Expired Tender Hungary ICB TOT Ref. 13490271

Contract notice: Road construction works Tender in Hungary - 13490271

Tender notice from Hungary, published on 24 May 2017.

Exeutive Summary

The NIF ZRT. has issued a Tender notice for the procurement of a Contract notice: Road construction works in the Hungary. This Tender notice was published on 24 May 2017 and is scheduled to close on 27 Jun 2017, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 13490271, while the tender notice number is 195271-2017 and Register on the platform.

Key facts

Summary
Contract notice: Road construction works
TOT Ref. No.
13490271
Document Ref. No.
195271-2017
Country
Hungary
Notice type
Tender
Competition
ICB
Publication date
24 May 2017
Bid deadline
27 Jun 2017
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Road construction works
Description: Contract notice: Road construction works
Authority Type: Body governed by public law
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45233120, 45233120, 45100000, 45110000, 45111000, 45112700, 45221100, 45221110, 45221111, 45223700, 45223710, 45231220, 45231300, 45231400, 45231600, 45232450, 45233000, 45233100, 45233120, 45100000, 45110000, 45111000, 45112700, 45221100, 45221110, 45221111, 45223700, 45223710, 45231220, 45231300, 45231400, 45231600, 45232450, 45233000, 45233100
CPV Description: Road construction works.
Site preparation work.
Building demolition and wrecking work and earthmoving work.
Demolition, site preparation and clearance work.
Landscaping work.
Construction work for bridges.
Bridge construction work.
Road bridge construction work.
Service area construction work.
Motorway service area construction work.
Construction work for gas pipelines.
Construction work for waterand sewage pipelines.
Construction work for electricity power lines.
Construction work for communication lines.
Drainage construction works.
Construction, foundation and surface works for highways, roads.
Construction work for highways, roads.
Vallalkozasi szerződes M8 autout Koermend-Rabafuezes orszaghatar koezoetti szakasz 2x1 savos epitesi munkaira.
Reference Number : PST kod: A008.03
VallalkoZasi authoring M8 autout Koermend-Rabafuezes country-country coexistence section for 2x1 epic work.
NUTS Code: HU222
Main Site: Main site: Hungary, Vas County, Koermend, Magyarnadalja, Kemestartodfa, Csakanydoroszlo, Gasztony, Ratot, Vasszentmihaly .
M8 autout Koermend-Rabafuezes countrywide experimental section 2X1 acidic epithel on 161 200---180 650 km of whiskers in the koezoett.
Length of the interruption: 19 450 m.
Coronet: 18, 0 m.
Cross-sectional design:
- traffic acid width: 3, 75m,
- turnover: 2x1,
- traffic Offspring: in the case of pre-stretched sections trawl line, no preamble for double trawls (0.50 m), - - safety margin on the left: 0.50m,
- safetyAnd all its width on the right: 0.25m,
- main coffin coat of arms: 8.25m,
Csopopontok:
3 cubic level knotpoints:
- Koermend east (86th century) csopopont,
- Koermend west (8707 j. Uti) csopopont,
- Only Csodop-cs of Csongr-d county.
Fabric beds:
23 pieces of artwork, of which 15 are felueljaro and 8 are lowered, which can also be found in one piece of iron (maximum free arrow 56, 29 m).
Gasztonyi ketoldali, simple resting place in the 175 000 km of mountaineering.
Noise walls:
167 730 168 120 km no. Right at 390m in length.
167 290-168 120 km no. On the left side at 830m.
Other industrial horses (design phase 1):
86. (52 420 53 500 km) • Length: 1 080 m
Crown width: 12.00m
86. s. The capital of 53, 904 km in the mountaineer koer
86. s.
5222 km in the mountaineous village of Szemcse-Megyefő.
Full width: 12, 13m
8722 oesszekoető ut Correction (2 360 2 470 km km dog)
Length: 110m
Crown breeze: 11, 00m
8707 (0 660 1 455 km) • Length: 795 m • Crown width: 11 m • Other industrial huts (design phase 2):
8708 j(0 210.46 0 699.70 km) • Length: 489.24 m • Crown width: 11.00m
87106 (0 116 0 373.49 km no.
Length: 257.49m
Corona width: 9, 50m
7452 Correction of the oesszekető ut cornea (2 158 2 833, 70 km koezoett)
Length: 675, 7m
Crown breeze: 11, 00m.
Other Asian Experiments (3rd Design Phase):
The main tasks of the Executors are:
Purchaser of epites, concessionists, addicts
Extraction of synergistic artisans:
Dissection, epitese, and putting into the water of the cryogenic wires.
Disruption, epitese of small, heavy, high-tension electric wires, Standardization, elimination of auxiliary and tertiary control,
Disruption and epitese of the Koezep and Nagykoezepnyomasu grenades
Uezemi hirkoezle leteszese (Traffic S-mlalo System, Meteorological System, Video Surgery System)
Disruption, epithel of the upper rays of Vasuti
Others:
The end of the utopian Or twisted agricultural fields for the production of parboiled foams, service routes
Existing epitaphs,
Pedestrian and wheelchairs,
Approved,
Waterborne tasks: the formation of rainwater systems, medecorracing.
The present invention is a detailed study and the more elaborate technical brochures are available in the Koezbeszerzesi Documents. A) Kizaro's Reasons:
You can not be a time-consuming, al-workO is not eligible to be a valid economic operator, Section 62 (1) - (2) excludes the exclusion of all causes. All rights reserved. Section 74 (1) (A) and (b) of Regulation (EC) No 1782/2003.
The non-existent reason (s) and, where appropriate, a legally validated organization shall, Proof of the existence of a co-procurement document (hereinafter referred to as EEKD) as follows: Article 67 (1) If applicable, a suitably validated organization shall be tested in a timely manner with the statement in the EEKD for the non-payment of exclusionary grounds, 15. (X. 30.) Gov. Decree (hereafter: Cr.) II. . In the case of a co-operative time, the co-operative timers must each submit a formatting.
EEKD is governed by -- 4 and 6-7 of the Cr. - We must summon the attention of the time-watchers to the section 64 and - 4 (3) of the Act.
In the case of subprojects that do not take the rightAs well as the Kbt. Section 67 (4) The provider of the base must be required to declare that he or she does not apply for the Kb. Article 62 (1) to (2) • The Kbt. Section 69 (4) - (6) The idolater of the idolaters is based on verses 8, 10, 12-16. - Confirming that there is no exclusionary reason for the cause of the exclusion.
In-progress case filingIn this case, the prospective applicant is required to attach to the cegbirosag the application form and the certificate of the cegbirosag altal (the statement of the content of the negative content is also exemplified).
The statements made in the justification for the exclusion of the excuses must be filed no later than one day. Activity train trainKozo is aptly prettiest [Kbt. Section 65 (1) (c)]:
Verification mod:
The provisional acknowledgment of the EEKD can be found in the Kbt. Section 67 (1) to (3) and Section 1 para. (1) of the Cr. Section 2 (5) According to EEKD IV. Including detailed data. The submission of documents specified in the Annex shall not be subject to the prior written consent of the provisionalPlease contact us. Section 69 para. (4).
NY.1.)
Provider of the registration in the register as referred to in the Kbt. (11) of Article 69. The names of the candidates in the register are as follows: In the registers of Article 69 (11), the free verification of the relevant data or artefacts is not in the form of an extract from the register, Vantartast leader or a certified copy of the document in question in a simple copy. Section 65 para. (7), (9) and 69 (11). As well as the local Chamber of Commerce of Hungary-Or in the case of non-registered economic operators in the country of the resident country (in the case of a sovereign country), or in the country of residency, with no rights, no organizational or chamber membership (Kbt. Article 65 (1) (c) and 322/2015. (X.30) Korm. Section 21 (1) of the Regulation).
Verification Mod:
The provisional confirmation of the EEKD can be found in the Kbt. Section 67 (1) to (3) and Section 1 para. (1) of the Cr. Section 2 (5) According to EEKD IV. Including detailed data. The submission of the documents specified in the foregoing is not exclusive to the express consent of the former sponsor of the preliminary certification-The Kbt. Section 69 (4) of the basic Regulation.
P.1) Section 65 (1) (A) and Article 19 para. (1). (In the case of a case-by-case basis), attach the date on which the timely summons is sent, with the statement of the present supervisor, Mmal, attol fueggiano, that When the timer when I rushed to letter or. When it started to work if these data were available to you:
- give me a penzforgalmi szamlaszam,
- had it been over fifteen days in a row row allitas in the 24 months before the rallying queue.
"Sorba allitas" kitetel under the LXV 2009. P.2) Pursuant to Article 65 (2) of the Kbt.Section (1) (A) and Article 19 para. (1). (C) of the basic Regulation shall be attached to the total net and during the same period of the contractual sale of the consignment of a consignee (a member of the cooperative) to the date of the last 3 seizure days prior to the day, P.3) Contract covered by the Government Procurement Agreement (GPA) Yes. Section 65 (1) (A) and Article 19 para. (1). (B) of the law on the basis of which the person (s) or predecessor shall be attached by the person (s) of his / her legal predecessor (s)If the attachment of the host country is sufficient) (if the right of the country of the resident is established). If the Adoption of a garden is presented to the web site of the ceginformation service, the data of the account will be checked by the Advisor, and the submission of the web site of the ceginformation service will be inadmissible.
If the Issuer does not have a document under P.3During the full period of time, because it started to be artificial after the start of the period, and the ability to justify the sale of the co-owned real estate can be justified. The Aid Provider is able to control the Penny Person and the Gainfulness of the Beneficiary if, during the course of his artificial life, the co-soldier (Koezutepites) Sarmaso AFA-In the case of the first payment, the amount of HUF 20 000 000 000 and the amount of HUF 10 000 000 000 for the second installment shall be deducted from the first amount.
The Trustee shall pay attention to Section 19 (3) BC. If a time-worker satisfies the requirements of suitable body or body capacity, all of the excluded organizations or persons shall be formally(EEKD) should be submitted. Organizations or persons who have the capacity to do so will only declare the relevant provisions in the applicable terms, which the time-consumer may require to justify their suitability. In case of a check-in time, the driver must be asked to submit a form.
The supervisor will raise the attention to the Kbt. Section 65 (7)- (8) and - 67 (3). Experiment: 1988. I TV. According to Section 32 (1) of the Act. Article 69 para. (11) is irrelevant. Min and point: translated, in 2.1-2.3. Min. E. Perspective: straight gold, figure 2.5. Min. E. Perspective: score. Points also have upper limits: 0-10. Specifications: Further information in the tender dossier. 57 (2)T In the case of an electronic file of the same type, in the case of 1 paper-based plated baggage and 1 piece of paper in the same print format, the item specified in point I.3 must be stamped on a postmark or postmarked To submit it to the deadline of the time limit (in case of an individual lead: h-cs-9-15, p 9-12, the deadline for the deadline is up to the deadline of the deadline.)
The time schedule must include:
- Section 66 para. Where appropriate, in the name of the body that is eligible to receive a copy of the certificate in the name of the competent body, - if it is entitled to the observer and the probationary witnessIncluding a test certificate, a certificate of legal validity and a certificate of legal validity. ----------------------------------------------------------------------- According to --6. --6. According to arrow. (With negative content),
- arrow. Section 65 (7) of the Kbt. Based, (with neutral contentAs well as the relevant technical and technical specifications, - - Kbt. 134 - 5, para. (S),
- a full-time schedule containing the contents of the document. According to the requirements of III.1.1) -3)(3) of the Code of Criminal Procedure. The documents submitted in the time-frame are listed in the Kbt. 47.- (2) para. It can be based on simple masonry. 71.- (6) para. In the case of the Hianypotlass the participant enters into the non-registered economic operator in the case of an AK limiting stakeholder, providing the Hianypotlas opportunity.
AK applies the Kbt.75.- (2) (e).
AK does not allow the organization of the contractor to complete the contract (project portfolio) with respect to the AT or the Oenallo ATs.
Providers of the timescales Resource 1: 38 000 000 HUF Res. 2: 18 000 000 HUF. This can be accomplished by using the timer according to the timer of the Ajanlatkerő 10300002-20609931-49020322. Banker's rangeWith the same guarantee as the guarantee of the custodian of the pennies and v assurance of the custodian of the custody of the custodian, and the voucher of the custodian of the custodian. The timescales of the timescales have the same time limit as the timescale. In the case of atutalas, the taxpayer must be paid on the atutraltitle. The ATT is to be accompanied by a valid certificate.
AK is the most accurate at the time of the contract. 500 000 000 HUF / year and 100 000 000 HUF / kare. Rancid epithel-engineer assurance. - point IV.2.6) 2 months = 60 days. Section 53 (6) of the Constitution shall readily be read out.
FAKSZ: dr. Pete Judit OO353, dr. Papp Petr00559.
The quotations are included in the further documents of the trial
Internet address (URL): http://www.nif.hu
Directive: Classical Directive (2014/24/EU)

Documents

Tender Notice
Login to view

Similar tenders

Tender Country TOT Ref. No. Bid deadline
Csongrad Sgt. Road Development, Bicycle Path Construction Hungary 152587320 03 Dec 2026
Complex Renovation of Municipal Apartments / 2026. Hungary 152582982 23 Nov 2026
Execution - Rozsa U. Renovation 2026 Hungary 152551822 17 Dec 2026
Building a Solar System in 2 Parts Hungary 152540975 14 Dec 2026
56-56 Accessibility of Tram Line Platforms Hungary 152540740 01 Dec 2026

Hungary Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Road construction works was 27 Jun 2017. Bidding is closed.

This tender has been issued by NIF ZRT. in Hungary.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45233120 - Road construction works, 45100000 - Site preparation work, 45110000 - Building demolition and wrecking work and earthmoving work, 45111000 - Demolition, site preparation and clearance work, 45112700 - Landscaping work, 45221100 - Construction work for bridges, 45221110 - Bridge construction work, 45221111 - Road bridge construction work, 45223700 - Service area construction work, 45223710 - Motorway service area construction work, 45231220 - Construction work for gas pipelines, 45231300 - Construction work for water and sewage pipelines, 45231400 - Construction work for electricity power lines, 45231600 - Construction work for communication lines, 45232450 - Drainage construction works, 45233000 - Construction, foundation and surface works for highways, roads, 45233100 - Construction work for highways, roads.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 13490271. The purchaser document reference is 195271-2017.

See the Similar Tenders section on this page or browse other tenders from Hungary.

This tender falls under Construction and Real Estate in Hungary. Suppliers in these sectors can track similar Hungary tenders using CPV-based alerts.