Contract notice: Repair and maintenance services Tender - 38707991
Tender notice from Hungary, published on 07 Dec 2019.
Executive Summary
The MÁV MAGYAR ÁLLAMVASUTAK ZÁRTKÖR?EN M?KÖD? RÉSZVÉNYTÁRSASÁG has issued a Tender notice for the procurement of a Contract notice: Repair and maintenance services of electrical machinery, apparatus and associated equipment in the Hungary. This Tender notice was published on 07 Dec 2019 and is scheduled to close on 10 Jan 2020, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 38707991, while the tender notice number is 580278-2019 and Register on the platform.
Key facts
Summary
Contract notice: Repair and maintenance services of electrical machinery, apparatus and associated equipment
Object of the contract Repair and maintenance services of electrical machinery, apparatus and associated equipment Description: Contract notice: Repair and maintenance services of electrical machinery, apparatus and associated equipment Authority Type: Utilities entity Contact Nature: Services Procedure: Negotiated procedure Document: Contract notice Regulation: European Union Award criteria: Lowest price CPV code: 50532000, 50532000, 50532000 CPV Description: 10 kV Networks, Rectifier Assembly Core Troubleshooting Reference Number: EKR001302172019 MAV Plc. Reporting of Errors on a Reporting Framework Contract Frameworkeben Main Site: Budapest and Szolnok Planned works: Maintenance data for the entire 36 months of the contract: - 17 10 kV switchgear, 74 10 / 0.4 kV transformer substations (of which 55) (cellular), as well as 1 10 kV low-voltage switchgear, cables and other peripherals for the entire 36-month i276 maintenance tasks during the duration of the contract. Quantity estimates for disruption during the entire 36 month period of the contract: - Fixed cable fault location (last 3 years, and the number of fixes for this period) ) 27 - Core error cable repair ( )Faults in the last 3 years, and the estimated amount of repair work done by contractors during this period) - coarse / coarse tension and / or coarse / low tTransformer disaster recovery (the last 3 years of failures, and the estimated amount of repaired by contractors during this period) 4 - on the co-voltage telemechanical equipment (data, signaling, processing, control, (Modem) equipment, cables, signal cables, non-alarmpower supply (non-intermittent power supply, etc.) power failure (last 3 years failure, and estimated quantity for repair during this period) 8 - power failure on power devices and during this period, he is trying to improveQuotes Quantity) 2 pieces Provision of replacement parts: Quantity according to customer's order on a case-by-case basis Cannot be an outsourcer, sub-contractor, and cannot be certified as an economic operator by the 2015 CXLIII. Section 62 (1) - (2) of the Criminal Code (hereinafter: Kbt.) under the exclusionary grounds of the Civil Code (subject to - 62 of the Civil Code)(3) to (5) of the Kbt. -- 63 (3) and 64) and meets the requirements for aptitude. The Kbt. Pursuant to - 74 (1), the bidder shall exclude from the procedure any candidate, subcontractor or duly certified organization that is subject to the exclusion criteria or whoro ok the procedure has been introduced. AK a Kbt. Article 74 para. (2) (a) reserves the right to exclude from the proceedings a candidate who does not have to provide a national banana [Kbt. - 2 (5)]. Verification Module: Preliminary Verification: Applying for a Recruitment Application Testing for Non-Exclusion and Suitabilityplot with respect to 321/2015. II. to submit a statement in the EEKD in accordance with Chapter 321/2015. In view of - 3 Kr. Kbt.67 (4) para. should also be stated. If the capacity of the other organization applying for the grant corresponds to the grant, the applicant applying for the file shall submit the capacity from the resourcing facility in accordance with Article 67 (1) Kbt. according tolatkozatot. The beginning of - 15 (2) of Government Decree 321/2015. Subsequent certification: Time power as per Section 69 (4) - (7) Kbt. Excluded reasons for resignation are excluded from the scope of application No 321/2015. (X. 30.) Korm. order. 8 (10) and (10) (gb) of the 2017 LIII. tv.3. - 38 (a) to (b) or (d) shall be the supplier-Accordingly, the Time Force must verify that the property present is not subject to - 62 (1) - (2) Kbt. Yes. Article 65 (7) must be accompanied by a document containing evidence of the testimony of the organization referred to in - 65 (8) Kbt.so that an organization can deal with representation in the ECT when it makes its electronic declarations. A 321/2015. (X. 30.) Korm. Article 15 (1) para. prevail. The detailed rules for declarations and justifications to be submitted in advance and ex-post justification of the exclusion reasons are set forth in Decree 321/2015. (X.30). 1 and 8-16 AD. And are based on these in the KD. 1) The chosen procedureLegal basis for the negotiation procedure for astipus: Unique Co-Procurement Law for Co-Purchasers of Co-op Services Szabalyokrol 307/2015. (X.27.) Cr. (c) subject to paragraph (2). 2) Requirements for registration in the ECR (424/2017. (XII.19.) Government Order). A bont a 424/2017. (XII.19) Kr. - 15 (2), information about which is given in (5)k. according to the applicants. 3) Bidding on the potential for ill health and awareness in the Kbt. 71 of the Insurance Act and does not apply the Kb. - 71 (6). Hypertension should be done in the EKR system. 4) The Kbt. Section 66 (1), as defined in the co-procuring documents, you should prepare your application for tinnitus and formal requirements accordingly. 5) Requirements for formal requirements are set forth in the Co-Procurement Documents. 6) The Kbt. Section 66 (3) does not allow a bidder to submit a proposal. 7) Documents to be submitted during the Koezb procedure are in the Kbt. - 47 (2) is based on law unless the law is broadly simpleI can get it smeared. 8) Declaration is required by Kbt. 66 (6) (a) to (b) of the sub-clauses. The full list of documents to be attached to the recruitment application is contained in the Co-Procurement Document. 9) In the case of an ongoing variation registration procedure, Act No. 321/2015. (X.30) Kr.13--a iranyado. 10) IV.2.6 in 2 months 60 days 11) Time limit for applyingthem to the 320/2015. He / she will continue the procedure with a check in process, so during the bidding phase the negotiators will have 60 days to complete the bidding trial. 12) The bidding force reminds candidates to apply for coezep-european time in relation to the procedure. 13) Requirements for Additional Informationmentum included. 14) In the present procedure the prevailing Hungarian law is the law. 15) FAKSZ name: dr. Krisztian Kovacs, registered on 534 16) (X.30.), Pursuant to Section 30 (4) of the Government Order (X.30.), Invites candidates for secondment to meet the minimum test requirements for M1 in the present procurement procedure; M2; M3 eligibility conditions are stricter ifqualified reviewers have a record of their kerueles test results, so qualified reviewers must also prove their ability to perform the contract. 17) Bidder plans to negotiate technical and contractual terms and conditions during the bidding phase. You don't want to discuss about co-ops: coetber, jordan, and other contract confirmation biztositekokrol. 18) Bidding does not apply Kb. Section 75 (2) (e). 19) The Contractor acknowledges that for the work covered by this framework contract (including) the minimum contract cost is $ 10, 000, 000 (Tizmillio HUF) / year and at least 2, 000, 000 Ft (Two Million HUF) liability insurance is an original exampleat 30 days from the date of the framework contract, the customer's file will be provided by Beluel. The liability insurance document must provide full coverage for the Customer, as the majority of the Customer, as the case may be, as well as any third party liability. The Undertaking shall have until the 10th day of each calendar quarter under itsFinding the Customer's Certificate of Proof of ijfiz body. Until such time as the liability insurance document and the proof of payment of the deposit have been issued, the disclosure fee may be refused. 20) Reason for exclusion: Contract performance is inevitably unlikely to result in liability or soldering. Applicants for resume opening time: 10.1.2020 12: 00 Internet address (URL): http://www.mav.hu
The bid deadline for Contract notice: Repair and maintenance services of electrical machinery, apparatus and associated equipment was 10 Jan 2020. Bidding is closed.
This tender has been issued by MÁV MAGYAR ÁLLAMVASUTAK ZÁRTKÖR?EN M?KÖD? RÉSZVÉNYTÁRSASÁG in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 50532000 - Repair and maintenance services of electrical machinery, apparatus and associated equipment.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 38707991. The purchaser document reference is 580278-2019.
Browse other tenders from Hungary or search by relevant keywords and CPV classification.
This tender falls under Defence and Security in Hungary. Suppliers in these sectors can track similar Hungary tenders using CPV-based alerts.