Contract notice: Road markings Tender in Poland - 24703577
Tender notice from Poland, published on 04 Jul 2018.
Executive Summary
The GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD, ODDZIA? W RZESZOWIE has issued a Tender notice for the procurement of a Contract notice: Road markings in the Poland. This Tender notice was published on 04 Jul 2018 and is scheduled to close on 14 Aug 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 24703577, while the tender notice number is 287417-2018 and Register on the platform.
Object of the contract Road markings Description: Contract notice: Road markings Authority Type: Ministry or any other national or federal authority Contact Nature: Supplies Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 34922100, 34928420, 34928460, 34928470, 34922100, 34928420, 34928460, 34928470 CPV Description: Road markings. Road-danger lamps. Road cones. Signage. Execution and delivery of vertical markings set along national roads administered by the Branch in Rzesz-w GDDKiA within four years from the date of conclusion of the contract. Reference Number: O.RZ.D -3.2414.4.2018 The subject of the order is: Execution and delivery of vertical markings set by national roads administered byez Branch in Rzesz-w GDDKiA in the period of four years from the date of the contract. Main Site: Poland, eastern macroregion, province of Podkarpackie. The subject of the order is: Execution and delivery of vertical markings set by national roads administered by the Branch in Rzesz-w GDDKiA within 4 years from the date of the contract. Signs should be provided in quantities and ranges givenin the List of marks constituting Annex No. 1 to the Detailed Description of the subject of the order, and on the basis of detailed listings provided from the Employer's units during the order. The order includes the following supply ranges: - Signs and boards with face type I foil made of galvanized sheet fire with double curved edges; - Signs and boards reflectsskins with a face of type II foil made of aluminum sheet framed in a frame, - Signs and reflective boards with a face of III type foil (micro-prismatic foil) made of aluminum sheet framed in a frame, - Signs and reflective boards with a face of foil type II made of hot-galvanized sheet steel with double-curved edges, - Electronic signs active, - Sign handles for metal postsuniversal, - Support constructions for signs and tables. Total estimated order value: between 144, 000 EUR and 10, 000, 000 EUR. Not applicable. Not applicable. 1. Offers should be placed at the registered office of GDDKiA Branch in Rzesz-w at ul. Legion-w No. 20, in the Kancelaria-Dziennik Podawczy. 2. The Contractor is obliged to attach to the offer an official statement, valid as at the day of submitting bidswhich constitutes the preliminary confirmation that the Contractor: a) is not subject to exclusion, b) meets the conditions for participation in the proceedings. 3. The statement referred to in point 9.1. IDW (in the form of a single European order document drawn up in accordance with the standard form provided for in the European Commission's implementing regulation issued on the basis of Article 59 (2) of Directive 2014/24 / EU, hereinafter referred to as "single document" or "EAT"), the Contractor is obliged to send the Ordering Party in an electronic form with a qualified electronic signature. 4. Contractor who refers to the resources of other entities in order to demonstrate the lack of grounds for exclusion and compliance with them, to the extent in which he relies on their resources, the conditions for participation in the proceedingsment, it shall submit uniform documents regarding these entities. According to the information contained in the EED, if it is relevant to the specific capacities on which the contractor is based, it must be enclosed for each of the entities to which the information required in Part IV of the EAT is attached. entities making the potential available on the EAT form should be in the form of an electronic document, signed with a qualified electronic signature by each of these entities to the extent that they confirm the circumstances referred to in art. 22 ust. 1 of the Public Procurement Law. They should be sent in electronic form with a qualified electronic signature. 5. At the request of the Ordering Party, in order to confirm the lack of grounds for exclusion of the Contractor from participation in the proceedings, the Contractoris bound to submit information, certificates, excerpt and statements referred to in - 5 items 1 to 6 and 9 and 10 of the Regulation of the Minister of Development of 26.7.2016 on the types of documents that the contracting authority may request from the contractor in the proceedings for ordering (Journal of Laws of 2016, item 1126). 6. If the Contractor is established or resides outside the territory of the Republic ofolita Polska, as well as in the case where the person concerned by a given document is residing outside the territory of the Republic of Poland, the principles set out in - 7 and 8 above apply. Regulation. 7. Contractor, within 3 days from the date of posting on the website information referred to in art. 86 par. 5 of the Public Procurement Law, it provides the orderer with a declaration of belonging orlack of belonging to the same capital group, referred to in art. 24 sec. 1 point 23 of the Public Procurement Law. With the submission of a statement, the Contractor may provide evidence that links with another Contractor do not lead to distortion of competition in the procurement procedure. The contractor is excluded from the contractor in respect of which any of the circumstances occursreferred to in Article 24 sec. 1 point 12 of the Public Procurement Law and art. 24 sec. 5 points 1, 2 and 4 and 8 Public Procurement Laws 9. The ordering party, in accordance with art. 24 aa of the Public Procurement Law, provides for the possibility of first of all assessing the offers, and then investigating whether the Contractor whose tender has been assessed as the most advantageous is not subject to exclusion and meets the conditions for participation in the procedure. The periodthe offer referred to in point IV.2.6) of the announcement is 60 days. The period of being bound by the offer starts as soon as the deadline for submission of tenders expires. 11. The Contracting Authority does not provide for the possibility of ordering, referred to in art. 67 sec. 1 point 6 of the Public Procurement Law Act, consisting in repeated similar services consistent with the subject of the basic order Internet address (URL): www.gddkia.gov.pl Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Road markings was 14 Aug 2018. Bidding is closed.
This tender has been issued by GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD, ODDZIA? W RZESZOWIE in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 34922100 - Road markings, 34928420 - Road-danger lamps, 34928460 - Road cones, 34928470 - Signage.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 24703577. The purchaser document reference is 287417-2018.