Contract notice: Solar photovoltaic modules Tender - 41893640
Tender notice from Poland, published on 27 Mar 2020.
Executive Summary
The GMINA SŁAWATYCZE has issued a Tender notice for the procurement of a Contract notice: Solar photovoltaic modules in the Poland. This Tender notice was published on 27 Mar 2020 and is scheduled to close on 29 Apr 2020, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 41893640, while the tender notice number is 147436-2020 and Register on the platform.
Object of the contract Solar photovoltaic modules Description: Contract notice: Solar photovoltaic modules Authority Type: Regional or local authority Contact Nature: Supplies Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 09331200, 09331200, 45300000, 45311200, 45315300, 44112000, 51700000, 09331200, 45300000, 45311200, 45315300, 44112000, 51700000, 45331110, 45332000, 42511110 CPV Description: Solar photovoltaic modules. Building installation work. Electrical fitting work. Electricity supply installations. Miscellaneous building structures. Installation services of fire protection equipment. Boiler installation work. Plumbing and drain-laying work. Heat pumps. Supply and assembly of photovoltaic installations, biomass boilers and heat pumps in the commune of Sławatycze under the project "SŁAWATYCZE - COMMUNE WITH ENERGY " Reference Number: Z.271.3.2020 The subject of the order is the supply and installation of photovoltaic installations, biomass boilers and heat pumps in the commune of Sławatycze, which is implemented as part of the project" SŁAWATYCZE - COMMUNE WITH ENERGY ". Main Site: Area of the Sławatycze Commune. 1. Supply and assembly of photovoltaic installations in the commune of Sławatycze, including: 1)delivery and assembly based on the technical documentation possessed by the Employer 59 sets of photovoltaic installations together with the structure adapted to the place of assembly, including: a) roofs of residential buildings of individuals: 16 sets of photovoltaic installations, each consisting of 7 pcs solar panels with a total capacity of min. 2.17 kWp, - 41 sets of photo installationsvoltaic panels consisting of 10 pcs. total solar panels with a capacity of min. 3.1 kWp, b) installed on the roofs of public buildings: - 1 set of photovoltaic installations consisting of 36 photovoltaic panels with a capacity of min. 11.52 kWp on the roof of the sewage treatment plant building in Sławatycze, - 1 set of photovoltaic installations consisting of 36 pcs of solar panelswith a minimum power of 11.52 kWp on the roof of the building of the Commune Office in Sławatycze. 2) installation of photovoltaic panels on the structure intended for designated installation, 3) installation of inverters and other devices, 4) installation of complete wiring, 5) installation of overvoltage protections, 6 ) supplying AC wires to the existing fuse block of the building and adapted for connectionof the new circuit, 7) preparation of as-built documentation, 8) all other work necessary to recognize the task as complete, 9) you will carry out tests and control measurements 10) performance min. 4 photos, one for panels, the other for the inverter, third for the wiring, fourth for the obtained value of protective grounding in such a way that the meter reading and terminal can be seenat the control, 11) preparation of 2 as-built documentation in paper version and electronic version ripped on a mobile device, for as-built documentation attach a copy of the set notifications to PGE, 12) programming and commissioning of the automation system together with connecting the WLAN communication modem to the controller in order to read the parameters of energy yield via the Internet dla min. 8 pcs of photovoltaic installations, including: 2 pcs for installations with a minimum power of 2.17kWp, 4 pcs for installations with 3.1kWp and 2 pcs for installations with a capacity of min. 11.52 kWP. 2. The detailed scope of work (Description of the Object of the Order) is included in Annex 1a to the ToR (part 1 of the order photovoltaic installations). —6.1. Contractors who are not eligible for the contractare subject to exclusion and meet the conditions set out by the Employer for participation in the procedure, provisions: The Employer does not specify the condition in the abovementioned range. —7.1. From procurement proceduresand a Contractor shall be excluded in relation to which any of the circumstances referred to in art. 24 paragraph 1 points 12-23 of the PPL, —7.2. The contracting authority provides for exclusion grounds specified in art. 24 paragraph 5 points 1, 2, 4 and 8 of the Public Procurement Law, 8.1. The Contractor is obliged to submit together with the offer, via the miniPortal: https://miniportal.uzp.gov.pl, valid as at the date of submitting the offera declaration constituting a preliminary confirmation that the Contractor: a) is not subject to exclusion, b) meets the conditions for participation in the proceedings -8.2. specified in the implementing regulation of the European Commission 2016/7 of 5.1.2016 issued on the basis ofknows Article 59 (2) of Directive 2014/24 / EU, hereinafter referred to as the "Single Document" or "EAT" by of Annex 4 to the ToR, 8.3. The Contractor within 3 days from the date of posting on the contracting authority`s website the information referred to in art. 86 section 5 of the Act (information from the opening of offers), is obliged to provide the Ordering Party with a declaration of belonging or not belonging to thisof the capital group referred to in art. 24 paragraph 1 point 23 of the Act. In the case of belonging to the same capital group, the Contractor may submit, together with the declaration, documents or information confirming that links with another Contractor do not lead to distortion of competition in the proceedings. A model declaration is attached as Annex 5 to the ToR, —9.6. The Employer requests from the Contractor, which consistson the abilities or situation of other entities on the principles set out in art. 22a of the Public Procurement Law, submitting with respect to these entities the documents listed in point 8.7.2 SIWZ, —9.8. Contractor, who refers to the resources of other entities, in order to demonstrate the lack of existence of grounds for exclusion and fulfillment, in so far as it refers to their resources, the conditions for participation in the postEATING submits also regarding these entities, 10.2. In the case of Contractors jointly applying for the contract: a) None of them may be subject to exclusion due to failure to comply with the conditions referred to in art. 24 section 1 and section 5 point 1, 2, 4, 8 of the Public Procurement Law, while the fulfillment of the conditions for participation in the proceedings of the Economic Operators demonstrate in accordance with point 6.2 of the ToR. The Employer does not specify pof a particular way of fulfilling the condition by Contractors jointly applying for the award of the contract. b) the Single Document referred to in point 8.2 The Terms of Reference are submitted by each of the Contractors jointly applying for the contract. These documents confirm compliance with the conditions for participation in the procedure and the absence of grounds for exclusion to the extent that each of the Contractors demonstrates compliance with the conditions for participationu in the proceedings and no grounds for exclusion, c) Declaration of belonging to the same capital group as referred to in point 8.3 of the ToR is submitted by each of the Contractors, d) They are obliged at the request of the Employer, submit documents and statements, about referred to in point 8.7 of the ToR, with the documents and statements referred to in: 8.7.1 The ToR shall submit the Performers accordinglyca / the Contractors who / who indicate the fulfillment of the condition, in the scope and on the principles described in point 6.2 ToR, - in item 8.7.2 SIWZ consists of each of the Contractors, in section 8.7.3 SIWZ is submitted respectively by the Contractor / Contractors, who / who shows confirmation of compliance by the offered supplies with the requirements specified by the Employer - 6.2.2. economic or financial situation The Purchaser does not specifycondition in the above range. Continued point III. contained in Section III.1.3): In the scope of part 3 of the contract: a) technical card (technical specification of the manufacturer) of the heat pump for preparing CWU signed by the manufacturer`s representative or the entity authorized to represent the producer or distributor of equipment on the Polish market, including information confirming compliance by steam pumpmeters contained in the detailed description of the subject of the contract constituting Annex No. 1c to the ToR in accordance with point 5.2.1 of the project. B) a certificate confirming the compliance of heat pumps with the PN-EN 16147: 2017-04 standard or with equivalent standards issued by a conformity assessment body in accordance with art. 30b paragraph 1 of the Public Procurement Law 8.10. If the Contractor has its registered office or place of residence outside the Rzeczypos territoryPolish policy, instead of the documents referred to in: a) pt. 8.7.2 lit. a) ToR - submits information from the relevant register or, in the absence of such register, another equivalent document issued by the competent judicial or administrative authority of the country in which the Contractor has its registered office or place of residence or domicile, the person to whom the information or document relates, aboutoutlined in art. 24 paragraph 1 point 13), 14) and 21) of the Public Procurement Law; b) point 8.7.2 lit. b) - d) ToR - submits a document or documents issued in the country in which the Contractor has its registered office or place of residence, confirming accordingly that: - he is not in arrears with the payment of taxes, fees, social security or health insurance contributions or that he has concluded an agreement with competent authority regarding the repayment of these claimsand together with any interest or fines, in particular, he obtained the exemption provided for by law, deferment or distribution in installments of overdue payments or withholding in full the execution of the decision of the competent authority, - its liquidation was not opened or bankruptcy was declared, 8.11. Documents referred to in item 8.10 lit. a) and lit. b) the second indent of the ToR, should be issued not earlier than6 months before the submission deadline. The document referred to in item 8.10 lit. b) the first indent of the ToR, should be issued not earlier than 3 months before the expiry of this period, 12.1. The Contractor is obliged to provide a deposit of: 12.1.1. for lot 1 of the contract: PLN 20, 000.00, 12.1.2. for lot 2 of the contract: PLN 5, 000.00, 12.1.3. for lot 3 of the order: P 10, 000.00LN -13.2. The offer should be made in Polish, in electronic form in one of the following data formats: .pdf, .doc, .docx, .rtf, .xps, .odt and signed with a qualified electronic signature, otherwise it shall be null and void. The method of submitting the offer, including the encryption of the offer, is described in the Regulations of using the miniPortal (https://miniportal.uzp.gov.pl/WarunkiUslugi.aspx), - The contracting authority does not envisage the award of contracts referred to in art. 67 section 1 point 6 and 7 of the Public Procurement Law, - The two-month deadline specified in Section IV.2.6) shall be understood as 60 days from the set date for submission of tenders, - Detailed information on the conditions of participation in the proceedings is included in Chapters 6, 7 and 8 SIWZ, - Due to the limited number of characters that can be enteredenter the content of the announcement, other information is contained in the Terms of Reference available together with this announcement on the Awarding Entity`s website at: www.slawatycze.biuletyn.net from the Public Order tab. Internet address (URL): www.slawatycze.biuletyn.net
The bid deadline for Contract notice: Solar photovoltaic modules was 29 Apr 2020. Bidding is closed.
This tender has been issued by GMINA SŁAWATYCZE in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 09331200 - Solar photovoltaic modules, 45300000 - Building installation work, 45311200 - Electrical fitting work, 45315300 - Electricity supply installations, 44112000 - Miscellaneous building structures, 51700000 - Installation services of fire protection equipment, 45331110 - Boiler installation work, 45332000 - Plumbing and drain-laying work, 42511110 - Heat pumps.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 41893640. The purchaser document reference is 147436-2020.
This tender falls under Power and Energy, Construction and Real Estate, Materials and Products, Defence and Security, Technology and Equipment in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.