Contract notice: Roof works and other special Tender - 20390859
Tender notice from Poland, published on 07 Feb 2018.
Executive Summary
The BIBLIOTEKA NARODOWA has issued a Tender notice for the procurement of a Contract notice: Roof works and other special trade construction works in the Poland. This Tender notice was published on 07 Feb 2018 and is scheduled to close on 15 Mar 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 20390859, while the tender notice number is 052395-2018 and Register on the platform.
Key facts
Summary
Contract notice: Roof works and other special trade construction works
Object of the contract Roof works and other special trade construction works Description: Contract notice: Roof works and other special trade construction works Authority Type: Body governed by public law Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45260000, 45262660, 45261210, 45111300, 45111100, 45111220, 45261214, 45312311, 45300000, 45311000, 45261215, 45320000, 45260000, 45262660, 45261210, 45111300, 45111100, 45111220, 45261214, 45312311, 45300000, 45311000, 45261215, 45320000 CPV Description: Roof works and other special trade construction works. Asbestos-removal work. Roof-covering work. Dismantling works. Demolition work. Scrub-removal work. Bituminous roof-covering work. Lightning-conductor installation work. Building installation work. Electrical wiring and fitting work. Solar panel roof-covering work. Insulation work. Docieplenie stropodachu niewentylowanego warstwą docieplającą i-the contracting and roofing with thermo-weldable roofing paper, delivery and installation of photovoltaic panels Reference Number: XIV / 264/2/18 The subject of the contract is construction works consisting of non-ventilated under-insulation of the insulation and insulating layer, roofing with thermo-weldable roofing paper and delivery with the installation of solar panels as part of the implementation of the Project POIS.01.03.01-00-0057 / 16: "Energy modernization in buildings" A "of the National Library at 213 Niepodległości Avenue in Warsaw" on the basis of a signed co-financing agreement no POIS.01.03.01-00-0057 / 16-00 dated 21.12 .2016 together with Annex no. POIS.01.03.01-00-0057 / 16-01 from 05/06/2017 and Annex no. POIS.01.03.01-00-0057 / 16-02 from October 6, 2017 as part of sub-measure 1.3.1 priority axisowa I Reduction in the emissivity of the economy of the Operational Program Infrastructure and Environment 2014 - 2020. Main Site: Biblioteka Narodowa, al. Niepodlegoście 213, 02-086 Warsaw. Przedm. Order. It includes in particular: 1. replacement of insulating layers, including thermal insulation of flat roofs A1 - A6 BN with removal of existing insulating layers of flat roofs containing asbestos and making new ones-roof layers, including: a) demolition and protection works, b) covering works, c) export and utilization. debris and asbestos, d) preparation of a complete documentation. 2. I will provide and assemble photovoltaic panels. in BN buildings in the building A3, A4, A5 and A6, including: a) installation of switchgears and electrical devices, b) inst. cable routes, c) laying of wires and cables, d) preparation of installation equipment - photovoltaic, e) installation of photovoltaic panelsf) laying the earthing and lightning protection system, g) exc. connections, h) lect. connection of the system with an existing installation, i) lecture prob and electrical measurements, j) commissioning of the installation along with user's training and making necessary formalities with the network manager, k) preparation of complete post-execution documentation, 3. staging. work necessary for the proper implementation of the pre-assembly, in accordance with design and conditionsami tech. and applicable law regulations; is divided into the following stages of work: 1.Etap I - non-ventilated roof insulation. A4, A5, A6 buildings with thermal insulation and roofing layer, and roofing with heat-sealing tarpaulin (Annex 4 to SIWZ - Annex No. 1a to OPZ - pictorial drawing - Stage I) by: 1) Separation works: a) camp. outer layers (gravel, roofing paper, concrete, styrofoamn), b) DISARMED. ballast layers, c) break cover with roofing felt on concrete roofs, d) break. insulating layers, e) forging concrete; 2) Disassembly and utilization of asbestos layers: a) disassembly; cover asbestos - cement, b) export and utilization of debris resulting from asbestos covers. - cement., c) export and utilization. other waste; 3) Cover works: a) lect. compensating layers, b) lect. undercoat layer with thermoseal roofing felt, c) exc. layerssurface finish with thermo-rubber roofing paper, d) exc. thermal and ballast layers, e) replacement and adjustment of the lightning protection system, f) other elements of the roof finish: i.woplenie atttyk, ii.wyk. tinsmithing, iii. the laying of concrete slabs - pavement, iv.wyk. horizontal and vertical dilatation, v.fire-burning ventilation. and cover (roofs) chimney; 4) The lecture and handing over the documentation. Stage I.2.Etap II2.1 Stage II part 1 - access and assembly of photovoltaic panels. in the building A3, A4, A5, A6 BN (Annex No. 4 to the Terms of Reference - Annex No. 1b to the OPZ - pictorial drawing - Stage II part 1) covering: 1) Access. and installation of photovoltaic panel installations, including: a) photovoltaic panels, b) electrical switchboards, c) inverters, d) cable routes, e) wires and cables, f) installation equipment and devices, 2) Run. and configuration. photovoltaic panels. together with the constr.support; 3) Control and lightning connections; 4) Testing and electrical measurements made instances and making the necessary formal with the network manager; 5) Execution and submitting the documentation of the above. Stage II part I along with the training of employees Zam.; 2.2 Stage II part 2 - doc. flat roof unenthusiastic. house. A1, A2, A3, with a dociepl layer. and balanced. and roofing with thermo-weldable roofing paper (Annex nr 4 to SIWZ - Annex 1c to OPZ - pictorial drawing - Stage II part 2) through: 1) Demolition works: a) disassembly of top layers (gravel, roofing paper, concrete, polystyrene), b) disintegration ballast layers, c) break cover with roofing felt on concrete roofs, d) separation of insulating layers, e) forging concrete; 2) Disassembly. and the disposal of asbestos layers: a) dismantling asbestos. - cement., b) export and utilization. debris formed from covers azbest. - cement., c) export and utilization. other waste; 3) Cover works: a) check of the leveling layers, b) lining of the thermal insulation layer, c) design of the topcoat from heat-welded roofing paper, d) thermal and ballast layers, e) replacement and adaptation of the inst. Lightning protection, f) Execution of other elements of the roof finish, i.e .: insulated attic, ii. tinsmith's works, iii. positioned themselvese plates bet.-longitudinal, iv. execution of dilatation level. and pion., v. fireplace repair went and cover (roofs) fireplace. 4) Execution and transfer of documents above. Stage II part 2. The ordering party does not set a specific condition in this respect. To meet the condition regarding the economic situation, the contractor must prove that he is insured against civil liability in respect ofactivities related to the subject of the order for a guarantee sum in the amount of at least PLN 2 600 000.00 (in words: two million six hundred thousand zlotys). To meet the condition regarding the financial situation, the contractor must prove that he has the financial resources or creditworthiness not less PLN 1, 500, 000.00 (in words: one million five hundred thousand zlotys). Attention they orderIn the case of providing information in a bank or social savings and credit union confirming the amount of financial resources held or the contractor's creditworthiness value in a foreign currency, the Employer will convert this value into PLN according to the average NBP exchange rate (Table A) for a given currency from on the day of placing the contract notice in the U Official JournalEuropean Union. If on the day of publishing the announcement in the Official Journal of the European Union there were no NBP publications of average exchange rates (Table A), the Employer shall convert this value into PLN according to the average NBP exchange rate (Table A) for the given currency on the first day after the announcement on the contract in the Official Journal of the European Union in whichm were published by the National Bank of Poland for average exchange rates (Table A). Note: The period of being bound by the offer is 60 days. The 2-month period indicated in point IV.2.6 results from the inability to include in the advertisement the period expressed in days. Detailed information and requirements of the ordering party are included in the order-SIWZ documents.Contractors who are not subject to exclusion from participation. The Contracting Authority will consider that the Contractor is not subject to exclusion from participation in the public procurement award procedure if none of the conditions indicated in art. 24 sec. 1 point 12-23 of the Public Procurement Law and indicated by the ordering party in chapter Va SIWZ optional prerequisite referred to in art. 24 sec. 5 point 8 of the Public Procurement Law, -subject to the instructions contained in art. 24 sec. 7-10 and 12 Public Procurement Laws A. Declarations and documents attached by the contractor to the offer: 1) valid as of the day of submitting the offer a statement in the form of a Single European Order Document, hereinafter referred to as "EAT", prepared in accordance with the standard form set out in the Commission Implementing Regulation issued onArt. 59 par. 2 of Directive 2014/24 / EU. The Contractor who refers to the resources of other entities, in order to demonstrate the absence of grounds for exclusion and fulfillment in relation to them, to the extent that they refer to their resources, the conditions for participation in the proceedings, submit "EAT" regarding these entities. applying for orders by Contractors, "EAT" is submitted by each of the excerptsonowners jointly applying for the order. These documents confirm the fulfillment of the conditions for participation in the proceedings and the lack of grounds for exclusion to the extent that each of the contractors demonstrates fulfillment of the conditions for participation in the proceedings and the lack of grounds for exclusion. 2) Obligations of another entity referred to in art. 22a paragraph 2 of the Public Procurement Law, to provide the contractor with the necessary resourcesow for the needs of order processing, if the Contractor relies on the ability or situation of other entities to confirm compliance with the conditions for participation in the proceedings; 3) power of attorney, if the offer and attached statements and documents are signed by a person not listed as a person authorized to represent the contractor in free and freely available registersbowing to the Contractor. B. Declaration of belonging or non-affiliation to the same capital group within the meaning of the Act of 16.2.2007 on competition and consumer protection (Dz.Uz 2016, poz.184, 1618 and 1634): Contractor, within 3 days from posting information on the website referred to in Article 86 of the 5 of the Public Procurement Law, submits to the Ordering Party a declaration of belongingor no affiliation to the capital group itself, referred to in Article 24 sec. 1 point 23 of the Public Procurement Law, as well as contractors who have submitted separate offers. Model of the above the statement will be posted on the website by the ordering party simultaneously with the information referred to in art. 86 par. 5 Public Procurement Law. C. Documents and declarations submitted to the ordering party's request: in purposein demonstrating the lack of grounds for exclusion of the contractor in the circumstances referred to in Article 24 of the Public Procurement Law, the contracting authority requests declarations and documents specified in the Regulation of the Minister of Development of 26.7.2016 on the types of documents that the contracting authority may request from the contractor in the procurement procedure (Journal of Laws item 1126), hereinafter referred to as the Regulation, in -5 point 1, point 2, point 3, point 5, point 6, point 9, point 10. In the case when the contractor relies on the abilities or situation of other entities on the terms specified in art. 22a of the Public Procurement Law, the orderer demands submission, in relation to these entities, of documents specified in the Regulation in -5 point 1, point 2, point 3, point 5, point 6, point 9. If the contractor has a registered office or place of residence outside the territory of the Republic of Polandof the aforementioned documents in accordance with -7 para. 1-3 of the Regulation Internet address (URL): http://www.bn.org.pl Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Roof works and other special trade construction works was 15 Mar 2018. Bidding is closed.
This tender has been issued by BIBLIOTEKA NARODOWA in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45260000 - Roof works and other special trade construction works, 45262660 - Asbestos-removal work, 45261210 - Roof-covering work, 45111300 - Dismantling works, 45111100 - Demolition work, 45111220 - Scrub-removal work, 45261214 - Bituminous roof-covering work, 45312311 - Lightning-conductor installation work, 45300000 - Building installation work, 45311000 - Electrical wiring and fitting work, 45261215 - Solar panel roof-covering work, 45320000 - Insulation work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 20390859. The purchaser document reference is 052395-2018.