to optimally use their capacity assuming their equal percentage filling with accuracy / -5%. Detailed range of material to be carried out as part of the contractThe contract was indicated in the ToR, available on the Employer's website. Contractors who meet the following conditions of participation in the procedure may apply for the award of a public contract: 1. are not subject to exclusion from the procedure in the circumstances specified in art. 24 paragraph 1 and art. 24 paragraph 5 point 1), 2), 4), 8) of the Public Procurement Law, subject to the provisions of art. 133 section 4 of the PPL Act 2. meet the conditions for participation in the proceedings: 1) regarding technical or professional capacity - in accordance with point III.1.3), 2) regarding economic or financial situation - according to point III.1.2). 1. The Contractor is obliged to attach to the Offer the following documents: 1) To demonstrate compliance with the conditions for participation in the procedure and the lack of grounds for exclusion specified by the Employero in point 10 of the IDW, a statement in the form of a single European order document (EAT) prepared in accordance with the template of the standard form set out in the European Commission implementing regulation issued on the basis of art. 59 clause 2 of Directive 2014/24 / EU and art. 80 clause 3 of Directive 2014/25 / EU, hereinafter referred to as the Single European Order Document or EAT, in electronic formbearing a qualified electronic signature. The PPO's website contains the "Instructions for submitting a single European order document using electronic means of communication". The information contained in the document will constitute preliminary confirmation that the Contractor is not subject to exclusion and meets the conditions for participation in the procedure. 2) Appropriate Power of Attorney (a) - wpin the case when the authorization to sign the offer does not result directly from an excerpt from the relevant register or if the Contractor does not sign the offer. 3) In the case of Contractors jointly applying for the award of a contract, a document establishing the Proxy to represent them in the procurement procedure or to represent them in the proceedings and concluding a contract regarding this contractpublic procurement. 4) The obligation of a third party in the event that the Contractor demonstrating compliance with the conditions for participation in the proceedings relies on the abilities or situation of other entities (according to the template constituting Annex 6 to the IDW). Documents referred to above should be submitted in accordance with the rules set out in point 16 of IDW. 2. In the case of joint application for the Contractors to order a statement, in formie the Single European Contract Document (EAT) is submitted by each of the Contractors jointly applying for the contract. These statements are intended to confirm that the conditions for participation in the procedure have been met and that there are no grounds for exclusion. These declarations should take the form of an electronic document signed with a qualified electronic signature. 3. Contractor who refers to the resources of other entitiesin order to prove that there are no grounds for exclusion from them and meet the conditions for participation in the proceedings, to the extent that he refers to their resources, he also submits the uniform documents (EAT) indicated above, regarding these entities, as well as submits in relation to these entities documents listed in 11.5.4) IDW. Statements of entities sharing the potential submitted onthe EAT form should be in the form of an electronic document signed by a qualified electronic signature by each of these entities to the extent that they confirm the circumstances referred to in art. 22 paragraph 1 of the Public Procurement Law The Ordering Party informs that it will first evaluate the offers and then examine whether the Contractor whose bid was assessed as the most advantageous is not subject to exclusionand meets the conditions for participation in the procedure on the principles set out in art. 24aa of the Public Procurement Law the Contractor will meet the conditions for participation in the proceedings regarding the economic or financial situation (in the event of joint application of two or more Contractors for the award of this contract, their total economic or financial situation will be assessed, for this purpose documents must be submitted)b those of the Contractors who on behalf of all will demonstrate compliance with this condition), if it proves that: a) it has civil liability insurance in respect of its activities related to the subject of the contract for an amount of at least PLN 500, 000 . 1. The Purchaser does not provide for an order involving the repetition of deliveries in accordance with the subject of the order. 2. Youthe contractor within 3 days of posting on the website the information referred to in art. 86 section 5 of the PPL Act will provide the Employer with a statement (in the form of an original) on belonging or not belonging to the same capital group as referred to in art. 24 paragraph 1 item 23 of the PPL Act, prepared in accordance with Annex No. 5 to the IDW. By submitting the declaration, the Contractor mayprovide evidence that links with another Contractor do not lead to a distortion of competition in the procurement procedure. 3. Before awarding the contract, the contracting authority will call the contractor whose tender has been rated the highest to submit it within a designated period, not shorter than 10 days, valid as at the date of submitting the declarations or documents indicated in point 11.5 IDW. 4. To confirmand the lack of grounds for excluding the Contractor from participation in the proceedings, the Employer requests the submission of documents specified in point 11.5.4) IDW: a) information from the National Criminal Record in the scope specified in art. 24 paragraph 1 item 13, 14 and 21 of the PPL Act issued not earlier than 6 months before the deadline for submitting bids; b) a certificate from the competent head of the tax office confirming thate The Contractor is not in arrears with payment of taxes, issued not earlier than 3 months before the deadline for submission of bids, or other document confirming that the Contractor has entered into an agreement with the competent tax authority regarding the repayment of these receivables along with any interest or fines, in particular obtained exemption, postponement or distribution into installmentsunexpected payments or withholding in full of the decision of the competent authority; c) a certificate of the competent organizational unit of the Social Insurance Institution or Agricultural Social Insurance Fund or other document confirming that the Contractor is not in arrears with payment of social security or health insurance contributions, issued not earlier than 3 months before the expirythe deadline for submission of bids or other document confirming that the Contractor has entered into an agreement with the competent authority regarding the repayment of these receivables together with any interest or fines, in particular, he obtained the exemption provided for by law, deferment or installment of outstanding payments or withholding in full the execution of the decision authority; d) an excerpt from the relevant registeru or from the central register and information on business activity, if separate provisions require an entry in the register or the register, in order to confirm the absence of grounds for exclusion pursuant to art. 24 paragraph 5 point 1 of the Public Procurement Law; e) the Contractor's statement that he has not issued a final judgment of the court or a final administrative decision on arrears with payment of taxes, fees or feesdecree on social or health insurance or - in the event of such a judgment or decision - documents confirming the payment of these receivables together with any interest or fines or the conclusion of a binding agreement on the repayment of these receivables; f) the Contractor's statement that there was no measure against him preventive prohibition of biddingpublic; g) statements of the Contractor on non-payment of taxes and local fees, referred to in the Act of 12.1.1991 on local taxes and fees (consolidated text of the Journal of Laws of 2018, item 1445 as amended). changes). Due to the limited number of characters that can be entered in the content of the advertisement, the remaining information is contained in the Terms of Reference available together with this announcement on the websiteEmployer's website: www.wod-kiel.com.pl Internet address (URL): http://www.wod-kiel.com.pl
The bid deadline for Contract notice: Tanks, reservoirs, containers and pressure vessels was 01 Oct 2019. Bidding is closed.
This tender has been issued by WODOCI?GI KIELECKIE SP. Z O.O. in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 44610000 - Tanks, reservoirs, containers and pressure vessels, 45231222 - Gasholder works, 45000000 - Construction work, 45252127 - Wastewater treatment plant construction work, 45310000 - Electrical installation work, 45333000 - Gas-fitting installation work, 45331210 - Ventilation installation work, 50532000 - Repair and maintenance services of electrical machinery, apparatus and associated equipment.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 35841242. The purchaser document reference is 405542-2019.
This tender falls under Materials and Products, Construction and Real Estate, Defence and Security in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.