The MAT - OBALY, S.R.O. has issued a Tender notice for the procurement of a Contract notice: Solar installation in the Slovakia. This Tender notice was published on 18 Dec 2017 and is scheduled to close on 01 Feb 2018, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 19198398, while the tender notice number is 502601-2017 and Register on the platform.

Key facts

Summary
Contract notice: Solar installation
TOT Ref. No.
19198398
Document Ref. No.
502601-2017
Country
Slovakia
Notice type
Tender
Competition
ICB
Publication date
18 Dec 2017
Bid deadline
01 Feb 2018
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

09332000Solar installation
31712331Photovoltaic cells
71320000Engineering design services

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Solar installation
Description: Contract notice: Solar installation
Authority Type: Other
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: Lowest price
CPV code: 09332000, 31712331, 71320000, 09332000, 31712331, 71320000
CPV Description: Photovoltaic systems
Photovoltaic cells
Engineering design services
Supported photovoltaic systems into the MAT object - Covers
Reference Number: 1 ndl / 2017
The subject of the contract is the supply and installation of goods resulting in a supportive photovoltaic system, effectiveness of the company.
Main Site: Handlova, production building on LV no. 5598, p. u. Handlova, built on plot no. 3736/10, p. no. 1812.
The subject of the Supply will be a supportive photovoltaic system which ensures the production of electrical energy in a photovoltaic device for its own consumption. The planned annual output is 110, 000 kWh / year. The device must be able to provide a 115 kVA min output with a min. 140 kWh at C5 and with cycles at 50% DOD min. 2000.
Requirements nand photovoltaic system:
Required installed performance from min. 99 kWp
Nominal output of min. 130 kVA
Resource raise time 20 milliseconds
Included in delivery will be installation, function tests, revision
Except for the supply will be the project documentation.Public procurement may be awarded only to the applicant who fulfills the following conditions in part concerning:
Personal status
1.The player must meetthe conditions of part time stipulated in the provision of - 32 par. 1 of the Act on Public Procurement and their fulfillment of proofs by submitting documents pursuant to the provisions of Section 32, par. 2 resp. ods. 4 or 5 of the Public Procurement Act, respectively. pursuant to Section 152 of the Public Procurement Act. Public Procurer (person pursuant to Section 8 of the Public Procurement Act) pursuant to the provisions of - 40 par. 6 sheets. g) the public procurement lawor the public procurement of the applicant if, on the basis of reliable information, I believe that the tenderer has entered into an agreement to interfere with the economic activity in the given public procurement with another economic entity. 2. The applicant who is a contractor of a group of contractors shall prove compliance with the terms of the contract to a person's position, behind each individual member of the groupno, the right to supply goods, to perform construction works or to provide a service shall be demonstrated by a member of the group only in relation to the part of the subject of the order which he / she is required to secure. Section 39 of the Public Procurement Act may temporarily replace the economic operator'sfulfillment of the terms and conditions stipulated by the Contracting Authority or the Contracting Authority by means of a single European document (JED), the documents proving the fulfillment of the conditions of the partial submission to the contracting authority by the applicants, placed in the 1st to 3rd place in the order pursuant to - 55 par. 1 of the Public Procurement Act, in time and in part designated by the contracting authority. Manual to fill poisonEuropean document is published on the UVO web site.
http: //www.uvo.gov.sk/legislativametodikadohlad/jednotny-europsky-dokument-pre-verejne-obstaravanie-553.html JED contains an updated statement of the economic entity that: (a) there is no evidence of its exclusion; (b) provide the contracting authority or the contracting entity, on request, with documents which have been replaced by the JED.Removing the non-award of the contract: The preamble to the EP and R 2014/24 / EU Directive on public procurement and the repeal of Directive 2004/18 / EC implies that, if the contracting authority decides that the procurement would not be proportionate, although the need for co-ordination between individual suppliers of part of the order could pose a serious risk to the dangers of proper performance-
The subject of this order is the supply of a single logical unit. Each supplier has specific procedures for creating a logical unit, so the most important modulation is precisely tailored - tailor-made / custom-tailored according to the customer's order. The composition of the photovoltaic devices is created according to the exact requirements of the contracting entity. If the individual parts supplied by the different manufacturers become high, the incompatibility of the individual components and the risk of not achieving the required performance. It follows from this that individual components, including accessories, form a logical whole. From the point of preserving the functionality, quality and economy and efficiency, it is essential that goods are logically assembled and supplied by one supplier logically.
In the present case, the public procurer after the documentand the subsequent consideration of the consequences of the possible division of the subject-matter of the contract into parts, on the basis of all of the foregoing, that if the procurers divide the object of the contract into parts, within which they would allow the tenderers to submit tenders for separate parts of the bid, there could be several different successful suppliers, so the need for coordination individuallyof the suppliers of the part of the order which would be necessary for the proper performance of the entire procurement subject could constitute a serious risk of jeopardizing the proper performance of the procurement. As a result of the market research carried out, it is clear that there are several entities on the market who can prove the subject of the bid as a whole, on the basis of which it is possible to secure a sufficient market economy. For whominformation and exchange of information is proceeded by the public contracting authority pursuant to - 187 par. (3) The Public Procurer (a person according to - 8 of the Public Procurement Act) provides unrestricted access to the tender documents and other information necessary for the preparation of an offer in the public burglar's profile on the UVO web site (www.uvo.gov. sk;) in the .pdf format and in the webaccording to the contracting authority http://www.mat-obaly.sk/o-compolocnostie the announcement of the public procurement from the profile, by e-mail to the address of the contact point: [email protected], with contact details for the purposes of providing explanations of the data stated in the tender notice, the tender documents, and with the date of withdrawal of the substrates from the profile. In case an applicant / observer fails to send this infocontact person, the contracting authority is not responsible for failing to provide explanations of the information contained in the tender notice and the tender dossier. The public contracting authority (the person under - 8 of the ZVO) advises all interested parties to take their own interest during the entire procurement process to monitor the profile of the contracting authority (the persons under - 8 ZVOi)on that web page.
Internet address (URL): http://mat-obaly.sk
Directive: Classical Directive (2014/24/EU)

Documents

Tender Notice
Login to view

Similar tenders

Slovakia Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Solar installation was 01 Feb 2018. Bidding is closed.

This tender has been issued by MAT - OBALY, S.R.O. in Slovakia.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 09332000 - Solar installation, 31712331 - Photovoltaic cells, 71320000 - Engineering design services.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 19198398. The purchaser document reference is 502601-2017.

See the Similar Tenders section on this page or browse other tenders from Slovakia.

This tender falls under Power and Energy, Defence and Security, Construction and Real Estate in Slovakia. Suppliers in these sectors can track similar Slovakia tenders using CPV-based alerts.