Contract notice: Road construction works Tender - 22583178
Tender notice from Bulgaria, published on 19 Apr 2018.
Executive Summary
The ?????? ???????? has issued a Tender notice for the procurement of a Contract notice: Road construction works in the Bulgaria. This Tender notice was published on 19 Apr 2018 and is scheduled to close on 28 May 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 22583178, while the tender notice number is 168373-2018 and Register on the platform.
Object of the contract Road construction works Description: Contract notice: Road construction works Authority Type: Regional or local authority Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45233120, 45233120, 45233120 CPV Description: Road construction works - Selection of contractor for construction and assembly works under the project "Reconstruction and rehabilitation of municipal road SFO 1370 / I-8 / Kostenets - Kostenets - summer. Kostenets - a stretch from km 0 000 to km 9 000 In the scope of this contract award, in order to efficiently organize performance and achieve quality results, the following three sub-projects are includeda: Main Site: Municipal road SFO 1370 / I-8 / Kostenets - Kostenets - summer. Kostenets - a stretch from km 0 000 to km 9 000. An assignment of the Municipality of Kostenets has produced a technical project defining the parameters of the assigned performance. The initial and final kilometer of the site as well as the kilometry of the facilities and accessories on the road is done project axis. Total track length by resultsthe optimization of the road axis is 8 989 m, of which: in straight - 6 584 m, in curve - 2 405 m. The road class is fourth at design speed - 40 km / h, 50 km / h and 90 km The area is divided into homogeneous sections as follows: 1) Settlement Kostenets - from km 0 000 to km 1 400 and L = 1 400 m. For design speed - Vpr. = 50 km / h; 2) Open road - from km 1, 400 to km 4, 900 and L = 3, 500 meters.speed - Ex. = 90 km / h; 3) Settlement of the village of Kostenets - from km 4 900 to km 7 720 and L = 2 820 m. For design speed - Vpr. = 50 km / h; 4) Open road - from km 7 720 to km 8 989 and L = 1 269 m. For design speed - Ex. = 60 km / h. For the entire stretch the levels are solved with straight and parabola. The accepted homogeneous segments of the situational solution are also complied with in the level decision: 1) Settlement dKostenets - from km 0 000 to km 1 400 and L = 1 400 m. For design speed - Vpr. = 50 km / h; 2) Open road - from km 1 400 to km 4 900 and L = 3 500 m. For design speed - Vp. = 90 km / h. Village of Kostenets - from km 4 900 to km 7 720 and L = 2 820 m. For project speed - Vp. = 50 km / h; 3) Open road - from km 7 720 to km 8 989 and L = 1 269 m. For design speed - Vpr. = 60 km / h Maxrequired slope 10.42% per km 8 384. The design dimensions were adopted to meet the currently active NRPs and the main purpose was to be closest to the existing gauge within the allowable tolerances. They are divided into sections with a minimum length of 200 m. Main gauge: 2 x 3.25 m strips and banquettes in the majority of 1.25 m. In the horizontal curves there are extensions which-are retained. In the settlements - Kostenets, Kostenets and Kostenets villas are accepted latitudes that correspond to the current regulation and sidewalks with slabs and asphalt pavement with the existing latitudes. As a most suitable for the wear layer, a dense asphalt concrete type "A" has been adopted The following structure is dimensioned: 4 cm thick asphalt concrete E = 1 200 МРа, 4 cm non-asphalted asphaltBinder E = 1 000 MPa, 8 cm asph. base mixture (bitumen, stone) E = 800 MPa, 35 cm. material with selected grain size (0-63) for base E = 350MPa, 15cm antifreeze layer stone (0-75). Total: 66 cm. Emergency sites and discharges to the road as well as the branches of the intersections are asphalted with a dense asphalt concrete type "A" - 4 cm. For the discharges which are currently without asphalt, as well as for the existing emergency sites, the following layers are envisaged: - 4 cm thick asphalt concrete E = 1 200 МРа, - - 4 cm non-reinforced asphalt concrete binder Е = 1 000 МРа, - 35 см нефрационна ск. base material E = 350 MPa It is envisaged to remove the existing 15 cm thick humus layer from the level of the existing pavement and cleaning from vegetation Up to reaching the design level of bthe questionnaires are laid on two-layer stone materials - for the lower layer: non-fracture rock materials for a lower layer of the banquet of 15 cm and rock material with a selected grain size for the top layer of banquet In the reconstruction areas, completely new banquets are carried out. replacement of existing concrete curbs with new ones in settlements The participant must have a valid register(registered) in the Central Professional Register of Builders, maintained by the Chamber of Builder in the Republic of Bulgaria, and for foreign persons - in analogous register according to their national legislation and under the conditions of mutual recognition, for execution of constructions from II (second) group III (third) category, according to art. 5, para. 6, item 2.3.1. and 2.3.3. of the Rules for the Entry Orderand keeping the central professional register of the builder, in conjunction with Art. 137, para. 1, item 3, letter "a" and letter "g" of the Territory Arrangement. For compliance with the requirement and on the grounds of Art. 9, para. 6 of the PIRCARP, the assignor will accept a participant who is registered for second group and category constructions higher than third. When submitting his tender, the participant declares compliance with this Criterionthe selection criteria and the minimum requirements for the exercise of a professional activity by filling in the required information in Part IV "Selection Criteria", Section A "Fitness", field 1, respectively. point 1 (depending on the form in which EEDOP is submitted) to the Single European Procurement Document, (1) the registration document (name of the document, number of the entry of the document in the relevant register, validity of the control coupon, integral part of the registration certificate or other equivalent document, group and category (s) (s), (2) a professional or commercial register (name of the professional or commercial register;the name of the body or service that made the registration and issued the document for the exercise of professional activity.) On the grounds and under the terms of Art. 67, para. 5 and para. 6 of the PPA, in the course of the procedure or prior to the conclusion of the contract for awarding the public procurement, the following document shall be presented for proving compliance with the selection criterion:o The authenticity of the information declared in EEDOP is proved, namely: a certified copy of a valid certificate for registration in the CPSC, accompanied by a valid coupon under Art. 23, para. (1) of the PIRICPPP or a valid equivalent document certifying the right of the person concerned (in accordance with its national legislation - with non-residents) to fulfill the subject of the order in the territory of the Republic of Bulgariaaria 1. When submitting its tender, the participant declares compliance with the minimum economic and financial condition set out in point 1 below only by filling out the required information in Part IV "Selection Criteria", Section B "Economic and Financial Condition", Field Three, respectively. item 2a (depending on the form in which EEDOP is submitted) of the EEDOP, which it presents, includingdata on the turnover of the participant in the scope covered by the procurement according to the definition of "similarity" 2. When submitting its tender, the participant declares compliance with the second of the minimum requirements only by filling in the required information in Part IV "Criteria Section B "Economic and Financial Condition", field seventh, respectively item 5 (depending on the(1) the insurance policy / equivalent document - the type, number and date of issue; (2) the insured person; (3) the professional (4) term / validity of the insurance, (5) total limit of liability and currency. On the grounds and under the terms of Art. 67, para. 5 and-para. 6 of the PPL, the following documents shall be submitted in the course of the procedure or prior to the conclusion of the contract for awarding the performance of the procurement to demonstrate compliance with the selection criterion and the minimum requirements under items 1 and 2 below: (1) Copies of the annual financial statements for the last 3 (three)-completed financial years or parts thereof, when their publication is required by the law of the country where the participant is established, and (2) References to the turnover of completed works / supplies in the scope covered by the contract (with subject Scope defined in the following field - "Required Minimum Level"); (3) Copy of Insurance Policy for Profession InsuranceThe contracting authority shall remove from participation in the procedure: - Participants for whom the circumstances under Article 54 (1) of the TDA (or an equivalent document) with the required coverage, paragraph 1, items 1-7 and under Article 55, paragraph 1, items 1-5 of the Public Procurement Act, which occurred before or during the procedure As regards the conditions of Article 55, paragraph 1, 2 ofPPL should not be deprived of the right to pursue a particular profession or activity in the field of construction under the law of the state in which the act was committed, - Participant - a combination of physical and / or legal. persons, where a member of the grouping has any of the circumstances for removal under Art. 54, para. 1, item 1-7 and / or under Art. 55, para. 1, items 1-5 of the Public Procurement Act, - Participantwhich has indicated that it will use subcontractors and / or the capacity of third parties to prove the compliance with the selection criteria in the execution of the order and for them there is any of the circumstances for removal under Art. 54, para. 1, item 1-7 and / or under Art. 55, para. 1, item 1-5 of the Public Procurement Act When submitting the tender for participation, the participant declares the lack of the grounds for elimination under Art. 54, para. 1, -items 1-7 and / or under Art. 55, para. 1, items 1-5 of the Public Procurement Act by presenting the EEDOP. Where a participant is a grouping of natural and / or legal entities, a separate EEDOP shall be submitted to each member of the consortium when submitting the bid. Where a participant has indicated that it will use the capacity of third parties to demonstrate compliance with the selection criteria and / or that it will use subcontractorsThe tender for participation for each of these persons shall be submitted to a separate EEDOP. Participant for whom there are circumstances under Art. 54, para. 1, item 1-7 and / or under Art. 55, para. 1, pp. 1-5 of the Public Procurement Act, has the right to provide evidence that he has taken measures to ensure his / her reliability. The participant fills in Part III, Section D of EEDOP, given the fact that he /the operator has specified specific national grounds for exclusion from participation in the procedure, with the view that in this Section of EEDOP, the participant must declare: - - the lack of the grounds under Art. 194-208, Art. 213a-217, Art. 219-252 and Art. 254a-255a, and Art. 256-260 of the Criminal Code, - is there a circumstance of connectivity within the meaning of-the existence of such a connection is a ground for removal, on the grounds of Art. 107, item 4, in connection with Art. 101, para. 11 of the Public Procurement Act, - whether it is registered in a jurisdiction with a preferential tax regime. In case the participant is registered in preferential tax jurisdiction, but the exceptions under Art. 4 of the ZUFODRUDPARKLTDS, the specific exception is given, - are there anythe circumstances under Art. 101, para. 9 of the Public Procurement Act, - are the circumstances under Art. 101, para. 10 of the Public Procurement Act, - are there any circumstances under Art. 69 of the Law on Counteracting Corruption and for Removal of the Acquired Property. Internet address (URL): www.kostenetz.com Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Road construction works was 28 May 2018. Bidding is closed.
This tender has been issued by ?????? ???????? in Bulgaria.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45233120 - Road construction works.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 22583178. The purchaser document reference is 168373-2018.
This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.