Expired Tender Hungary ICB TOT Ref. 15644901

Contract notice: Road construction works Tender in Hungary - 15644901

Tender notice from Hungary, published on 12 Aug 2017.

Exeutive Summary

The NIF ZRT. has issued a Tender notice for the procurement of a Contract notice: Road construction works in the Hungary. This Tender notice was published on 12 Aug 2017 and is scheduled to close on 20 Sep 2017, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 15644901, while the tender notice number is 318606-2017 and Register on the platform.

Key facts

Summary
Contract notice: Road construction works
TOT Ref. No.
15644901
Document Ref. No.
318606-2017
Country
Hungary
Notice type
Tender
Competition
ICB
Publication date
12 Aug 2017
Bid deadline
20 Sep 2017
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Road construction works
Description: Contract notice: Road construction works
Authority Type: Body governed by public law
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45233120, 45233120, 45100000, 45110000, 45111000, 45112700, 45221100, 45221110, 45221111, 45223700, 45223710, 45231220, 45231300, 45231400, 45231600, 45232450, 45233000, 45233100, 45233120, 45100000, 45110000, 45111000, 45112700, 45221100, 45221110, 45221111, 45223700, 45223710, 45231220, 45231300, 45231400, 45231600, 45232450, 45233000, 45233100
CPV Description: Road construction works.
Site preparation work.
Building demolition and wrecking work and earthmoving work.
Demolition, site preparation and clearance work.
Landscaping work.
Construction work for bridges.
Bridge construction work.
Road bridge construction work.
Service area construction work.
Motorway service area construction work.
Construction work for gas pipelines.
Construction work for waterand sewage pipelines.
Construction work for electricity power lines.
Construction work for communication lines.
Drainage construction works.
Construction, foundation and surface works for highways, roads.
Construction work for highways, roads.
Vallalkozasi szerződes M4 gyorsforgalmi ut Cegled-Abony koezoetti szakasz es kapcsolodo letesitmenyei (73 235 90 859 km sz.) kivitelezesi munkainak elveg
Reference Number: PST code: K004.28
Veszalkozasi authordes M4 expressway Cegled-Abony koezoetti szakasz -s kapcsol-d-si k-n-latai (73 235 90 859 km sz.)
Main Site: Hungary, Pest megye
- 2x2 sloping expressway with 3, 75 m wind turbines, 26, 60 m crown lacquer with stabilized urea acid vt = 130 km / h design speeds
17.6 km M4 motorway epithet as follows:
- existing 2x2 apiopiline trail: 73 235-79 230 km no. (Existing 8, 25 m winding, 26, 60 m crown),
- existing expansion 2x1 foam in 2x2 flour: 79 230-90 859 km no. (7, 75 m in length,
13, 80 m crown),
- Sections: 2 pieces (401, 3122), -You can find the following: 2x1 savos ut 1 (401 ut), 2x1 savory patches 2 (3119, ut 3122),
- Crossing of main planes Omen's paths: 2x1 savory cladding 2 pieces, foeldut 1 (F101, F102, F103, F104, F105, F106, F107, F201, F102, F102, F102, F102, F202, F203, F204),
- Fabric rings: 8 pieces (1 piece available-Rebuilding of the feluajaro, 3 rebuilding of the existing alulus, 4 epiphase of the lower alulus), which are the largest free drift: 25.1 m,
- Uezemi Hirkoezlesi Koeszpont telepeszese,
- Varhato Koezmű crosses:
- Crushing wings,
-, Koezep tensile wires,
- Ivoviz wastewater conduits,
- Synodic conductors,
- Other excercise interventions:
- Koezvilagitas,
- UezeWhat are the advantages of the system - What is the difference between the energy and the energy - Hydrocrystalline energy, - - Water and wastewater treatment, - - Water treatment tasks, (soil parks, Resting on 86 200 km,
- Noise walls: 1708 m long,
- Additional tasks to be carried out:
- Telekallitas
- Completion of the plan for the execution of the plans and the execution of the plans.
- The connection of the contractor to the existing trial order.
--
- Approval of the co-operative permits (with electric conductors with EVD), obtaining a license for a water license.
- Electricity connection points technical-economical search of the object, And the connection points-- - The FIR integration of the FIR integrators of
- UeHK escorts.
- In the executed designs of the Vallalkozo subcontractors, the chairman and designer of the subordinates are:
- Prior to the beginning of the phase,
- Hungarian Koezut Nzrt. k(M8-M4), and the M4-M4 motorway section (M8-M4), and the M4 motorway section (M8-M4). Reszet.tetel breast. Reason: Targyi fastf. The passage is oenalloan epithetic, separated by oneIt is not justified because of technical, traffic and epithetic eyes. According to our point of view, in the case of disaggregation, the feasibility of this aspect would cause problems of this kind, which would lead to the implementation of the oessandangolas, the rendering of the work and the testing. This is reinforced by the relatively rovine epithetic phase. Eppen's the one(A) Kizaro Reasons:
You may not be a time-consuming, underserved, and may not be eligible for a commercial registration of a Kbt. Section 62 (1) - (2) excludes the exclusion of all causes. All rights reserved. Section 74 (1) (A) and (b).
The exclusionary reasons do not exist (koezoes) aj(Hereinafter referred to as "EEKD") shall be provisionally provisionally certified as being subject to the following: 'The Kbt. Article 67 (1) If applicable, the suitably validated organization is currently tested in the case of non-payment of exclusionary grounds in EEKD-The person concerned shall have the right to make a statement by a person with an appropriate authority in accordance with 321/2015. (X. 30.) Government Decree (hereafter: Cr.) II. . In the case of a co-operative time, the co-operative timers must each submit a formatting.
EEKD is governed by -- 4 and 6-7 of the Cr. - We must summon the foundation.
We will raise the attention of our customers to the Kb. Section 64 and Section 4 para. (3) of the CR. In relation to the subprojects that do not qualify as legally valid, the Kbt. Section 67 (4) The provider of the base must be required to declare that he or she does not apply for the Kb. Article 62 (1) to (2) • The Kbt. Section 69 (4) - (6) The idolater of the idolaters is based on verses 8, 10, 12-16. - seeIt must be verified that it does not belong to the cause of the exclusionary reasons. In the case of a case file in progress, the submitter is asked to attach to the cegbirosag the registered copy of the cegbirosag and the confirmation of the cegbirosag altal (the inclusion of a negative content statement). Justification for exclusionary reasonsThe deadline for submitting the application must be no later than one day.
Appropriate prerequisites for professional activities Section 65 (1) (c)]:
Verification mod:
The provisional acknowledgment of the EEKD can be found in the Kbt. Section 67 (1) to (3) and Section 1 para. (1) of the Cr. Section 2 (5) According to EEKD IV. Including detailed data. A lentieThe application of specified documents shall be excluded from the express application of the foregoing exemption of the preliminary proof of the provisional trial. Section 69 para. (4).
NY.1.)
Provider of the registration in the register as referred to in the Kbt. (11) of Article 69. The names of the candidates in the register are as follows: 69 (11)The free verification of the relevant data or data is not available in the form of the extract from the register, the certificate issued by the body in charge of the registry or the proof of the document in the register shall be justified by a simple justification of the application. Section 65 para. (7), (9) and Article 69If the, And in the case of non-Hungarian economic operators, there is no register in the country of establishment (it is assumed that the right of the sovereign country is prescribed by law) or in the country of resident, Legal(Section 65 (1) (c) and 322/2015). (X. 30.) Korm. - 21 (1)).
Authentication mod:
The EEKD provisional confirmation is given in the Kbt. Section 67 (1) to (3) and Section 1 para. (1) of the Cr. Section 2 (5) According to EEKD IV. Including detailed data. Documents listed below bPlease note that you will not be able to exclude the express user name of the licensee for the preliminary proof of the provisional proof. Section 69 (4) of the basic Regulation.
P.1) Section 65 (1) (A) and Article 19 (1) of the Criminal Code. (In the case of a case-by-case case, any one of the co-perpetrators of the time) shall attach the sum of the daily allowances for each of the supervisors of the penitentiary, With the statement of the person present at the present time, with the following prominent and explicit content, attentively to the fact that when the handler was sent letters and letters, When it started to work if these data were available to you:
- give me a penzforgalmi szamlaszam,
- had it been over fifteen days in a queue row allitas in the 24 months preceding the dialing date.
"Sorba allitas"Under the auspices of the LXV. TV. P.2) Pursuant to the Kbt. Section 65 (1) (A) and Article 19 (1) of the Criminal Code. (C) of the basic Regulation shall be attached to the total net and during the same period of the contractual installment (koezutepites and / or felpsit)P.3) The contractor is responsible for publishing the total amount of the information displayed in the Official Journal of the European Communities. Section 65 (1) (A) and Article 19 (1) of the Criminal Code. (B) of the base date (in case of a timely event, any driver), attach his or her legal predecessor to the time(In case of a breach of the law of the country of the resident of the host country), the correspondent (s) of the last 3 years prior to the day of the lawsuit. If you are acquainted with the website of the Coginformation Service, you can find out the details of the S-minformation service by the Tender Provider, the ceginformation serviceIf the Beneficiary does not have the period of time specified in P.3, because he has begun to work after the start of the period, he / she is entitled to justify the payment of the amount of the co- . The Provider is tested by the Provider's Penzuegy -s gazdas-gi alkIf you have a hard time in the case of a hard-earned hard earned cash or cash-on collateral (AFA), you will lose HUF 10, 000, 000, 000 (-- 19 (2) of Government Decree 321/2015). He reminds us of -- 19 (3) of the Code of Ethics.
If the person who has given him / her has given the capacity of the body or personIs to be complied with, each of the organizations or persons concerned must submit a printed and submitted form (EEKD). Organizations or persons who have the capacity to do so will only declare the relevant provisions in the applicable terms, which the time-consumer may require to justify their suitability. Koezoes time out in case of a test driveAll of them must be notified of the form.
The supervisor will raise awareness of the Kb. Section 65 (7) to (8) and Section 67 (3). Experiment: 1988. year I. tv. According to Section 32 (1) of the Act. Article 69 para. (11) is irrelevant. Min and point: translated, in 2.1-2.3, 2.5. Min. E. Perspective: score. Points also have upper limits: 0-10. Details: toVabbi koez.dok.ban
2.1 ertsz-m. Est.ben M.2 alk. Koev. I will not be able to afford the experts I have shown. ert. szemp. In the case of AK, it is noted that he has been referred to Section 166 (6) (d) of the Kbt. Only from sub. Koev. The full-time projects may be awarded. Section 57 (2), AT is included in the additional dossier. compliance. It is a concession to justify it.
The time in 1 paper, In bundle and in 1 pc in electronic case at point I.3. You should send a letter or post. Up to the time limit until the deadline (person passes: 9-15 hrs, p 9-12, the deadline for the deadline is up to the deadline). According to the invention,
- AT, optionally the alk. up. Reseller BuyerEveben alairo szemely alairasi cimpld. The original v masolati peldanya, - if the right holder is authorized and the person who is the subject of the trial is also a member of the body of the law. May be in force. Original v masolati peldanya,
- AT the Kbt. -------------------------------------------------------------------------------------------------------------------------------------------- According to arrow.,
- For AT, see Section 66 (6). According to arrow. (With negative content),
- arrow. Section 65 (7) of the Kbt. Based, (with negative content),
- professional information,
- ert. reszszemp. In relation to the person skilled in the art, - an indicative resource and protocol, - - Kbt. 134 - 5; (4) b (4) bwedge. Tk draws attention, according to alk h. Confirmation Kr.28.- conditions and aspects of (3) is determined more strictly compared bek.hez III.1.1) -3 points).
The bids submitted by the dokokat Kbt.47.- (2) para. Based on a simple copy of it can be to stretch. The
Yes. 71.- (6) para. With respect, if the hianypotlassal AT involve economic operators not included in the offer by age barriers AK- AK does not use the Kbt.75 (2) (e) clause.
AK does not allow the organization of the contractor to execute the merit of the organization (project portfolio) neither ATs nor ATPs
The time security. The price is 23 000 000 HUF. Available according to the ATUT-option AT 10300002-20609931-49020322. To bank. Toertenő befiz.-With the same guarantee of the pennies in the same way as the guarantee of the v assurance handler, v assurance commissioner. Which is based on a licensed handwriting guarantor. The time security. They have the same time limit as the timescale. Atutalas, atutalas must be supported. title. AtutaThe certificate of receipt must be attached to the time limit.
AK is the most timely date of the contract. 500 000 000 HUF and 100 000 000 HUF / kare. Rancid epithel-engineer assurance. In the case of point IV.2.6, 2honap = 60 days.
AK discourages ATs that in the case of Section 98.3 (3). Based advertisements in the quintessential quiz. May be used for which AK is the lower oneOegziti:
AK reserves the right to revoke Section 98.- (3). . The additional purchaser (s) may refer to the design and epithetic tasks related to the design of the site of the present buyer and to the ancillary product of the intended use of the present buyer, and may be subject to the tasks and tasks of the present buyer. The new epithets will be releasedThe tasks assigned to the new technical content are in accordance with the requirements set out in the present standard. United, according to the terms of this contract law
FAKSZ: dr. Pete Judit OO353.
The details are kept in the next koezb.dok
Internet address (URL): http://www.nif.hu
Directive: Classical Directive (2014/24/EU)

Documents

Tender Notice
Login to view

Similar tenders

Tender Country TOT Ref. No. Bid deadline
Csongrad Sgt. Road Development, Bicycle Path Construction Hungary 152587320 03 Dec 2026
Complex Renovation of Municipal Apartments / 2026. Hungary 152582982 23 Nov 2026
Execution - Rozsa U. Renovation 2026 Hungary 152551822 17 Dec 2026
Building a Solar System in 2 Parts Hungary 152540975 14 Dec 2026
56-56 Accessibility of Tram Line Platforms Hungary 152540740 01 Dec 2026

Hungary Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Road construction works was 20 Sep 2017. Bidding is closed.

This tender has been issued by NIF ZRT. in Hungary.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45233120 - Road construction works, 45100000 - Site preparation work, 45110000 - Building demolition and wrecking work and earthmoving work, 45111000 - Demolition, site preparation and clearance work, 45112700 - Landscaping work, 45221100 - Construction work for bridges, 45221110 - Bridge construction work, 45221111 - Road bridge construction work, 45223700 - Service area construction work, 45223710 - Motorway service area construction work, 45231220 - Construction work for gas pipelines, 45231300 - Construction work for water and sewage pipelines, 45231400 - Construction work for electricity power lines, 45231600 - Construction work for communication lines, 45232450 - Drainage construction works, 45233000 - Construction, foundation and surface works for highways, roads, 45233100 - Construction work for highways, roads.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 15644901. The purchaser document reference is 318606-2017.

See the Similar Tenders section on this page or browse other tenders from Hungary.

This tender falls under Construction and Real Estate in Hungary. Suppliers in these sectors can track similar Hungary tenders using CPV-based alerts.