Object of the contractRepair and maintenance services of building installations
Description: Contract notice: Repair and maintenance services of building installations
Authority Type: Utilities entity
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: Lowest price
CPV code: 50700000, 50750000, 50700000, 50750000, 50740000
CPV Description: Repair and maintenance services of escalators
Post-warranty maintenance of elevators, platforms for disabled and escalators of first metro stations, elevators in the Central Dispatching Point building "and lifts in Obelya depot
Public service contractthey include post-warranty maintenance for elevators, platforms for disabled and escalators of metro stations from the first metro, elevators in the Central Dispatch Center and lifts in Obelya Depot, Corps 1, Hall 1, incl. supply and installation of spare parts - by lot. Main Site: Gr. Sofia Lot # 1 includes a subscription technical service17 emergency lifts TissenCrup and 7 platforms for disabled E 06 Vimec in first metro stations, 4 lifts in the central dispatch point and 2 lifts in the landfill Obelya, Corpus 1, Hall 1 (total of 30 pieces) During the execution of the contract the participant undertakes the following obligations:
1 From the moment of signing the contract to maintain-lifts in technical condition and safety
2. To comply with all the requirements of the Ordinance on the Safe Operation and Technical Supervision of Elevators (SG 33 / 11.04.2003, amended and supplemented) and of the existing legislation for lifts; Comply with the maintenance instruction guidelines set out in European Standard BSS EN 13015: 2001 A1: 2009 or equivalent; To comply with the statutory directivesDocuments for ensuring healthy and safe working conditions in compliance with the Health and Safety at Work Act (SG, issue 124 of 1997, amended and supplemented); All Tech. during the maintenance of the lifts, be carried out in accordance with the manufacturer's instructions; To carry out, within the specified time limits, the prescribed instructions from the inspection documents of the State Inspectoratetechnical oversight (ITTN); Perform functional checks and technicians servicing the lifts at any time of the day; To carry out an emergency service to the facilities within 1 hour of receipt of the lift emergency stop signal; Release the passengers in the emergency stop of the lift facilities within 45 minutes of the notification; If a lift failure occurs, repair it and put it into service within 24 hours, regardless of the day of the week (working or day off); For damage that can not be remedied immediately, a record shall be drawn up between the contractor and the assignor, which identifies the relevant malfunction and the necessary repairs for repair; If the damage can not be rectified within 24 hours, then the maximumthe deadline for repairs and putting into operation of the lift is up to 3 calendar days from the date of the protocol under item 11,
13. The Contractor shall provide the necessary stock of spare parts and consumables in order to meet the deadline under item 12; Put on spare parts and consumables that are original, new and not recycled; To provide in Bulgarian language a certificate of quality, origin, compliance, warranty terms and other techniques. requirements for spare parts used for repair; The warranty period for the repairs and spare parts used is not less than 24 months; Do not allow a lift to work in. malfunction;
18. When stopping a lift, draw up a record with a representative of the assignor; To launch sprunning lifts; Participate in rescue operations, reviews, periodic revisions and inspections; To secure lifts and to place signs with warning signs to protect against accidents; During maintenance, repair, inspection or similar activities, access to lifts must be prohibited for unauthorized persons; To submit by the 20th of the previous onemonth schedule for tech. servicing of elevators with a specified date for approval by the assignor. To provide their own transport, techn. tools and equipment for the maintenance and repair of lifts; Take at its own expense the necessary measures to protect elevators from significant environmental dangers such as water leaks and floods; To maintain a valid insurerand general civil liability.
Applicable to the two lots: The participant must be entered in the register under Art. 36, para. (1) of the Law on Technical Requirements to Products and for foreign persons - analogous registers according to the legislation of the Member State in which they are established - The information is given in Part IV: "Selection Criteria", Section A: "Fitness" by EEDOP.
Document forproof of the requirement - a copy of the document for entry in the register if it is not available in a public electronic register. The document shall be submitted by the tenderer selected as contractor prior to the conclusion of the contract. The document shall also be submitted to subcontractors and third parties, if any. The document may also be required under the conditions of Art. 67, para. 5 of the PPL.
None
According to art. 67, para. 1 of the Public Procurement Act-the tenderer declares the lack of grounds for removal from the procedure and compliance with the selection criteria by submitting the EEDOP. Documents demonstrating the information specified in EEDOP may be required additionally under the conditions of Art. 67, para. 5 of the Public Procurement Act. According to Art. 67, para. 6 of the Public Procurement Act before the conclusion of the public procurement contract the participant, individual for a contractor, shall present up-to-date documents certifying the lack of grounds for removal from the procedure and compliance with the selection criteria. The documents are also submitted to the subcontractors and third parties, if any - Requirements for the execution of the contract: - According to CM Decree № 181 / 20.07.2009 (amended by Decree № 3 of the Council of Ministers of 10.01.2013), " Metropolitan - Sofia "is includedlisted in the list of strategic sites of national security importance. Persons who will perform activities related to the subject of the procurement of the sites of Metropolitan EAD should be authorized to work in strategic areas of a strategic site or in areas related to the implementation of strategic activity under Article 40, 1, item 2 of the Supplementary Prospectus Act
- At the stage of participation in Prothe Board:
On the grounds of Art. 43, para. 3 of the Rules for Implementation of the State Agency for National Security Act for the persons who will carry out inspection of the site shall not be issued permits under Article 40, paragraph 1, item 2. The visitor shall be accompanied by an employee of "Metropolitan" EAD, which received permission under Art. 40 para. 1, item 2. Visits to the site shall be made upon prior request (official letter to the execDeputy Director of METROPOLITEN EAD), entered in the registry or sent to the following e-mail:
[email protected], or by fax: 02 987 78 92. The letter specifies the name of the company, the names of the persons designated for execution inspection, e-mail, fax and feedback telephone
- After the conclusion of the contract, the contractor shall submit to the contracting authority a list of the specialists, who will participate in the execution of the contract, to obtain permission to work in strategic areas of a strategic site or in areas related to the implementation of strategic activity under Art. 40 para. 1, item 2 of the Law for the application of the law
Internet address (URL): http://www.metropolitan.bg
Directive: Classical Directive (2014/25/EU)