Contract notice: Stacking machinery Tender in Hungary - 34719003
Tender notice from Hungary, published on 16 Jul 2019.
Executive Summary
The NFP NEMZETI FEJLESZTÉSI PROGRAMIRODA NONPROFIT KORLÁTOLT FELEL?SSÉG? TÁRSASÁG has issued a Tender notice for the procurement of a Contract notice: Stacking machinery in the Hungary. This Tender notice was published on 16 Jul 2019 and is scheduled to close on 12 Aug 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 34719003, while the tender notice number is 331469-2019 and Register on the platform.
Object of the contract Stacking machinery Description: Contract notice: Stacking machinery Authority Type: Other Contact Nature: Supplies Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 44614310, 42415100, 43250000, 43251000, 44614310, 42415100, 43250000, 43251000 CPV Description: Lifting trucks. Front-end shovel loaders. Front-end shovel loaders with backhoe. Sajo-Bodva-other gepek - KEHOP-3.2.1-15-2017-00013 Reference Number: EKR000906162019 in the frame of the project KEHOP-3.2.1-15-2017-00013 for the realization of the same identity project for the other projectors Main Site: Sajokaza Hulladekkező Centrum A 339/2014 (XII.19)The tasks of the NFP National Development Program Nonprofit Corrupt Responsible Responsible Guarantor have been discussed in the 2014-2020 program period in the Co-operative and Energy Efficiency Operational Program (hereafter: KEHOP).in the present case, the development of a complex waste management system: the development of a complex waste management system at Sajo-Bodva Voelgye and Koernyeke Hulladekkezelesi Oenkormanyzati Tarsulas teruelet, with regard to the waste collection, transport and pre-treatment system, called KEHOP-3.2.1-15-2017-00013. : Project in the frame of the projekt realosulasahoz sueksural lower gepper purchase in the lower volume: Material handling equipment: - Magnetic front loader 1 pc - Forklift balafogro 1 pc - Front loader dozer 1 pc ... The atadas in the high-laden front-wheelchair looking at the underfloor and the six-legged sign. up 24 orange belueli time intervalIn llum, you should start the work with the appropriate person alloman at the specialist service and continue to work until it is finished). The winning timer assumes the responsibility of each type of cat handed down at kueloen-kueloen, at least 2 persons in charge and practical, and the use of the inputs.of the Insured. Betanitast must be completed with allo six times for full performance. The place of betanitas: According to the sale and buyer 's agreement, the assigned eszoezos have the following points of reference. The technical charms and parameters associated with the author's works are included in the documentation.perpetrator of the Ptk. (Article 6: 231) (The sixth anniversary of a certain number of things determined by quantity and quantity) The force of the author does not guarantee the amount of divergent possibilities in the line of the author's performance., for action, person, person or factoryThis includes a reference to the process of proclamation, so Acceptance is also accepted by the equivalent body of authority. Article 46 (3). AK presents AT to Government Decree 321/2015 (X.30.). - (3) is based on the effect. a producer or a thing of origin, or a specific thing, which is the product of a given farmer, or the service of an arenaor, in the case of a reference to a ticket, a patent, a cam, a person, a type, or a given item or a manufacturing process, the term "or equivalent" should be used to refer. in the appropriate proof sheet is a farmer who is the subject of Article 62 (1) - (2) Kbt.zaro causes barmelyallallall. (X.30.) Korm. (hereinafter referred to as "Kr."), the subscriber based on Section 1 (1) on the basis of an electronic form provided in the form of an electronic form (hereinafter referred to as EEKD), must prove in advance that the reason is not forbidden.lya area. In the case of Koezoes, the koezoes must give a form to each and every one of them. Section 67 para. (3) and Article 15 para. (1) of the Cr.ani in accordance with Article 3 (2) of the Cr. In the EDF, the timeliness of the e-mail form of the e-mail form in the e-form of the e-form has been elaborated in the form of the e-form. (4) In progressIn case of a misdemeanor case, the AT adds the variation entry brochure to the cegbirosag, and the certificate issued by the cegbirosag (Kr.13-), and in the case of negative content, the corresponding statement. In the EDF, the timeliness of the newsletter documents has created an e-form for the custodian in the form of a declaration of variation.This is the sample that the subscriber has submitted in the form of an electronic form. - Basic proof line: (1) Kbt. 69 (4) - (7) jar the line of biralat (2) The Kbt. Section 69 (4) - (6) The introduction of the certificates is inspired to the actor (subscriber) in - 1 (1) - (5) and (7) of the Cr.8, 10, 12-16 to prove that the power of the exclamation grounds does not fall. Section 74 para. (1) (b) excludes from the outset the subscriber, sub-subcontractor, or organization that retains the right to read the Kbt. - 62 (1) - (2) of the exclusions provided for in the first paragraph of the first subparagraph.wedge. the basis for the update (hereinafter referred to as AT) in the schedule must be the proof of compliance with the Kbt by submitting a copy of the co-procured documents. Section 65 is based on the appropriate requirements for co-workers. Predictive Force Based on Section 2 (5) of the Cr.is looking for the ECD IV. people. In the EDF, the timeliness of the e-mail form of the e-mail form has been created by the e-mail form in the e-form. Article 69 (4) - (7). basics of the introduction of the appropriate proofs of the realization of the treasures of the hosts of the underdogint suuekseges to prove that he / she meets the appropriate requirements: P.1. The Kbt. Article 65 para. (1) (a) and Article 19 (1) (a) of the Cr. the penzuegyi is a pamphletic inmatel, a statement, attentively, when the AT dropped off, or when he started to act, if these data are available, with the lower minimum content: - the sampler of the pennant (samlak), - the velvet samla (samlak) ) have opened their time (s), Pushchair service for stowage service 2009 LXV. toerveny defined in section 2, point 25, 15 calendar days in a queue of time allitas (Reason for accepting in the queue pool suits). The timeat the same time, all bank statements and bank accounts containing the sampled bank must be attached, which contains a statement that the penzuegyi intezmeny, which is exaggerated in the attached Penzuegyi insider statements, does not lead to any further appraisal. The Kbt. Section 65 (1). (a) and Article 19 (1) of the Cr. (c) and Article 19 (5). base AT attachthe last 3 rallies of the final round, which were closed by the turn of the bump, came from a low-cost traffic taxi. when it started to work when these data are available. If AT does not have the task at handoezvetlenuel previous last 3 rows of rounds of business finals closed down, the same as the minimum qualifying practice of the previous period after the start of the activity. he does not have a document as per Art.It is not possible to replace the penzuegyi and the host suffix with any other statement or document considered appropriate by the news agency, instead of the appropriate modular and verifiable certificate modal. As a complementary consultant, I am looking for a legal form that is legal in nature, consideringIt is not possible to disclose a statement about arbevetel instead of the appropriate moderated and verifiable modus operandi in relation to this point. HUF 1 000 000 1.2. The time of the time is to be foolish 1.3. Completed: Kee's pay-as-you-goor, in the case of penzuegyi intezmeny or insurance company, the insurance or commissioner of the guarantor, or the basis of the contract of the insurer of your insurance company - includes a pay-as-you-go guarantor. In case of a traumatic case, it must be completed in case of AK 10027006-00338240-00000017. The payment order must be checked on the ticket. The attaal megtoertent is true 1.5. The AT must prove that the AK has been released by the Commissioners 1.6. 2) Ertekeles: 2.1. Also the upper limit of the point-to-point score in the herring line: 0.00-100.00 points. 0.00 is the worst, 100.00 is the best. 2.2. Edge-wise modality: Best Artefacts in Gold, Period or Occasion by Translated Gold, the sub-criteria of the qualitative aspect are straight gold. 2.3. The worst is the Kbt. Article 77 (1). according to: 2.1.1. with a sub-angle of 4300 mm, 2.1.2. 600 Nm, 2.2.1. sub-criterion: 3000 kg, 2.2.2. with a sub-angle of 30 kW, 2.3.1. sub-criterion: 16 t, 2.3.2. sub-aspect: 100 kW 2.4. 3) Feltetele eljaras: AYes. With regard to Article 135 para. (12), AK draws attention to the fact that it has enacted a lawsuit (modular, varied application). AK informs keepers that tamogatra iranyulo will not accept or accept minor orbital acceptances or, if relevant to Tamogatasi Author (TSZ) modulated or not notifiedm is considered to be a koeruelmenyn in respect of which AK may refer to the contractor's performance or performance. AK on Kbt. Article 53 (6). and Ptk. 6: 116th - (1) the basis for the report would be made public even if TSZ mod. not for keruel alairas or for non-keruel non-keruel acceptorsclef the author's power to let go of the superb conditions. 4) Professional news: 4.1. Attaches a professional report to the documentary report of AT, which contains the current gep report with a resemblance so that the minimum parameters required by AK can be retrieved, furthermore the sub-criteria of the qualitative criteria are taken into account.Technical characteristics of the dog are brought to our attention. The table in the technical guide can be found in the appendix. If the table attached to the newsletter is not based on the technical parameter for the criterion of the qualitative criteria, it can not be set in the same way, but it can be set to the minimum value, Q The minimum score of 0.00 is given in the row of conspiracy 4.3. K points out that if a data is given to the appropriate partner in the case of data, it is possible to obtain such credentials from alatamaszto documents (in the case of this: in the case of a certificate, type-certified or other, this alike is to be considered equivalent to this certificate modality) 4.4. Erthis is not the same as the list of products that correspond to the technical specifications specified in the document. 4.5. K shows the news that it is possible to retrieve an entirely new ideo, and in the case of used essay, the story is Kbt. Section 73 (1). point (e) is groundless. Professional adventure frameworks for kerueljoen battlefields are dedicated and / or differenta statement by the attorney-at-law and / or all qualified service personnel of the service department of the specialist service, according to the terms and conditions contained in the document. Internet address (URL): http://www.nfp.hu
The bid deadline for Contract notice: Stacking machinery was 12 Aug 2019. Bidding is closed.
This tender has been issued by NFP NEMZETI FEJLESZTÉSI PROGRAMIRODA NONPROFIT KORLÁTOLT FELEL?SSÉG? TÁRSASÁG in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 44614310 - Stacking machinery, 42415100 - Lifting trucks, 43250000 - Front-end shovel loaders, 43251000 - Front-end shovel loaders with backhoe.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 34719003. The purchaser document reference is 331469-2019.
This tender falls under Materials and Products, Technology and Equipment in Hungary. Suppliers in these sectors can track similar Hungary tenders using CPV-based alerts.