Contract notice: Structures construction work Tender - 24435138
Tender notice from Poland, published on 25 Jun 2018.
Executive Summary
The WODOCI?GI BIA?OSTOCKIE SP. Z O.O. W BIA?YMSTOKU has issued a Tender notice for the procurement of a Contract notice: Structures construction work in the Poland. This Tender notice was published on 25 Jun 2018 and is scheduled to close on 03 Aug 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 24435138, while the tender notice number is 271599-2018 and Register on the platform.
Object of the contract Structures construction work Description: Contract notice: Structures construction work Authority Type: Utilities entity Contact Nature: Works Procedure: Restricted procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45223000, 45231100, 45233120, 45252100, 45261000, 45311000, 45317200, 45317400, 45331000, 45400000, 45100000, 71220000, 71320000, 45223000, 45231100, 45233120, 45252100, 45261000, 45311000, 45317200, 45317400, 45331000, 45400000, 45100000, 71220000, 71320000 CPV Description: Structures construction work. General construction work for pipelines. Road construction works. Sewage-treatment plant construction work. Erection and related works of roof frames and coverings. Electrical wiring and fitting work. Electrical installation work of transformers. Electrical installation work of filtration equipment. Heating, ventilation and air-conditioning installation work. Building-completion work. Site design work. Architectural design services. Engineering design services. Unlimited tender in the "design and build" formula for construction works: "Hetisization and deodorisation of selected sewage treatment plants - Contract No. 3" Reference Number: TI-03-FS / 2018 The subject of investment is design and implementation of modernization consisting in securing the selectedfacilities of the sewage treatment plant in Białystok before the spread of odors towards residential facilities located around the sewage treatment plant. The construction works will consist in subjecting encapsulation and deodorization of facilities and equipment located in the treatment plant in Białystok at ul. Production 102 in the "design and build" system as part of the project "Optimization of economywater and sewage dome in the city of Białystok and Wasilkow Commune The 1st stage "co-financed from the Spojności Fund under the Operational Program Infrastructure and Environment for 2014-2020 Measure 2.3 Water and wastewater management in agglomerations, described in the Functional and Functional Program (PFU). Main Site : Sewage treatment plant in Białystok, 102 Produkcyjna street, 15-680 Białystok. 2) Exthe procurement agency includes in particular: a) Execution of complementary testing of concrete objects to be encapsulated to enable the selection of an appropriate and effective technology for the repair (reconstruction) of concrete and permanent protection of the structure. b) Performance of construction projects (or construction design) with obtaining a permit construction. c) Execution of detailed designs, SpeTechnical Assessment of Execution and Acceptance Robot and simplified cost estimates. d) Obtaining the necessary arrangements and permits to start and operate the robot. e) Performing construction and assembly works related to the Hermetization and deodorization of facilities on the basis of documentation prepared by the Contractor, including start-up deodorization equipment and installations and insfor the measurement of hydrogen sulphide, ammonia and mercaptan concentrations on-line, including modernized installations for operation. f) Implementation of a visualization application of the subject of the contract in the existing control and supervision system of the sewage treatment plant together with the update of the current system for visualization management and monitoring of technological processes (SCADA) ) to the latest version. g) Przeproimplementation of technological start-up and trial traffic, development of the necessary initial and post-commissioning documentation and obtaining the assumed technological effect. h) Conducting training and service training for the ordering employees. i) Exercising author's supervision during the robot's operation. The author's supervision will be exercised by the Contractor from the date of handing over to Kierownand construction site construction until the day of final acceptance of construction works. j) Development of multi-branch as-built documentation and updating of detailed facility instructions along with technological schemes. k) Provision of surveying services and execution of post-implementation geodetic survey with urban maps . l) Obtaining a permit for the use of facilities and installations forand which such permission is required by law or notification of completion of the construction. m) Restoration of the site to the original condition. n) Cooperation with the Employer to transfer the investment to the condition of the Employer's assets, in particular when determining the costs of individual investment elements or specific devices transferred separate evidence OT. In the scope of the robotand, above all, encapsulation and installation of deodorization installations at Sewage Treatment Plant and construction of related general construction, assembly and renovation works inside and outside the following facilities: Object no. 1 Cesspool of liquid waste Object no. 2 Inlet chamber with channels and room grates Object no. 3 Two-chamber sandstones, drain channelwy, separation chamber Object no. 4 Sand separator building Object no. 5 Inlet channel, pre-settling tanks, predenitrification chambers, dephosphatation, Pumping station I st. - Object no. 6 Sediment reception building Object no. 7 Building of digestate sludge digesting station Object no. 8 Resource Tanks Object No. 9 Temporary Sludge Storage Building Object No. 10 Raw Sludge Thickeners Szczethe naked description of the order contains PFU. 1. Contractors who are not subject to exclusion and meet the conditions for participation in the procedure may apply for the award of the contract. The contract award procedure excludes: 1) the contractor who did not show compliance with the conditions of participation in the procedure or was not invited to negotiate or submit initial offers or offers, ore showed no grounds for exclusion; 2) a contractor who is a natural person who has been validly convicted of a crime: a) referred to in art. 165a, art. 181-188, art. 189a, art. 218-221, art. 228-230a, art. 250a, art. 258 or art. 270-309 of the Act of 6.6.1997 - Penal Code (Journal of Laws item 553, as amended) or art. 46 or art. 48 of the Act of 25.6.2010 on sport (Journal of Laws of 2016 item 176), b) of a terrorist character, referred to in art. 115 - 20 of the Act of 6.6.1997 - Penal Code, - c) fiscal, - 3) contractor, if a member of its management or supervisory body, a partner of the company in a registered partnership or partner or a general partner in the limited partnership or limited joint-stock partnership or the commercial proxy was convicted for the offense referred to in point 2)-point ac; 4) a contractor against whom a final court judgment or final administrative decision has been issued regarding tax arrears, fees or social security or health insurance premiums, unless the contractor has made payments of taxes due, fees or social security or health insurance contributions interest or fines or has a binding agreement to repay t(5) a contractor who, as a result of intentional action or gross negligence, misleads the purchaser in submitting information that he is not subject to exclusion, meets the conditions for participation in the proceedings or objective and non-discriminatory criteria, hereinafter referred to as "selection criteria", or who has concealed this information or is unable to provide the required documents; 6) exa person who as a result of carelessness or negligence presented misleading information that could have a significant impact on decisions taken by the ordering party in the procurement procedure; - a contractor who unlawfully influenced or tried to influence the actions of the customer or obtain confidential information that could give him an advantage in the procurement procedurea; 8) a contractor who participated in the preparation of the contract award procedure or whose employee, as well as a person who performed work on the basis of a mandate contract, contractor, agency or other contract for the provision of services, took part in the preparation of such a procedure, unless the resulting distortion of competition can be eliminated in other ways than by excluding the contractor from the thighs(9) a contractor who concluded an agreement with other contractors aimed at distorting competition between contractors in the contract award procedure, which the contracting authority is able to demonstrate by means of appropriate evidence; - a contractor who is a collective entity for whom the court has ruled that it is forbidden to apply for public orders under the Act of 28.10.2002 on the liability of collective entities for acts prohibited under penalty (Journal of Laws 2015 item 1212, 1844 and 1855 and from 2016 items 437 and 544); 11) contractor against whom the title was pronounced preventive measure prohibiting applying for public orders; 12) contractors who, belonging to the same capital group, - the Contractor is also subject to exclusion pursuant to art. 24 sec.-5 point 1) -8) Pzp. Detailed information is included in Part I of the ToR (a) The contracting authority requires the contractor to have a minimum annual turnover of PLN 15, 000, 000 for the last three financial years, and if the period of business is shorter, period, b) The contracting authority requires the contractor to have third-party liability insurance in the scope of activities related to the subjectorders, for a guarantee sum not lower than PLN 20, 000, 000, c) The contracting authority requires the contractor to have funds or creditworthiness of at least PLN 10, 000, 000 in the period not earlier than one month before the deadline for submission of tenders. offers evaluation are: Price 90%, Additional experience of construction manager 10% List of statements and supporting documentsfulfillment of the conditions for participation in the procedure and the lack of grounds for exclusion have been described in Part I of the ToR. Chapter X The offer includes: 1) Offer, understood as completed Annex 1 Form of the offer to this SIWZ, 2) valid on the day of submitting offers in the scope indicated by the ordering party in the contract notice or in the relevant terms of the contractin the form of a single document drawn up in accordance with the specimen of the standard form set out in the implementing regulation of the European Commission issued on the basis of art. 59 par. 2 of Directive 2014/24 / EU and art. 80 ust. 3 of Directive 2014/25 / EU, hereinafter referred to as a "single document." The information contained in the statement constitutes a preliminary confirmation that the contractor is not subject to exclusion andconditions for participation in the proceedings; Note: The method and form of the EAT deposit are set out in Chapter XI, para. 4 of this SIWZ, 3) an obligation for entities to put at the disposal of the necessary resources for the needs of order fulfillment, if the Contractor relies on the ability or situation of other entities to prove to the orderer that when executing the order, the Contractor will not haveunnecessary resources of these entities - drawn up on a printout constituting Annex 2 to these ToR, - 4) Power of attorney to represent all contractors jointly applying for a contract, possibly a cooperation agreement, which will result from the given power of attorney. A proxy may be appointed to represent the Contractors in the proceedings or to represent themin the procedure and conclusion of the contract. The power of attorney should be enclosed in the form of an original or notarially certified copy; 5) Documents from which the right to sign the offer (original or a copy certified for compliance with the original by a notary public) or other documents submitted together with the offer, unless the orderer can get them in detail with the help of freeand public databases, in particular public registers within the meaning of the Act of 17.2.2005 on computerization of entities operating public tasks (Journal of Laws of 2014, item 1114 and of 2016 item 352), and the contractor indicated this along with submitting the offer, if the right to sign them does not result from the documents submitted with the offer; 6) Original of the guarantee or surety, if the tender deposit is paid in a form other than money. 7) Price list prepared on Annex 6 to this SIWZ. 8) Confirmation of a local vision on Annex 8 to this SIWZ. Other documents are listed in detail in Chapter X: paragraph. 8 point 1) -4), para. 10 point 1) -3), para11 point 1) -10) Note: The electronic communication means used for depositing EAT by means ofthe e-mails are e-mails. The period of being bound by the offer is 60 days Duties resulting from the GDP (personal data) are specified in Part I and II of the ToR. Detailed information is contained in Part I of the Terms of Reference. Internet address (URL): www.wobi.pl Directive: Classical Directive (2014/25/EU)
The bid deadline for Contract notice: Structures construction work was 03 Aug 2018. Bidding is closed.
This tender has been issued by WODOCI?GI BIA?OSTOCKIE SP. Z O.O. W BIA?YMSTOKU in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45223000 - Structures construction work, 45231100 - General construction work for pipelines, 45233120 - Road construction works, 45252100 - Sewage-treatment plant construction work, 45261000 - Erection and related works of roof frames and coverings, 45311000 - Electrical wiring and fitting work, 45317200 - Electrical installation work of transformers, 45317400 - Electrical installation work of filtration equipment, 45331000 - Heating, ventilation and air-conditioning installation work, 45400000 - Building completion work, 45100000 - Site preparation work, 71220000 - Architectural design services, 71320000 - Engineering design services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 24435138. The purchaser document reference is 271599-2018.