Expired Tender Romania ICB TOT Ref. 36348942

Contract notice: Road bridge construction work Tender - 36348942

Tender notice from Romania, published on 16 Sep 2019.

Executive Summary

The COMPANIA NA?IONAL? DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A. has issued a Tender notice for the procurement of a Contract notice: Road bridge construction work in the Romania. This Tender notice was published on 16 Sep 2019 and is scheduled to close on 18 Nov 2019, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 36348942, while the tender notice number is 432681-2019 and Register on the platform.

Key facts

Summary
Contract notice: Road bridge construction work
TOT Ref. No.
36348942
Document Ref. No.
432681-2019
Country
Romania
Notice type
Tender
Competition
ICB
Publication date
16 Sep 2019
Bid deadline
18 Nov 2019
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Road bridge construction work
Description: Contract notice: Road bridge construction work
Authority Type: Body governed by public law
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45221111, 45221111, 45221121, 71322300, 45221111, 45221121, 71322300
CPV Description: Road bridge construction work.
Road viaduct construction work.
Bridge-design services.
Carrying out the bridge rehabilitation work on the Borcea branch, located on the A2 Motorway, at km 149 680 (lot 1) and carrying out the bridge rehabilitation works of [ ...] details on www.e-licitatie.ro
Reference Number: 16054368/2019 / 2186-2187 / S / 10
Ob ctr af lot 1 il repr exe work of rehab of the bridge over the arm Borcea, Sitpe Auto A2, at km 149 680, in conf with prev contr working. The bridge is wide near Fetești place on the A2 car (approx. Km 149 680) which provides connection between the Black Sea and Central Europe through the Borcea arm of the Danube river. The length of the bridge path is 968 m and the width of the bridge path is 34.40 m.in conf with prev contr of work. The bridge is located near the local Cernavoda, on the A2 car (at km 157 600), the Fetești-Cernavoda sect, which provides connection between the Black Sea and Central Europe, crossing the Danube river. The length of the bridge path is 1 596 m, and the width of the bridge path is 34, 40 m. Antr will carry out, where appropriate, DDE related PT existing as defined in the DTAC in the fct of necessity and site.on the ground (with the view that work will be carried out on the rehabilitation of an existing bridge which is currently under traffic) [...] details on www.e-licitatie.ro
Main Site: County. Ialomița and Bucuresti
Ob ctr il repr realz real thing of Pod over the arm Borcea, site on Auto A2, at km 149 680, for a fluid traffic and a qualitative state of the roads, on the directions of walking of Auto A2. In cnf with prev ctru, resp of GD no. 1/2018, event mode that may intervene in the matter for which it refers to the following, without being limited to these: Mod to the parties; Change den and / or shock organ form, change that does not attract the creation of a new person; Mod of cantit for a work art from Ctr (although, as such sch will not necessarily constitute a Modif, as follows: Mod of quality and other characters of a work art; Modof quotas, pose and / or size of a / some Works articles; Mode generated by the omission of some works / art work; Mode that results from adapting PT to the reality of the field, including ground exchange teh point / met ex; Mod has two exp teh; Type of request for own utility networks; The way of law or of the norms techno / norms / stand, which will be realized according to the rules of the CG of Ctr; Mode of work that may appear aftercovered by road system and / or after demolition of other components needed to be replaced, based on an adequate / real event; Mode generated by environmental author requirements; Type of agreement, convention, state / author agreement with other states; This way we include new subtractions and / or substitutes of subtractions that will be realized according to the corresponding clause in the CG of Ctr; Prel Dur exe based on the match against Clz 35 [Prel Dur exe] from the CG of the Ctr, without prejudice to the Benefits of applying the Enterprise penalty and / or sanction provided for in the Ctr; The way that comes from the ground is provided by various institutions / autort / entities that have attribute in connection with the ob ob of investment (eg: Minister, JASPERS, Aut / Inst central and / or local, Verif attested, control org, etc.). ). The way will be achieved last sem, in the cnf with prev ctr, only in the condition that they do not represent subs mode in the sense provided by art. 221 para. (7) of Lg no. 98/2016. Prel Dur de Ex will be realized in the cnf with prev clz 35 [Prel Dur exe] from CG of Ctr. More info can be found in Ctr
I. For each batch of Of unique / Of lasociat / Subcontr / Tertulsustinatortrebuiesademonstrezeca does not comply with the provisions of art. 164 of Law no. 98 / 2016. In this regard, the Single Bidder / The Associated Bidder /Subcontractor / Third party supporter of the DUAE Completion - Part III "Reasons for exclusion" - Section A "Reasons regarding the convictions". Also, for each batch, the Bidder is ranked first, after the application of the award criterion, prior to the award of the contract, the shipment, at the request of the Contracting Authority, the following documents that prove / confirm the classificationin the situations provided for in art. 164 of a master, both for the Single Bidder / Associate Bidder and the Subcontractor / Third Party Holders, declared in the offer: - the judicial record of the economic operator and the members of the management body, of the supervisory management of the respective economic operator, or of those who have the power of representation, in the decision or controlas it results from the certificate issued by the ONRC / the constitutive act; - other edifying documents, after the case. II. for each batch of unique / Of assoc / Subctr / Tertulsustinatortrebuiesademonstrezeca does not comply with the provisions of art. 165 of Law no. 98 / 2016. In this case, of single / of assoc / Subctr / Third party supporter of the DUAE - Part III "Reasons for exclusion" - Section B "Reasonit is related to the payment of taxes or contributions to social insurance ". Also, for each batch of part of the class, the first of all the application of the writ, prior to the award of the contract, the ship, at the request of the Contracting Authority, the following documents that prove / confirm the evidence in the cases submitted to the tender., as support for the Subcontractor / Third party, you are declared in the offer: A.People, the juridical jurist and the need to present: - certificate of fiscal attestation regarding the fulfillment of the obligations of payment of taxes, taxes or contributions to the general consolidated budget, from which the salary of the remaining members to the moment. B.PersoanelejuridicestrainevorprezentaoricedocumenteedificatoareelReceived by the authorized institutions of the country of origin (certificates of fiscal attestation, judicial cases, equivalent documents, etc.) through which the facts are fulfilled and the obligations of payment of taxes, taxes or contributions to the consolidated general budget have been fulfilled, according to the country's legal tender / country / Subcontractor /Third party supporters or the country in which the Single Bidder / Associate Bidder / Subcontractor / Third Party Holder is established. From the edifying documents presented and the requirements of the remaining salaries at the time of presentation to them. [...] III. For each batch separately Of unique / Of assoc / Subctr / Tertulsustinatortrebuiesademonstrezeca does not comply with the provisions of art. 167 of Law no. 98 / 2016. Inacestsens, Single tenderer / Associate tenderer / Subcontractor / Third party supporter of the DUAE - Part III "Reasons for exclusion" - Section C "Reasons related to insolvency, conflicts of interest or professional interests". Also, for each batch, in part, of the unique / of the associate / Subcontr / TertulsustinatortrebuiesrepresentsForm C "Declaration regarding the classification in the provisions of article 60 paragraph (1)of Law 98/2016 ", according to the model presented in the Forms section. Form C will be compulsorily sent with DUAE, through SEAP siva signed with the extended electronic signature, based on a qualified certificate, issued by a certification service provider accredited under the law. Note: In the sense of the provisions of article 60, paragraph (1) letter d) of Law 98/2016, by the action or the significant partnership is understood the person who exercises the right of reference to the shares which, cumulatively, represent about 10% of the capital ... details on www.e-licitatie.ro
Lots: 1, 2 Annual general turnover the financial years for 2016, 2017 and 2018 should have been at least: 22.000, 000 Lei for Lot 1 19, 000, 000 Lei for Lot 2 Note 1: For each lot individually, if a group of economic operators submits a common offer, the requirement is demonstrated by taking into account the resources of all group members. In this situation, the associated bidder will also complete DUAE - Part IV "Selection criteria" - Section B "Economic and financial capacity". Of coursethe emenia, together with the DUAE and the offer, will be charged in SEAP and the Association Agreement, signed with the extended electronic signature, based on a qualified certificate, issued by a certification service provider accredited under the law. Note 2: a) For the transformation into Lei, the average course for 2016 will be used 1 Euro = 4.4908 Lei, 2017 1 Euro = 4, 5681 and 2018 - 1 Euro = 4.6535 Lei.b) For currencies other than Euro, it is first converted to Euro, using the average exchange rate for 2016, 2017 and 2018 published on the website http://ec.europa.eu/budget/contracts_grants/info_contracts/inforeuro/ index_en.cfm. For the conversion of Euro into Lei, the indications from point a will be followed.by supporting a third party. In this respect, the provisions of art. 182 of Law no. 98/2016 and of art. 48 of the GD no. 395/2016
1. The present public procurement procedure is initiated under the following condition: The conclusion of the public procurement contract is conditioned by obtaining / approving the financing of works from funds from the state budget and / or funds.non-reimbursable fees, the signing of the contract being possible only if the provisions regarding the commitment of the expenses from the budgets that come under the legislation on public finances are respected. In case, for whatever reasons, obtaining / approving the financing of works from funds from the state budget and / or non-reimbursable European funds is not realized, The Contracting Authority shall apply the provisions of art. 212 paragraph (1) lit. c) the second sentence of Law 98/2016, being impossible to conclude the public procurement contract. The Contracting Authority estimates that it will obtain the necessary financing to sign the contract in the second semester of the year 2019.
2. The terms specified in the Contract regarding payments are justified by the complexity of the infra projectroad structure (projects of major interest), as well as the financial circuit of the funds involving several state institutions.
3. For each lot, the duration of the contract is 84 months and includes: 24 months the period of execution of the works and 60 months the period of guarantee of the works. The duration of the works contract may vary depending on the warranty period offeredattached by the economic operator designated the winner.
4. In order to complete the DUAE, the bidders will use the editable form made available by the Contracting Authority in SEAP, in accordance with the model published by ANAP by the Notification dated 01.09.2016. Additional information in section IV.4.3).
5. The attribution documentation is attached in full in SEAP. The documents are signed electronicallyronic in accordance with the provisions of art. 22, paragraph (2) of GD 395/2016. To open these files use the TrustSigner application, available at https://www.alfasign.ro/download. The award documentation can also be downloaded from the website of the Contracting Authority eachizitii.cnadnr.ro.
6. The person considered to be injured by an act of the contracting authority may notify Consilul for the annulment of the act of the Contracting Authority, its obligation to issue an act or to take remedial measures, as well as for the recognition of the claimed right or the legitimate interest, within 10 days, according to the provisions of art. 8 paragraph (1) lit. a) of Law 101/2016. For the judicial settlement, the person who considers himself / herself injured can address himself / herselfthe competent court aunt, according to the provisions of art. 49 of Law 101/2016. To solve the challenge formulated under the conditions of art. 8 or art. 49 of Law 101/2016, under the sanction of its rejection, the person considered to be injured must first constitute a bail in the conditions provided in art. 61 index 1 of Law 101 / 2016.
Internet address (URL): www.cnadnr.ro

Documents

Tender Notice
Login to view

Similar tenders

Romania Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Road bridge construction work was 18 Nov 2019. Bidding is closed.

This tender has been issued by COMPANIA NA?IONAL? DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A. in Romania.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45221111 - Road bridge construction work, 45221121 - Road viaduct construction work, 71322300 - Bridge-design services.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 36348942. The purchaser document reference is 432681-2019.

See the Similar Tenders section on this page or browse other tenders from Romania.

This tender falls under Construction and Real Estate in Romania. Suppliers in these sectors can track similar Romania tenders using CPV-based alerts.