Object of the contractRepair and maintenance services of building installations
Description: Contract notice: Repair and maintenance services of building installations
Authority Type: Utilities entity
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: Lowest price
CPV code: 50700000, 50750000, 50700000, 50750000, 50740000
CPV Description: Repair and maintenance services of escalators
Post-warranty maintenance of elevators and escalators of metro stations of the first and second metro diagrams of Sofia metro, incl. supply and installation of spare parts under the Public Service Contract includes subscription-technical maintenance in out of warranty period of 29 ORONA elevators and 26 SJEC escalators at metro stations of the first and second metro diameters of the Sofia metro, incl. delivery and installation of spare parts, by lot.
Main Site: Gr. Sofia
Lot 1 includes post-warranty maintenance for 29 ORONA lifts. When executing the order, ythe private party undertakes the obligations:
1. From the moment of signing the contract, keep the lifts in tech. good and safe. Comply with all the requirements of the Safety and Operations Regulations. supervision of elevators (SG No. 33 of 11.04.2003, amended and supplemented) and of the legislation in force for lifts; Comply with the instructions for maintenance instructions set out in the European Standard BDS-EN 13015: 2001 A1: 2009 or equivalent; To observe the normative documents for ensuring healthy and safe working conditions, according to the Law on Healthy and Safe Labor Conditions (SG, issue 124 of 1997, amended and supplemented); All Tech. during the maintenance of the lifts, be carried out in accordance with the manufacturer's instructions; To execute, within the given time limits, the prescribed prescriptions of the inspection documents of the State Technical Surveillance Inspectorate (IADT); Perform functional checks and tech. servicing the lifts at any time of the day; To carry out an emergency service to the facilities within 1 hour of receipt of the lift emergency stop signal; Release passengers in emergency stops of lift systems within the time limitk within 45 minutes of the notification; In the case of an elevator failure, make repairs and put it into service within 24 hours regardless of the day of the week (working or day off); For damage that can not be remedied immediately, a record shall be drawn up between the contractor and the assignor, which identifies the relevant malfunction and the necessary repairs for repair; In case, that the damage can not be remedied within 24 hours, the maximum period for repair and commissioning of the lift is up to 3 calendar days from the date of the protocol under item 11; The Contractor shall provide the necessary stock of spare parts and consumables in order to meet the deadline under item 12; Put on spare parts and consumables that are original, new and not recycledus. Consumables are: Lubricants, Fasteners, Signs, Lighting Lamps and Cleaning Agents; To provide in Bulgarian language a certificate of quality, origin, compliance, warranty terms and other tech. requirements for spare parts used for repair; The warranty period for the repairs and spare parts used is not more thanalcohol for 24 months; Do not allow a lift to work in. malfunction;
18. When stopping a lift, draw up a record with a representative of the assignor; Run the suspended lifts;
20. Participate in rescue operations, reviews, periodic revisions and inspections; To secure lifts and to place signs with warning signs to prevent hloops;
22. During maintenance, repairs, inspections or similar activities, access to lifts should be prohibited for unauthorized persons; To submit by the 20th of the previous month a schedule for the tech. servicing elevators with a specified date for approval by the assignor. It is necessary that the schedule does not obstruct the operation of the subway. To provide their own transport, techn. means(tools, testers, fittings, work equipment, a professional vacuum cleaner) and equipment for maintenance and repair of lifts; Take at its own expense the necessary measures to protect elevators from significant environmental dangers such as water leaks and floods; To maintain a valid general liability insurance.
Valid for both distinct-positions: the participant must be entered in the register under Art. 36, para. (1) of the Law on Technical Requirements to Products (LTRP), and for foreign persons - analogous registers according to the legislation of the Member State in which they are established ..
The information is given in Part IV: "Selection Criteria", Section A: from EEDOP - Document proving the requirement - copy of the entry documentin the register if it is not available in a public electronic register. The document shall be submitted by the tenderer selected as contractor prior to the conclusion of the contract. The document shall also be submitted to subcontractors and third parties, if any. The document may also be required under the conditions of Art. 67, para. 5 of the PPL.
None
According to art. 67, para. 1 of the PPL when submitting a tender, the participant declares the absence of an axleremoval from the procedure and compliance with the selection criteria through the presentation of the EEDOP. Documents demonstrating the information specified in EEDOP may be required additionally under the conditions of Art. 67, para. 5 of the Public Procurement Act. According to Art. 67, para. 6 of the Public Procurement Act before the conclusion of a public procurement contract, the tenderer appointed as a contractor shall submit current documents, verifying the lack of grounds for removal from the procedure and compliance with the selection criteria. Documents shall also be submitted to subcontractors and third parties, if any.
Requirements for performance of the contract: - According to CM Decree № 181 / 20.7.2009 / amended. by Decree No. 3 of the Council of Ministers of 10.1.2013), Metropolitan - Sofia is included in the list of strategic sites of significance fornational security. Persons who will perform activities related to the subject of the procurement of the sites of Metropolitan EAD should be authorized to work in strategic areas of a strategic site or in areas related to the implementation of strategic activity under Article 40, (1) (2) of the Law on the application of the Law on Attorneys at the stage of participation in the procedure: - Pursuant to Article 43, Paragraph 3 of the Rules of Procedureof the State Agency for National Security, the persons who will carry out a site inspection shall not be issued permits under Article 40, paragraph 1, item 2. The visitor shall be accompanied by an employee of Metropoliten EAD, authorized under Art. 40 para. 1, item 2. Visits to the site shall be made upon prior request (official letter to the Executive Director of Metropolitan EAD)or sent to the following e-mail:
[email protected], or by fax: 359 29877892. The letter shall state the name of the company, the names of the persons designated to carry out the inspection, e-mail, fax and telephone for feedback .
After the conclusion of the contract, the contractor shall submit to the contracting authority a list of the specialists who will participate in the execution of the procurementauthorization of work in strategic areas of a strategic site or in areas related to the implementation of strategic activity under Art. 40 para. 1, item 2 of the Law for the application of the law
Internet address (URL): http://www.metropolitan.bg